HomeMy WebLinkAboutORD 3210r0 ;
RECORDED
CHRIS YAMAMOTO
CANYON COUNTY RECORDER
Pgs=4 LBERG NO FEE
BILL NO. 18 ORDINANCE
CITY OF CALDWELL
ORDINANCE NO. 3210
AN ORDINANCE OF THE CITY OF CALDWELL IDAHO, CREATING LOCAL
IMPROVEMENT DISTRICT NO, 194 FOR CALDWELL IDAHO, FOR THE
CONSTRUCTION OF CONCRETE CURB, GUTTER, DRIVEWAY APPROACHES,
PEDESTRIAN RAMPS, AND SIDEWALKS IMPROVEMENTS; PROVIDING FOR THE
LEVYING OF ASSESSMENTS UPON THE PROPERTY TO BE BENIFITTED BY SUCH
IMPROVEMENTS AND FOR THE BASIS OF MAKING SAID ASSESSMENTS;
SETTING FORTH THE PROPERTIES TO BE INCLUDED IN SAID DISTRICT,
PROVIDING FOR MAKING THE ASSESSMENT ROLL, AUTHORIZING THE
PUBLICATION OF A CALL FOR CONSTRUCTION BIDS.
NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND COUNCIL OF THE
CITY OF CALDWELL, IDAHO.
Section 1: There is hereby created, a local improvement district in the City of Caldwell, Idaho, to
be called Local Improvement District No. 19-1, for curb and sidewalk improvements; the
boundaries of the real property included herein are in accordance with the Resolution of Intention.
Which was therefore and hereby is adopted, ratified and approved; and the boundaries of said
district and real property included therein, all within the City of Caldwell , are described as
follows: to wit:
At various locations lying within the boundaries of the City of Caldwell
Section 2: The district is in the best interests of both the property affected and the City of Caldwell
and there is reasonable probability that the obligations of the district will be paid.
Section 3: The value of the property within the district, including the proposed improvements, is
sufficient.
Section As
The property shall be assessed for construction costs not paid by the City; said amount
is estimated to be $87,400.00 provided however, said costs shall not exceed the actual cost of
constructing the right-of-way improvements together with expenses set forth in section 5. The City
will pay 25% of each property owner's total construction costs.
Section 5: Each lot and parcel of land shall be separately assessed for said debt or cost and
expense by a front foot and/or square foot method of measurement in proportion to the benefits
derived to such property by said improvements or utility services which are optional with each
land owner and shall be assessed in proportion to the cost of providing said improvements,
sufficient to cover the total cost and expense of the work. The cost and expense to be assessed as
herein provided shall include the contract price of the improvements, engineering, legal fees and
clerical services, advertising, cost of inspection, cost of collecting assessments, and interest upon
warrants, if issued.
Section 6: The City Engineer is hereby directed to make an assessment roll according to the
provisions of Idaho Code, Section 504712.
Section 7: Notice of advertisement for bids for construction of said improvements shall be
published in two consecutive weekly issues of the Idaho Press Tribune, the official newspaper of
said City, which notice shall state the time, place and hour where and until when the City Engineer
will receive sealed proposals which will be opened and publicly read, shall contain a general
description of the kind and amount of work to be done, the materials to be furnished, as nearly
accurate as practicable, using such general terms as to admit of the wide latitude for competition,
and shall state that the plans and specifications for said improvement work are on file in the office
of the City Engineer where they be examined or obtained. The notice shall also state that the
bidder shall accompany his bid with a certified check or bid bond in compliance with Idaho Code
Section 50-341 in the amount of five percent (5%) of his bid and in the case the contract for such
work is awarded to such bidder, and shall be forfeited to the City and shall be placed in the local
improvement fund for such district, said notice shall provide that the City reserves the right to
reject all bids, to waive informalities, or to accept the proposal of the lowest responsible bidder,
and that no bidder may withdraw his bid after the time set for opening of bids.
Section 8: Should the court having jurisdiction declare any part of this Ordinance invalid,
unauthorized or unconstitutional or in conflict with any other part of this Ordinance, then such
decision shall affect only the part declared to be unconstitutional, unauthorized or invalid, and
shall not affect any other part whatsoever of this Ordinance, and each part hereof, irrespective of
parts declared invalid, unauthorized or unconstitutional.
PASSED SY THE COUNCIL of the City of Caldwell, Idaho, this 6th day of May, 2019.
PASSED BY THE MAYOR of the City of Caldwell, Idaho this 6t11
ATTEST:
Debbie Geyer, City
day of May, 2019.
ii��•1 DI
j 1
Gar7•et Nancolas, Mayor
�.•`' CIT y '''•,,
••••]N O%
o�y
UOA
y 0
• • .
N
: t�
00 21�
Y IDAHO
K12 Pei N me 101 F 11 10111A, 1 5 1
Notice is hereby given that the City Council of Caldwell, Idaho, declares their intention to create
Local Improvement District 19-1, for construction of concrete curb, gutter, driveway approaches
and sidewalks. Said project has an estimated cost of $87,400.00 with an estimated $65,500.00 to
be assessed to the property owners within the Local Improvement District. The remaining
$21,850.00 shall be borne by the City to provide improvements within intersections, alley
entrances and 25% of each property's final assessment. A public hearing will be held on May 6,
2019 at 7:00 p.m. in the Caldwell Police Department Meeting Room, located at 110 S. 5th
Avenue, Caldwell, Idaho. All interested persons are invited to attend said public hearing or
submit written comments to the City Clerk prior to 4:00 pm on the day of the hearing.
Dated this 10th day of April, 2019
By: Angela Lively, City of Caldwell Engineering Dept.
Publish April 17, 18, and 19, 2019
Mo Calldwe R City Council
ncil
Mfeettnrng Date: May 6, 2019
AGENDA ITEM INFORMATION
SUBJECT:
Department Submittals
X to
mark
Initials
Pass an Ordinance for the formation of L.I.D. 19-1 for the
construction and replacement of concrete curbs, gutters,
Building De artment
CDBG
Clerk
sidewalks, pedestrian ramps, and driveway approaches in the
City Attorney
City of Caldwell.
Finance Department
Human Resources
Planning & Zoning
Fire Department
Police Department
Public Works
Street Department
Water Department
WWTP
Engineering TSF
X
AL
Mapping
COSTIMPACT.•
Project/Construction Estimated: $87,400.00
Parks and Recreation
City's 25% Contribution: $21,850.00
FUNDING
Airport
SOURCE.
Information Systems
TIMELINE:
Construction will be between June 1, 2019
and October 31, 2019.
Golf Course
OTHER:
SUMMARYSTATEMENT:
At the Public Hearing the City Council must take written and
verbal testimony both for and against the
formation of the proposed Local Improvement District (L.LD.),
which will allow property owners to install
and replace miscellaneous concrete work on public right-of-way.
After hearing the testimony the Council must determine if it is
in the best interest of the City to ratify the
Resolution of Intention, and if so, to pass the Ordinance or Bill
creating the L.I.D. As this is a voluntary
program there may be no protests against its formation. The Ordinance gives authorization for the L.I.D.
project to go to bid.
RECOMMENDED ACTION:
The Engineering Department recommends ratifying the Resolution of Intention and pass the Bill creating
L.I.D. 194 under a suspension of the rules on the first reading. This will allow the City to go to bid for the
concrete replacement project.