HomeMy WebLinkAboutL1.0 Doughty Multi Family Overall Landscape PlanUPUP
UP
UPUPUP
UP
UPUPUP
UP
UPUPUP
UP
UPUPUP
UP
UPUPUP
UP
UPUPUP
UP
UPUPUP
UP
UPUPUP UP
UPUPUP
UP
UPUPUP UP
UPUPUP UP
UPUPUP
UP
UPUPUP UP
UPUPUP UP
UPUPUP UPUPUPUP UPUPN00°17'41"W 450.80'S00°12'27"E 636.51'N03°27'13"E 186.16'N89°52'54"W 332.07'
S89°51'30"E 114.69'
S89°51'30"E 206.18'
WEST ELM STREET
WEST LOGAN STREET
1
2
3
4
5
6
78
9
10
11
12
17
16
15
14
13
SCALE:
0
1"= 50'-0"
50 100 15050
OVERALL LANDSCAPE PLAN
LANDSCAPE NOTES:
1.CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR AND/OR PREVENT THE
PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK.
2.NO MATERIAL SUBSTITUTIONS SHALL BE MADE WITHOUT THE LANDSCAPE ARCHITECT'S PRIOR WRITTEN
APPROVAL. ALTERNATE MATERIALS OF SIMILAR SIZE AND CHARACTER MAY BE CONSIDERED IF SPECIFIED PLANT
MATERIALS CAN NOT BE OBTAINED.
3.COORDINATE ALL WORK WITH ALL OTHER SITE RELATED DEVELOPMENT DRAWINGS.
4.COORDINATE WORK SCHEDULE AND OBSERVATIONS WITH LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION
START-UP.
5.ALL PLANT MATERIAL SHALL BE INSTALLED AS PER DETAILS.
6.ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN.
PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION.
7.IN THE EVENT OF A PLANT COUNT DISCREPANCY, PLANT SYMBOLS SHALL OVERRIDE SCHEDULE QUANTITIES AND
CALL OUT SYMBOL NUMBERS.
8.ALL PLANTING BEDS SHALL BE COVERED WITH A MINIMUM OF 3" DEPTH OF 1" MINUS BARK MULCH OVER DEWITT
PRO-5 WEED BARRIER LANDSCAPE FABRIC. SUBMIT SAMPLE FOR APPROVAL.
9.ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF
ACCEPTANCE BY THE OWNER. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY CONDITION
IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO COST TO THE OWNER.
10.FINISH GRADES SHALL PROVIDE A SMOOTH TRANSITION WITH ADJACENT SURFACES AND ENSURE POSITIVE
DRAINAGE IN ACCORDANCE WITH THE SITE CIVIL GRADING PLAN.
11.AMEND EXISTING APPROVED TOPSOIL AT A RATIO OF THREE CUBIC YARDS OF APPROVED COMPOST PER 1000
SQUARE FEET. ROTO-TILL ORGANIC MATTER A MINIMUM OF 6 INCHES INTO TOPSOIL.
12.FERTILIZE ALL TREES AND SHRUBS WITH 'AGRIFORM' PLANTING TABLETS. QUANTITY PER MANUFACTURER'S
RECOMMENDATIONS.
13.ALL PLANTING BEDS SHALL HAVE A MINIMUM 18" DEPTH OF TOPSOIL. LAWN AREAS SHALL HAVE A MINIMUM 12"
DEPTH OF TOPSOIL. SPREAD, COMPACT, AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE 3" BELOW
ADJACENT SURFACES OF PLANTER BED AREAS, 1-1/2" BELOW ADJACENT SURFACES OF TURF SOD AREAS, AND 1"
BELOW ADJACENT SURFACES OF TURF SEED AREAS.
