Loading...
HomeMy WebLinkAbout40314 L1.0WHEN PRESENT, BUD PREVAILING WING aIRECTIQN WHEN PRESENT. BUD POINT (A MINOR POINT (A MINOR PREVAILING INa aIEGIN CROOK IN THE TRUNK CROOK IN THE TRUNK JUST ABOVE THE SOIL ROOT FLAREfCOLLAR JUST ABOVE THE SAIL ROOT FLARE/COLLAR (SWELLING AT SOIL LINE ERE LINE) TO BE 1-2" (SWELLING AT SOIL LINE LINE) TO BE 1—`" STEM TISSUE TRANSITIONS INTO ROOT TISSUE) TO BE ABOVE THE SOIL LINE AT SOIL LINE. REMOVE DEADIDAMAGED BRANCHES ABOVE THE SOIL LINE WHERE STEM TISSUE ROOT PROBE AND PRUNE TO INTERNATIONAL TRANSITIONS INTO ROOT SOCIETY OF ARBORICULTURE TISSUE) TO BE AT SOIL STANDARDS; IMPROPERLY PRUNED LINE. a REMOVE DEAD/DAMAGED i� 4® BRANCHES AND PRUNE TO SOIL,.. LINE � TREES (AS DETERMINED BY THE ROOT PROBE INTERNATIONAL SOCIETY OF LANDSCAPE ARCHITECT) SHALL BE aARBORICULTURE STANDARDS; REMOVED AND REPLACED, ' SOIL LINE IMPROPERLY PRUNED TREES TREE WRAP TRUNK PROTECTION, (AS DETERMINED BY THE LANDSCAPE ARCHITECT) SHALL REMOVE AFTER INSTALLATION BE REMOVED AND REPLACED. ° RUBBER CINCH TIE RUBBER CINCH TIE HIGHEST ROOT SHALL BE 2" 2"x 2" CEDAR STAKE (LENGTH AS ° o$ 2`°x 2"x '� 0" CEDAR MAXIMUM BELOW REQUIRED) —DO NOT PENETRATE ° STAKE —DO NOT PENETRATE SOIL LINE. UTILIZE ROOTBALL, SEE NOTE 1. SET HIGHEST ROOT SHALL 4 ROOTBALL. SEE NOTE 1. SET SOIL/ROOT PROBE STAKES PARALLEL TO PREVAILING BE 2" MAXIMUM ca r STAKES PARALLEL TO AROUND TRUNK WIND. BELOW SOIL LINE. PREVAILING WIND. (APPROX 1"-2" UTILIZE SOIL/ROOT AWAY FROM 3" THICK BARK MULCH LAYER, KEEP PROBE AROUND 3" THICK BARK MULCH LAYER, TRUNK) TO LOCATE BARK MULCH 3" AWAY FROM TRUNK, TRUNK (APPROX KEEP BARK MULCH 3" AWAY HIGHEST ROOTS. 1"-2" AWAY FROM FROM TRUNK. BACKFILL WITH SOIL PLANTING MIX. SEE SPECIFICATIONS FOR ADDITIONAL TRUNK) TO LOCATE INFORMA TION. HIGHEST ROOTS. BACKFILL WITH SOIL PLANTING REMOVE BURLAP, TWINE, AND MIX. SEE SPECIFICATIONS FOR WIRE BASKET FROM TOP 112F I' - I -� r r ADDITIONAL INFORMATION. OF ROOTBALL, REMOVE ALL ` 1 I r t FINISH GRADE REMOVE BURLAP, TWINE, AND NAILS, TIES, AND PLASTIC# # i WIRE BASKET FROM TOP 112 FROM ROOTBALL. IFI �� r°, ,° y/ 1 ADE OF ROOTBALL, REMOVE ALLFINISH GR Y �.,° �' `4 ` r , a 1 ��; SYNTHETIC BURLAP IS i COMMERCIAL SLOW RELEASE NAILS, TIES, AND PLASTICt UTILIZED TO WRAP THE .��� �{ FERTILIZER TABLETS FROM ROOTBALL. IF COMMERCIAL SLOW RELEASE ROOTBALL, IT SHALL BE i SYNTHETIC BURLAP IS ---1� , ;4. :. COMPLETELY REMOVED. ONLY IL I °i 1 � � 1 1=1 =- I SET RQQTBALL ON NATIVE t ,, :.s: ,°,. FERTILIZER TABLETS UNDISTURBED SUBSOIL UTILIZED TO WRAP THE BIODEGRADEABLE BURLAP --- i �-- �-� ROOTBALL,IT SHALL BE _ff cc .`��` `, U .�\ `h, , .`\=-- I I':�` `` .. `�\�\ �,, 1 = SET ROOTBALL ON NATIVE SHALL BE LEFT ON THE \ , \. COMPLETELY REMOVED. ONLY --- UNDISTURBED SUBSOIL BOTTOM OF THE ROOTBALL. ►i I I El I I BIODEGRADEABLE BURLAP = I II I I —I �� III —I I II I- 2x ROOTBALL DIAMETER SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. 