HomeMy WebLinkAbout2021-09-28 Design Review Comm Minutes CITY OF CALDWELL APPROVED
DESIGN REIVEW COMMISSION MINUTES
Community Room,Caldwell Police Department 'l h
IU
110 South 5th Avenue,Caldwell,Idaho `Date
September 28,2021 12:00PM
CALL TO ORDER- Commissioner Dodge called the meeting to order at approximately 12:00 p.m.
Commission Present:Tressa Dodge, and Nicole Dovel-Moore
Commissioners Absent:Tyler Morgan
Staff Members Present: Jerome Mapp,Planning Director;April Cabello, Planning Technician
Staff Members Absent: none
I. CONSENT CALENDAR: [All consent Calendar items are considered action items]
1. Approve Minutes from the July 27,2021 meeting.
MOTION made by Commissioner Dovel-Moore to approve the minutes.
SECOND by Commissioner Dodge Passed:unanimous voice vote.
II. OLD BUSINESS:None.
III. NEW BUSINESS
ACTION ITEM:PUBLIC HEARING
Case Number DR21-000005:A request by John Bartin, GGLO Architects,for Design Review
approval for the Caldwell Creekside Mixed-Use Development located at on the southwest corner of
.7th and Main Street in the Caldwell City Center (C-C) District.
Commissioner Dovel-Moore stated for the record that her firm,Cushing Terrell has been under
contract with the City of Caldwell for approximately one year to design the streetscape for 7th and
Arthur streets,which is adjacent to the proposed project before the commission today. I want to
place in the record that Cushing Terrell has no financial connection to the Caldwell Creekside
project, and there is no conflict of interest.
1of6 I Page
Jerome Mapp,Planning t.,c)Zoning Director gave the staff report stating that the request before the
commission today is design review approval of Caldwell Creekside a mixed-use development
located at the southwest corner of 7th and Main Street.This is located in the City Center,within
the Central Business District. The applicant is proposing a five story mixed use development with
internal parking on the ground level. This structure is based on a 22,300 square foot retail space
with about 106,400 square feet of residential space,which includes decks,storage, and support
services as amenities. The apartments and retail surround the proposed parking area.The first
floor includes a mixed use of retail residential lobby and support services.The second floor is a mix
of residential space and support services.The third,fourth and fifth floors are residential space and
support services.The property is located in the City Center and residential development in the City
Center zoning district shall not be subject to any requirements listed in 10-02-03 table 2,which
deals with building heights,building setbacks,land area and those other land use requirements that
typically are found in other sections of the zoning ordinance.
The applicant has provided an extensive description of the project whereby they speak about the
design, concept,purpose,use of materials,and compatibility to surrounding area I will let the
applicant spend his time during the presentation to dwell into those areas. The applicant has
reviewed the design criteria in the design handbook and has provided documentation to support
those requirements along with the issue of parking.The applicant has proposed 62 parking spaces
where 228 parking spaces are required.The applicant is short 166 parking spaces and they are
currently going through a parking agreement with the City Attorney and the parking requirements
have been met. The proposal in detail provides a total of 38 studio apartments,69 one-bedroom
units,24 two-bedroom units and 8 live and work units. The applicant will explain what he means
by that type of use.The first floor will be a residential lobby,bicycle storage,retail,restaurant, and
office space. If the applicant chooses to provide office space on the first floor,they will have to
acquire a special use permit to do so. Arthur and Seventh Street are festival streets, any
development in the City Center must follow the design criteria regarding sidewalk curb, gutter and
other amenities associated with that.
Staff recommends approval of this request with conditions 8.3 through 8. 12.
Commissioner Dovel-Moore asked staff about offices on the first floor,balconies, and individual
outdoor space.
Mr. Mapp respond that a Special Use Permit will be required for the first-floor office space and the
applicant will describe their relationship,the indoor and outdoor space.
Mark Sindell, applicant's representative 1199 Shoreline Drive,Boise, ID gave testimony and stated
that they were involved in this renaissance of Caldwell with Indian Creek Plaza many years ago.
They are very intent on approaching this project in a way that continues the renaissance and
contributes to a vibrant downtown. The project will have a vibrant commercial frontage on the
ground floor and contribute to the festivals and events that they are so proud of that happen year-
round in the City of Caldwell.