14.REUSE EXISTING TOPSOIL STOCKPILED ON THE SITE. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES
ARE INSUFFICIENT. VERIFY SUITABILITY AND CONDITION OF TOPSOIL AS A GROWING MEDIUM. PERFORM SOIL
TEST/ ANALYSIS AND PROVIDE ADDITIONAL AMENDMENT AS DETERMINED BY SOIL TESTS. TOPSOIL SHALL BE A
LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS WEEDS, WEED SEEDS, ROCKS,
GRASS OR OTHER FOREIGN MATERIAL AND A HAVE A PH OF 5.5 TO 7.0. IF ONSITE TOPSOIL DOES NOT MEET THESE
MINIMUM STANDARDS, CONTRACTOR IS RESPONSIBLE TO EITHER:
A) PROVIDE APPROVED IMPORTED TOPSOIL, OR
B) IMPROVE ON-SITE TOPSOIL WITH METHODS APPROVED BY THE LANDSCAPE ARCHITECT.
15.IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, ENSURE IT IS FERTILE, FRIABLE, NATURAL LOAM,
SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF
ROOTS, STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC
MATTER HARMFUL TO PLANT GROWTH.
A) OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS TO
THOSE FOUND ON THE PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY, WELL-DRAINED SITES WHERE
TOPSOIL OCCURS AT A DEPTH OF NOT LESS THAN 4 INCHES.
B) REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY, TOXICITY, AND GENERAL TEXTURE
BY A RECOGNIZED COMMERCIAL OR GOVERNMENT AGENCY AND COPIES OF THE TESTING AGENCY'S FINDINGS
AND RECOMMENDATIONS SHALL BE FURNISHED TO THE OWNER'S REPRESENTATIVE BY THE CONTRACTOR. NO
TOPSOIL SHALL BE DELIVERED IN A FROZEN OR MUDDY CONDITION. ACIDITY/ALKALINITY RANGE - PH. 5.5 TO 7.6.
16.IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE OPERATIONS
AND DISPOSE OF PROPERLY OFF SITE.
17.TREES SHALL NOT BE PLANTED WITHIN THE 10'-0" CLEAR ZONE OF ALL STORM DRAIN PIPE, STRUCTURES, OR
FACILITIES.
18.STORM DRAINAGE FACILITIES MUST BE PROTECTED FROM ANY AND ALL CONTAMINATION DURING THE
CONSTRUCTION AND INSTALLATION OF THE LANDSCAPE IRRIGATION SYSTEM.
19.IN THE EVENT OF A DISCREPANCY, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY.
1.ALL AREAS TO BE PLANTED OR HYDROSEEDED SHALL HAVE WEED ABATEMENT OPERATIONS PERFORMED ON
THEM PRIOR TO PLANTING OR HYDROSEEDING.
2.CONTRACTOR SHALL SPRAY ALL EXPOSED WEEDS WITH “ROUND-UP” (CONTACT HERBICIDE) OR APPROVED EQUAL.
3.DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE EXPOSED WEEDS FROM THE SITE.
4.CONTRACTOR SHALL OPERATE THE AUTOMATIC IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN (14) DAYS. AT
CONCLUSION OF THIS WATERING PERIOD, DISCONTINUE WATERING FOR THREE TO FIVE (3-5) DAYS.
5.APPLY SECOND APPLICATION OF “ROUND-UP” TO ALL EXPOSED WEEDS. APPLY IN STRICT CONFORMANCE WITH
MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE
WEEDS FROM THE SITE.
6.IF ANY EVIDENCE OF WEED GERMINATION EXISTS AFTER TWO (2) APPLICATIONS, CONTRACTOR SHALL BE
DIRECTED TO PERFORM A THIRD APPLICATION.
7.AT THE TIME OF PLANTING AND HYDROSEEDING, ALL PLANTING AREAS SHALL BE WEED FRee.
WEED ABATEMENT NOTES:
DECIDUOUS TREE PLANTING1 NOT TO SCALE
SOIL LINE
ROOT FLARE TO BE AT SOIL LINE
NOTES:
1.REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP 23 OF ROOTBALL. REMOVE ALL NAILS, TIES, AND PLASTIC FROM
ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY
BIODEGRADABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL.
