HomeMy WebLinkAbout40314 L1.0WHEN PRESENT, BUD PREVAILING WING aIRECTIQN WHEN PRESENT. BUD
POINT (A MINOR POINT (A MINOR PREVAILING INa aIEGIN
CROOK IN THE TRUNK CROOK IN THE TRUNK
JUST ABOVE THE SOIL ROOT FLAREfCOLLAR JUST ABOVE THE SAIL ROOT FLARE/COLLAR (SWELLING AT SOIL LINE ERE
LINE) TO BE 1-2" (SWELLING AT SOIL LINE LINE) TO BE 1—`" STEM TISSUE TRANSITIONS INTO ROOT TISSUE) TO BE
ABOVE THE SOIL LINE AT SOIL LINE. REMOVE DEADIDAMAGED BRANCHES
ABOVE THE SOIL LINE WHERE STEM TISSUE ROOT PROBE AND PRUNE TO INTERNATIONAL
TRANSITIONS INTO ROOT SOCIETY OF ARBORICULTURE
TISSUE) TO BE AT SOIL STANDARDS; IMPROPERLY PRUNED
LINE. a REMOVE DEAD/DAMAGED i�
4® BRANCHES AND PRUNE TO SOIL,.. LINE � TREES (AS DETERMINED BY THE
ROOT PROBE INTERNATIONAL SOCIETY OF LANDSCAPE ARCHITECT) SHALL BE
aARBORICULTURE STANDARDS;
REMOVED AND REPLACED,
'
SOIL LINE IMPROPERLY PRUNED TREES
TREE WRAP TRUNK PROTECTION,
(AS DETERMINED BY THE
LANDSCAPE ARCHITECT) SHALL REMOVE AFTER INSTALLATION
BE REMOVED AND REPLACED.
° RUBBER CINCH TIE
RUBBER CINCH TIE
HIGHEST ROOT
SHALL BE 2" 2"x 2" CEDAR STAKE (LENGTH AS
° o$ 2`°x 2"x '� 0" CEDAR MAXIMUM BELOW REQUIRED) —DO NOT PENETRATE
° STAKE —DO NOT PENETRATE SOIL LINE. UTILIZE ROOTBALL, SEE NOTE 1. SET
HIGHEST ROOT SHALL 4 ROOTBALL. SEE NOTE 1. SET SOIL/ROOT PROBE STAKES PARALLEL TO PREVAILING
BE 2" MAXIMUM ca r STAKES PARALLEL TO AROUND TRUNK WIND.
BELOW SOIL LINE. PREVAILING WIND. (APPROX 1"-2"
UTILIZE SOIL/ROOT AWAY FROM 3" THICK BARK MULCH LAYER, KEEP
PROBE AROUND 3" THICK BARK MULCH LAYER, TRUNK) TO LOCATE BARK MULCH 3" AWAY FROM TRUNK,
TRUNK (APPROX KEEP BARK MULCH 3" AWAY HIGHEST ROOTS.
1"-2" AWAY FROM FROM TRUNK. BACKFILL WITH SOIL PLANTING MIX.
SEE SPECIFICATIONS FOR ADDITIONAL
TRUNK) TO LOCATE INFORMA TION.
HIGHEST ROOTS. BACKFILL WITH SOIL PLANTING REMOVE BURLAP, TWINE, AND
MIX. SEE SPECIFICATIONS FOR WIRE BASKET FROM TOP 112F I' - I -� r r
ADDITIONAL INFORMATION. OF ROOTBALL, REMOVE ALL ` 1 I r t FINISH GRADE
REMOVE BURLAP, TWINE, AND NAILS, TIES, AND PLASTIC# # i
WIRE BASKET FROM TOP 112 FROM ROOTBALL. IFI
�� r°, ,° y/ 1 ADE
OF ROOTBALL, REMOVE ALLFINISH GR
Y �.,° �' `4 `
r , a 1 ��; SYNTHETIC BURLAP IS i COMMERCIAL SLOW RELEASE
NAILS, TIES, AND PLASTICt UTILIZED TO WRAP THE .��� �{ FERTILIZER TABLETS
FROM ROOTBALL. IF COMMERCIAL SLOW RELEASE ROOTBALL, IT SHALL BE i
SYNTHETIC BURLAP IS ---1� , ;4. :. COMPLETELY REMOVED. ONLY IL
I °i 1 � � 1 1=1 =- I SET RQQTBALL ON NATIVE
t ,, :.s: ,°,. FERTILIZER TABLETS
UNDISTURBED SUBSOIL
UTILIZED TO WRAP THE BIODEGRADEABLE BURLAP --- i �-- �-� ROOTBALL,IT SHALL BE _ff cc .`��` `, U .�\ `h, , .`\=--
I I':�` `` .. `�\�\ �,, 1 = SET ROOTBALL ON NATIVE SHALL BE LEFT ON THE
\ , \.
COMPLETELY REMOVED. ONLY --- UNDISTURBED SUBSOIL BOTTOM OF THE ROOTBALL.