2of6 I Page
A couple of things they',Joked at,is transparency,how do we get y ople through the project, and
make sure it is not a barrier.Whether you are coming over the pedestrian bridge, or through the
pedestrian alley, Indian Creek Plaza or even your South between this project and the future phase
two.We have those linkages very carefully identified, and we arranged the building to respond to
that very well so that it enhances the experience for the community,rather than be a barrier in any
way.We recognize there is important frontage on Main Street and there is also a very important
context of Indian Creek a beautiful,wonderful asset to the city.This is a project that respects and
pays homage and that is the basic premise and how we looked at the site's connectivity. Connecting
to Indian Creek and all the great things that are happening there,and then fitting in with the fabric
of Main Street.They studied the rhythm of the building facades and used that to scale our building
appropriately,so the project had that nuance,pedestrian scale and shopping feel along Main Street.
We broke the project down along the creek and made it a little bit more whimsical;we also wanted
to make sure that the parking was hidden from view. This is a people place,it is vibrant,parking is
necessary,but we do not want it to be the dominant feature that disrupts the commercial feel, and
the community centric feel of downtown. We started looking at how the building and the
landscape would come to be from a material standpoint.We wanted to get into the fold of Winter
Wonderland and how could this project fit into that.We looked at how to create these alleys,open
spaces, and pedestrian connectivity with nice materials at the ground plane and lighting. Looked at
how to leverage the city's ongoing reworking of Arthur Street and 7th Street as pedestrian centric
festival streets. They want to make sure that the materials used were interesting and warm,with a
high level of craft in detail. They paid attention to the storefront,facades,and rhythm,they want to
be forward looking and help the city evolve,but based on that premise of the historic context that it
fits in. The materials that we choose are in keeping with downtown while being forward looking
and setting a tone for future development.They want the project on the creek to be a little bit more
whimsical, the window patterns change, and they are looking at materials that are a nice backdrop
for lighting for Winter Wonderland. Parking is tucked behind,but they want access for the
residents out to what we are calling a Paseo,which is a pass through with ground floor retail
outdoor space,nice finishes,that helps the project really be transparent and connect people
through it.
Geoffrey Parks,applicant's representative, 1199 Shoreline Ln, Boise ID. Shared that he is with
GGLO Architects and that they are looking at a four to five story building that presents itself as a
five-story building at 7th and Main Street.The ground floor retail spaces are double height spaces
so while the building reads as a five-story building,technically those parts of the building are a
four-story building with a with a nice volume of space for that retail on that ground level.The
resident entry is on the western side of the building,lobby space for the apartments,and a fitness
area as well on the ground level. The residential units are above on levels two through five with the
fifth-floor amenity space being the balcony that overlooks the creek. They are using a brick
framework that is facing out toward the streets,then aluminum canopies. The windows are a dark,
almost black vinyl window with dark effects on Main Street side that also accents pulling those
darker accents around the building as well to help it all feel like a cohesive piece of architecture and
not just a random assemblage of parts and pieces. On the creek side of the building,they moved to
3of6IPage
•
a more neutral palette a11a tried to use a playful and interesting pa«ern of windows as they address
the creek.
Mr. Sindell stated that they have tried to fold in some elements of wood as a natural element to
bring some additional warmth to the building.We are using the landscape as a way to knit the
project together and to knit it in with downtown. They are working with Engineering for the
streetscapes,we are continuing the Indian Creek Plaza materials for the alleys and then we are also
extending some of the plant material of Indian Creek Plaza to really pay homage to the fact that
this is the entry the wine country and celebrate the agrarian and cultural history of Caldwell.
Mr. Mapp shared that he had left one important thing out regarding parking and our city code. For
the record current code,there is no requirement for residential parking so the request for
additional private parking has been made by the applicant and that the city is encouraging outdoor
dining. In addition, I would like to point out the passageway connects folks from Indian Creek
Plaza through phase one of the project to the next phase into the next block of downtown.
Commissioner Dovel-Moore confirmed that the applicant will use lighting of the building itself,as
part of the winter wonderland extension.
Mr. Sindell responded yes.
Commissioner Dovel-Moore asked how they are addressing trash and recycling.
Mr. Sindell stated that presently,there is a community kind of trash and recycling,that will be
going away,and our project will move its trash. Trash will be inside and out of view.When it
comes time for trash pickup,the cans are wheeled outside;the trash truck comes down Main Street
to pick up. If 7th Avenue becomes something other than a regular street and becomes more of a
festival Street,trash pickup gets difficult.Trash would be tucked in next to the resident parking
area. Trash room shoots work its way down through the apartment floors to a collection point in
the trash room.
