Loading...
HomeMy WebLinkAbout03 Public Agency I PUBLIC AGENCY 11 ITEM DATE SUBMITTED BY "VA — i �-Z9--Jq i2JAMNG�vndkie)/ Memorandum To: Jarom Wagner, Senior Planner From: Robb MacDonald, City Engineer Re: Case No. ZON-15-04(Randy McElveen) Date: June 22, 2015 The Engineering Department provides the following comments concerning a request by Randy McElveen to rezone 0.86 acres, more or less, from C-1 (Neighborhood Commercial) to R-1 (Low Density Residential. The subject property is located at 5107 S.10th Avenue in Caldwell, Idaho. Rights-of-Way 1. The portion of South 10th Avenue fronting the subject property is classified as a Minor Arterial road way. An existing forty(40)foot one half width right-of-way is in place. Additional right-of- way will not be required at this time. Street 1. Future development may require street frontage improvements or a deferral agreement to be executed. Sewer&Water 1. Sewer is currently not available to the subject property. 2. Water is available from a 12" line in S 10th Ave. Storm Drain 1. Future development may require provisions to be made for the disposal of stormwater drainage in accordance with the City Stormwater Management Manual and any updates adopted subsequent to the application. Irrigation 1. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation District sources. City municipal water may be used only if the criteria specified in the Landscape Ordinance Section 10-07-12 are met. General Page 1 of 2 1. Prior to commencement of construction in any dedicated right-of-way, or construction of any improvement intended for dedication to the City or connected to a City facility, the City Engineering staff is to be notified. This preferably will take place in a pre-construction conference scheduled by the engineer of record in which all appropriate personnel and utilities Appropriate City personnel are to be notified in advance of all required inspections. 2. Appropriately licensed public works contractors shall perform all construction within public right-of-way. 3. All traffic control for the project shall meet the requirements of the Manual on Uniform Traffic Control Devices (M.U.T.C.D.) and the City Engineer. The contractor shall provide a traffic control plan to the City Engineer for review and secure an appropriate right-of-way permit prior to any construction within the right-of-way. Page 2of2