2.THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO ENSURE
THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR
AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE
WARRANTY PERIOD.
3.IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE
ARCHITECT BEFORE PROCEEDING.
4.LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT
MATERIAL.
5.WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING
METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE.
6.WATER TREE TWICE WITHIN THE FIRST 24 HOURS.
7.IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY.
8.FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8'-0" IN WIDTH, PROVIDE TREE ROOT BARRIER (DEEPROOT
#24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND EDGE OF SIDEWALK. ALL TREE INSTALLATIONS
SHALL CONFORM TO ALL AGENCY APPROVAL REQUIREMENTS, CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS.
REMOVE DEAD/DAMAGED BRANCHES AND
PRUNE TO INTERNATIONAL SOCIETY OF
ARBORICULTURE STANDARDS; IMPROPERLY
PRUNED TREES (AS DETERMINED BY THE
LANDSCAPE ARCHITECT) SHALL BE REMOVED
AND REPLACED. DO NOT REMOVE MAIN
LEADER!!
RUBBER CINCH TIE
2"x 2" WOOD STAKE (LENGTH AS
REQUIRED)-DO NOT PENETRATE ROOTBALL.
SEE NOTE 1. SET STAKES PARALLEL TO
PREVAILING WIND.
REMOVE TREE WRAP TRUNK PROTECTION,
AFTER INSTALLATION
CONSTRUCT 2" EARTH BERM AT EDGE OF
ROOTBALL, FILL TREE RING W/ MULCH, AS
SPECIFIED.
3" THICK MULCH LAYER, KEEP MULCH 3" AWAY
FROM TRUNK.
FINISH GRADE
PREVAILING WIND DIRECTION
COMMERCIAL SLOW RELEASE FERTILIZER
TABLETS
SIDES OF HOLE ROUGH & UNEVEN
BACKFILL WITH APPROVED TOPSOIL AND
SOIL AMENDMENTS AS SPECIFIED.
BACKFILL IN 6" LIFTS, WATER EACH LAYER,
TAMP LIGHTLY AS REQUIRED, BACKFILL
SOIL EVEN W/ TOP OF ROOTBALL,
DO NOT OVER COMPACT!!
SET ROOTBALL ON NATIVE, UNDISTURBED
SOIL
CONIFEROUS TREE PLANTING3 NOT TO SCALE
SOIL LINE
ROOT FLARE TO BE AT SOIL LINE.
REMOVE DEAD/DAMAGED BRANCHES AND
PRUNE TO INTERNATIONAL SOCIETY OF
ARBORICULTURE STANDARDS; IMPROPERLY
PRUNED TREES (AS DETERMINED BY THE
LANDSCAPE ARCHITECT) SHALL BE REMOVED
AND REPLACED. DO NOT REMOVE MAIN
LEADER!!
RUBBER CINCH TIE
2"x 2" WOOD STAKE (LENGTH AS
REQUIRED)-DO NOT PENETRATE ROOTBALL.
SEE NOTE 1. SET STAKES PARALLEL TO
PREVAILING WIND.
CONSTRUCT 2" EARTH BERM AT EDGE OF
ROOTBALL, FILL TREE RING W/ MULCH, AS
SPECIFIED.
3" THICK MULCH LAYER, KEEP MULCH 3" AWAY
FROM TRUNK.
FINISH GRADE
PREVAILING WIND DIRECTION
COMMERCIAL SLOW RELEASE FERTILIZER
TABLETS
SIDES OF HOLE ROUGH & UNEVEN
BACKFILL WITH APPROVED TOPSOIL AND
SOIL AMENDMENTS AS SPECIFIED.
BACKFILL IN 6" LIFTS, WATER EACH LAYER,
TAMP LIGHTLY AS REQUIRED, BACKFILL
SOIL EVEN W/ TOP OF ROOTBALL,
DO NOT OVER COMPACT!!