Commissioner Dovel-Moore shared that is for your onsite trash and recycling and wondered if the
applicant had talked with the city about the buildings that abut the plaza. Is there any cross-access
easement when it comes to trash?
Mr. Parks stated that they are in current discussion with the city regarding trash.
Robb.McDonald, City Engineer stated that the city has looked at a couple different areas for trash
and the primary area that they are looking at is one that's in the alley, a couple blocks east of this
location behind the post office. It is probably going to be the home of a new trash enclosure or at
least some large compactors that that the tenants in the plaza can continue to use but the city is still
working on that.
4of6I Page
Commissioner Dovel-More asked about lighting for the parking tot,stated that there is
residential, and have to be sensitive to people sleeping,but you have to have lighting in the parking
lot for safety.
Mr. Sindell responded yes,but the other issue is dark sky compliance and are using dark sky
compliant shielding fixtures to make sure that that light is directed down and not polluting the
night sky or shining to the resident's windows.
Commissioner Dodge stated that she thought she saw in the application gooseneck lighting.
Mr. Parks responded that was probably in a rendering,but they are still deciding.
Commissioner Dodge question about the development's interaction with Vern's Bar.
Mr. Parks stated that along Arthur they pulled back from Vern's and have hope for some sort of
cool local food and beverage on that first-floor area.They created a little spill out space to give
Vern's a little breathing room and to create seating and lighting and a nice little buffer between the
two.We also think that was a nice way to tie it together.The building is developed on the upper
levels to look over it but not too obtrusive and not creating conflicts.
Commissioner Dodge asked about the parallel parking along 7th Avenue.
Mr. Sindell stated that the applicant appreciates the city's vision to have these festivals streets so 7th
it will be a decorative street with nice paving and function that way,we also want to make sure the
practical side of things are met with parking if needed and for retail on both sides of 7th.
Commissioner Dodge asked if they could explain the balcony.
Mr. Sindell responded that it is residential,a reliable gathering space for residents on the top floor,
and a covered deck as a residential amenity.
Commissioner Dovel-Moore stated that the apartment side,looking at the building from the creek
on those very flat walls, detailing windows is extremely important so that your building does not
appear to be cheap.The finishes on the surface,the black being extremely flat and matte so that it
gives that character of richness that sometimes is not associated with EFIS and then I was curious
for your choice on the texture on the gray and the white.
Mr. Sindell responded they were looking for something that felt a little bit atypical and a little bit
more formal again for those more formal sides of the building. Our thought is that the building
becomes a little bit more background at that point.
5of6I Page
Authentislgn ID:6C825DAB-96FC-4828.931B-A36F585DED43
Mr. Sindell shared that some of the other amenities that they are proposing for this development
are bicycle racks,benches, and bollards,but also the possibility of doing some type of artwork or
mural.
MOTION to close the public testimony made by Commissioner Dovel-Moore SECOND made by
Commissioner Dodge Passed:unanimous voice vote.
FINDING OF FACT:
The Design Review Commission accepts the general facts as outlined in the staff report,public
testimony,and the evidence list.MOTION: Commissioner Dovel-Moore SECOND:
Commissioner Dodge. Passed: unanimous voice vote.
CONCLUSION OF LAW:
The Design Review Commission accepts the Conclusions of L as outlined in the staff report.
MOTION: Commissioner Dovel-Moore SECOND: Commissioner Dodge.Passed:unanimous
voice vote.
ORDER OF DECISION FOR DR21-000005 (Caldwell Creekside Design Review) MOTION:
Commissioner Dovel-Moore that Case Number DR21-000005 be approved with the following
conditions 8.2 through 8.12 with the addition to 8.7 or as approved by the Planning Director.
IV. Adjournment
MOTION TO ADJOURN:Commissioner Dovel-Moore
SECOND made by Commissioner Dodge
Passed:Unanimous voice vote.
The meeting was adjourned at approximately 1:20 p.m.
Respectfully submitted by April Cabello,
MINUTES APPROVED AND SIGNED BY THE CHAIR, ON THE DATE NOTED BELOW:
rAuthentistcrr J fleooa Dodge 10/22/2021
1utuej 1:eb:1bI- MUr
Commissioner Tressa Dodge, Chair Date
AT T:
Je Mapp,Planning erector
6of61 Page