2x ROOTBALL DIAMETER 3x ROOTBALL DIAMETER NOTES: 13x ROOTBALL DIAMETER NOTES: 1. THE STAKING OFTREES IS TO BE THE CONTRACTOR'SOPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO 1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FORA MINIMUM OF 1 YEAR. ALL INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE YEAR WARRANTY PERIOD. STAKING SHALL BE REMOVED AT THE END OF THE ONE YEAR WARRANTY PERIOD. 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. LANDSCAPE ARCHITECT BEFORE PROCEEDING. 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. MATERIAL. 4. WRAP RUBBERCINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHERTHE STANDARD OR FIGURE EIGHT 4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE, TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 5. WATER TREE TWICE ITHI THE FIRST 24 HOURS. 5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. 6. IN THE VENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. IMMEDIATELY. jo� It of AU0 1 2 1 2 1% 1 f 's TREE ECIUUU T "R' E E rP % L A I"N" T I N GO* NOT TO SCALE NOT TO SCALE BARK MULCH WA TER RETENSION LAYER BASIN "--depth. \ �t y,^�' 4 ate. 4 ®ll. iI �I�TI. rl II I ICI I 1='` � �'` � `�� °, `�.., .., E`� �BACKFILL WITH SOIL COMMERCIA•, ^III1 I I�i I PLANTING MIX. SEE FERTILIZER = # II T SPECIFICATIONS FOR TABLE TS S I I I It,. I A 71 NA I tag ®i DD Q L �� `111 I I I i I _.__e 1� I I =1 I I�I 1111 I C 1 I I1 1 ''IIIIIIIII®I11� III=1IIIIIIIII''T INFORMATION, NOT TO SCALE VARK MULCH LAYER DEPTHwk ENTIRE BED. # NOT COVER CROWNS OF PLANTS. SOIL PLANTING k y • FOR ADDITIONAL SPLIT ALL ROOT BOUND ROOTS EQUAL 1. SET GROUND COVERS IN STAGGERED R.: AS r'. 2. SET PERENNIALS IN STa r'. PERENNIAL & GROUNDCOVLE: 10 WAAWN 11L I I I k�M"III NOT TO SCALE a MRAME i# R414 ' A r a A s w mom NOT TO SCALE -V w r SPAIN 'A' PACING'B' + 8"O.C. 6. " O.C. 8.66" O.C. ". ................ .,.,.,...«...........w�.+..........«».......... 12 ........1 ... Q C......, 4Q.." O. kk .C. 13.QQ" O.C. ' .8kk««O.Cb.......................15.60" O.C...... C. 2Q.8Q" C),. GOUDC VES A PERENNIALS TO 3Q" O.C. .«..«« .......................«...... 26,00" O.C. INSTALLED WITHTRIANGULAR SPACING 36" ...................«.,... 3Q.QQ" O.C. 2 New 10-1rih, Wax NOT TO SCALE •'COMMON NAME MUM ; MCIDN WSHADE-PEES— FRAXINUS . A,.. FLOWERING ORNAMENTAL ,CONIFER TREES Wlt mom -AIM ,. U : ;.. # M& GRASSES � - ♦ � : . � III �u ��II�Iwllllll Iw 11111 �kYl w# ILE G% E!".111 ru"' . LAWN (SOD) EDGING SEE DETAIL 5 SHEET L1.0 3'-4SANDSTONE BOULDERS C;Jl ANTITY 1* F PLANT IDENTIFICATION Y ET" SCALE:#1i 1 LANDSCAPE I % 1 U\ U N NOTES: I la 41h rIY i a' i _ #* • . r **# • i` ii i • * * #`• # it * # # + - # � WE LAND WCORPORAIM -Landscape Architecture • . i# # . # •. . ♦ i i- Civil Engineering -Site Planning -Golf Course Irrigation gineering ## ^# #• i * • * r * '+ •# • • #i' # . i i ' * • . is -Graphic Comraunication 462 East Shore Drive, Suite 100 Eagle, Idaho 83616 •# # a .! " * r ': * i:' ' ! � �; ## # . i• it '! . i * # •# www.thelandgroupinc.com ♦ • +► ' • - l � �N� I05250 Project Designed By: jta r . ♦ 1 By: 'Drawn Ch Issue Date: 4-10-06 #rr •* - i * #* ## • SCALE: # r Sheet Title: Landscape Plan