HomeMy WebLinkAbout03 Public Agency I PUBLIC AGENCY 11
ITEM DATE SUBMITTED BY
"VA — i �-Z9--Jq i2JAMNG�vndkie)/
Memorandum
To: Jarom Wagner, Senior Planner
From: Robb MacDonald, City Engineer
Re: Case No. ZON-15-04(Randy McElveen)
Date: June 22, 2015
The Engineering Department provides the following comments concerning a request by Randy
McElveen to rezone 0.86 acres, more or less, from C-1 (Neighborhood Commercial) to R-1 (Low
Density Residential. The subject property is located at 5107 S.10th Avenue in Caldwell, Idaho.
Rights-of-Way
1. The portion of South 10th Avenue fronting the subject property is classified as a Minor Arterial
road way. An existing forty(40)foot one half width right-of-way is in place. Additional right-of-
way will not be required at this time.
Street
1. Future development may require street frontage improvements or a deferral agreement to be
executed.
Sewer&Water
1. Sewer is currently not available to the subject property.
2. Water is available from a 12" line in S 10th Ave.
Storm Drain
1. Future development may require provisions to be made for the disposal of stormwater drainage
in accordance with the City Stormwater Management Manual and any updates adopted
subsequent to the application.
Irrigation
1. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation
District sources. City municipal water may be used only if the criteria specified in the
Landscape Ordinance Section 10-07-12 are met.
General
Page 1 of 2
1. Prior to commencement of construction in any dedicated right-of-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified. This preferably will take place in a pre-construction
conference scheduled by the engineer of record in which all appropriate personnel and
utilities Appropriate City personnel are to be notified in advance of all required inspections.
2. Appropriately licensed public works contractors shall perform all construction within public
right-of-way.
3. All traffic control for the project shall meet the requirements of the Manual on Uniform Traffic
Control Devices (M.U.T.C.D.) and the City Engineer. The contractor shall provide a traffic
control plan to the City Engineer for review and secure an appropriate right-of-way permit
prior to any construction within the right-of-way.
Page 2of2