SET ROOTBALL ON NATIVE, UNDISTURBED
SOIL
NOTES:
1.REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP 23 OF ROOTBALL. REMOVE ALL NAILS, TIES, AND PLASTIC FROM
ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY
BIODEGRADABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL.
2.THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO ENSURE
THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR
AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE
WARRANTY PERIOD.
3.IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE
ARCHITECT BEFORE PROCEEDING.
4.LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT
MATERIAL.
5.WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING
METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE.
6.WATER TREE TWICE WITHIN THE FIRST 24 HOURS.
7.IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY.
SHRUB PLANTING5 NOT TO SCALE
1.SHRUB SHALL BEAR SAME RELATIONSHIP TO GRADE AS IT DID IN NURSERY.
2.WATER SHRUB TWICE WITHIN FIRST 24 HOURS.
3.THIN BRANCHES AND FOLIAGE BY 13.
4.DO NOT CUT LEADERS TO RETAIN NATURAL SHRUB SHAPE.
5.FOR CONTAINER GROWN PLANTS THAT ARE ROOTBOUND, SPLIT THE ROOTBALL WITH 3 EQUAL SPACED
VERTICAL CUTS.
NOTES:
REMOVE ANY PLASTIC, BURLAP, NAILS, OR OTHER
MATERIALS FROM THE ROOTBALL WHICH MAY LIMIT
ROOT GROWTH
CONSTRUCT 2" EARTH BERM TO FORM A WATER
RETENTION BASIN, FILL BERM WITH MULCH, AS
SPECIFIED
MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO
NOT COVER CROWNS OF PLANTS
PROVIDE COMMERCIAL FERTILIZER TABLETS AND
BIOSTIMULANT, AS SPECIFIED, FOR EACH SHRUB
BACKFILL WITH APPROVED TOPSOIL AND SOIL
AMENDMENTS, AS SPECIFIED. BACKFILL IN 6" LIFTS,
WATER EACH LAYER, DO NOT TAMP OR OVER
COMPACT.
CONSTRUCT 6" MOUND OF TOPSOIL
GROUNDCOVER PLANTING4 NOT TO SCALE
SECTION
PLAN VIEW
1.ALL GROUNDCOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIANGULAR PATTERN.
2.APPLY SPECIFIED PRE-EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL GROUNDCOVER
BEDS.
NOTES:
FINISH GRADE PER PLANS
GROUNDCOVER PLANTING PER PLANTING PLAN
MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED.
DO NOT COVER CROWNS OF PLANTS
TILL SOIL TO A DEPTH OF 12", BACKFILL WITH
APPROVED TOPSOIL AND SOIL AMENDMENTS, AS
SPECIFIED.
SUBGRADE
A = LENGTH, AS SPECIFIED
OR PER PLANT SCHEDULE
B = 85% OF 'A'
PLANTER BED CUT EDGE
(TYPICAL AT TREES IN TURF AREAS)2 NOT TO SCALE
APPROVED TOPSOIL AND SOIL
AMENDMENTS AS SPECIFIED
3" DEPTH OF MULCH AT PLANTER
BEDS
FINISH GRADE,
PER PLANS
PROJECT INFORMATION
LANDSCAPE REQUIREMENTS
TOTAL PROPERTY SIZE= 189,247 S.F. - 4.34 ACRES
CURRENT ZONING DISTRICT= R-1
PROPOSED ZONING DISTRICT= R-3
LOT IMPROVEMENTS AREA= 189,247 S.F.
BUILDING COVERAGE: 48,858 S.F.
HARDSCAPE COVERAGE: 73,688 S.F.
LANDSCAPE COVERAGE: 66,701 S.F.