►i I I El I I
BIODEGRADEABLE BURLAP = I II I I —I �� III —I I II I- 2x ROOTBALL DIAMETER
SHALL BE LEFT ON THE
BOTTOM OF THE ROOTBALL. 2x ROOTBALL DIAMETER 3x ROOTBALL DIAMETER
NOTES: 13x ROOTBALL DIAMETER NOTES:
1. THE STAKING OFTREES IS TO BE THE CONTRACTOR'SOPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO
1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FORA MINIMUM OF 1 YEAR. ALL
INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE YEAR WARRANTY PERIOD.
STAKING SHALL BE REMOVED AT THE END OF THE ONE YEAR WARRANTY PERIOD. 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE
2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING.
LANDSCAPE ARCHITECT BEFORE PROCEEDING. 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT
3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL.
MATERIAL. 4. WRAP RUBBERCINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHERTHE STANDARD OR FIGURE EIGHT
4. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE,
TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 5. WATER TREE TWICE ITHI THE FIRST 24 HOURS.
5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. 6. IN THE VENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT
6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY.
IMMEDIATELY.
jo� It of AU0 1 2 1 2 1% 1 f 's
TREE ECIUUU T "R' E E rP % L A I"N" T I N GO*
NOT TO SCALE NOT TO SCALE
BARK MULCH WA TER RETENSION
LAYER BASIN
"--depth.
\ �t y,^�'
4
ate.
4
®ll. iI �I�TI.
rl
II
I ICI I 1='` � �'` � `�� °, `�.., .., E`� �BACKFILL WITH SOIL
COMMERCIA•, ^III1 I I�i I PLANTING MIX. SEE
FERTILIZER
= #
II T
SPECIFICATIONS FOR
TABLE
TS S
I
I I It,.
I A 71 NA
I
tag
®i
DD Q L
�� `111 I I I i I _.__e 1� I I =1 I I�I 1111 I C 1 I I1 1
''IIIIIIIII®I11� III=1IIIIIIIII''T INFORMATION,
NOT TO SCALE
VARK MULCH LAYER
DEPTHwk
ENTIRE BED. # NOT COVER CROWNS OF
PLANTS.
SOIL PLANTING
k y •
FOR ADDITIONAL
SPLIT ALL ROOT BOUND ROOTS
EQUAL
1. SET GROUND COVERS IN STAGGERED R.: AS r'.
2. SET PERENNIALS IN STa r'.
PERENNIAL & GROUNDCOVLE:
10 WAAWN 11L I I I k�M"III
NOT TO SCALE
a
MRAME i# R414
' A r a A s
w
mom
NOT TO SCALE
-V w r
SPAIN 'A'
PACING'B'
+
8"O.C.
6. " O.C.
8.66" O.C.
". ................
.,.,.,...«...........w�.+..........«».......... 12
........1 ... Q
C......, 4Q.." O.
kk .C.
13.QQ" O.C.
'
.8kk««O.Cb.......................15.60"
O.C......
C. 2Q.8Q" C),.
GOUDC VES A PERENNIALS TO
3Q" O.C.
.«..«« .......................«......
26,00" O.C.
INSTALLED WITHTRIANGULAR SPACING
36"
...................«.,...
3Q.QQ" O.C.
2 New 10-1rih, Wax
NOT TO SCALE
•'COMMON
NAME
MUM ;
MCIDN WSHADE-PEES—
FRAXINUS
. A,.. FLOWERING
ORNAMENTAL
,CONIFER TREES
Wlt mom -AIM
,. U : ;.. #
M& GRASSES
� -
♦ � :
. � III
�u ��II�Iwllllll
Iw 11111 �kYl w#
ILE G% E!".111 ru"'
. LAWN (SOD)
EDGING SEE DETAIL 5 SHEET L1.0
3'-4SANDSTONE BOULDERS
C;Jl
ANTITY
1* F
PLANT IDENTIFICATION Y
ET"
SCALE:#1i 1
LANDSCAPE I % 1 U\ U N NOTES: I
la 41h
rIY i
a' i _ #* • . r **# • i` ii i • * * #`• # it * # # + - # �
WE LAND
WCORPORAIM
-Landscape Architecture
• . i# # . # •. . ♦ i i-
Civil Engineering
-Site Planning
-Golf Course Irrigation
gineering
## ^# #• i * • * r * '+ •# • • #i' # . i i ' * • . is
-Graphic Comraunication
462 East Shore Drive,
Suite 100
Eagle, Idaho 83616
•# # a .! " * r ': * i:' ' ! � �; ## # . i• it '! . i * # •#
www.thelandgroupinc.com
♦ • +► ' • -
l
� �N� I05250
Project
Designed By: jta
r . ♦
1 By:
'Drawn
Ch
Issue Date: 4-10-06
#rr •* - i * #* ## •
SCALE:
# r
Sheet Title:
Landscape Plan