COMMON OPEN SPACE REQUIRED: 10%, 17,225 S.F. - 0.39 ACRES
COMMON OPEN SPACE PROVIDED: 11.7, 113 S.F. - 0.51 ACRES
NUMBER OF PARKING STALLS PROVIDED:
98 STANDARD STALLS
0 COMPACT STALLS
4 ADA STALLS
TOTAL: 102 STALLS
NUMBER OF BICYCLE PARKING SPACES REQUIRED:
(1 STALL/2 UNITS) = 34 BICYCLE STALLS
NUMBER OF BICYCLE PARKING SPACES PROVIDED:
PROPOSED SEVEN RACKS (ONE RACK = 5 STALLS)
TOTAL NUMBER OF TREES: 74
TOTAL NUMBER OF TREE SPECIES: 8
PROVIDED PARKING LOT TREES - 15
LANDSCAPE BUFFER REQUIREMENTS:
WEST LANDSCAPE BUFFER
637 LIN. FT.
10 FT. BUFFER PROVIDED
REQUIRED TREES - 18
PROVIDED TREES - 18
NORTH BOUNDARY LANDSCAPE BUFFER
(W LOGAN STREET)
129 LIN. FT.
10 FT. BUFFER PROVIDED
REQUIRED TREES - 4
PROVIDED TREES - 5
REQUIRED SHRUBS - 18
PROVIDED SHRUBS - 20
EAST BOUNDARY LANDSCAPE BUFFER
637 LIN. FT.
10 FT. WIDTH BUFFER PROVIDED
REQUIRED TREES - 18
PROVIDED TREES - 18
SOUTH BOUNDARY LANDSCAPE BUFFER
(W ELM STREET)
253 LIN. FT. TOTAL
10 FT. BUFFER PROVIDED
REQUIRED TREES - 7
PROVIDED TREES - 7
REQUIRED SHRUBS - 36
PROVIDED SHRUBS - 38
D
C
B
A
1 2 3 4 5 6
1 2 3 4 5 6
D
C
B
A
L-1.0
LANDSCAPE
PLANDESCRIPTION- COMMENTSDATEDELTAHATCH DESIGNARCHITECTURE6126 W. STATE ST.BOISE, IDAHO 83703OFFICE: (208) 475-3204FAX: (208) 475-3205THIS PLAN AND/OR DESIGN ARE NOT TO BE CHANGED ORCOPIED IN ANY FORM, NOR ARE THE DOCUMENTS TO BEASSIGNED TO A THIRD PARTY WITHOUT WRITTEN CONSENTAND PROPER COMPENSATION TO HATCH DESIGNARCHITECTURE.THE USE OF THE PLANS SHALL BE RESTRICTED TO THEORIGINAL SITE FOR WHICH THEY WERE PREPARED.DRAWINGS, SPECIFICATIONS AND OTHER DOCUMENTS,INCLUDING THOSE IN ELECTRONIC FORM, PREPARED BYTHE DESIGNER AND THE DESIGNER'S CONSULTANTS AREINSTRUMENTS OF SERVICE FOR USE SOLELY WITH RESPECTTO THIS PROJECT. THE DESIGNER AND THE DESIGNER'SCONSULTANTS SHALL BE DEEMED THE AUTHORS ANDOWNERS OF THEIR RESPECTIVE INSTRUMENTS OF SERVICEAND SHALL RETAIN ALL COMMON LAW, STATUTORY ANDOTHER RESERVED RIGHTS, INCLUDING COPYRIGHTS.SHEET TITLE
SHEET NUMBER
SHEET
DATE:
JOB NUMBER:
AUGUST 2019
DRAWN BY:
CHECKED BY:BSS
LPCOPYRIGHT 2019HATCH DESIGNARCHITECTURELOGAN STREETNEW MULTIFAMILY HOUSING FOR:CALDWELL, ID19130/19044
PROGRESS SET
NOT FOR
CONSTRUCTION
reandpartners.com + 208-514-3300 + 1014 S. La Pointe, Boise, Idaho 83706LANDSCAPE ARCHITECTURE+ URBAN DESIGN+ LAND PLANNING+ GRAPHIC COMMUNICATION+ PROJECT MANAGEMENT