Loading...
HomeMy WebLinkAboutURA RES 2017-19 I RESOLUTION NO. 17- OF THE CALDWELL URBAN RENEWAL AGENCY A RESOLUTION ORDER #6 (NORTHWEST AUTHORIZING THE EXECUTION OF CHANGE IN THE AMOUNT INTERIORS9 LLQ PROVIDED Y BENITON CONSTRUCTION OF $49881,00 AS APPROVED BY THE BOARD O TRUSTEES CONCERNING TEL CALDWELL SCHOOL DISTRICT PR JECTO Y RESOLVED by the Caldwell Urban Renew n l Agency authoriz n the L IT HL ll Scheel Board o Trustees concerning + •der#� as approved h the Caldwell execution `Change set Barth in full the Caldwell School District Project made apart hereof as ELL this �. w1�' day �"April, PASS. BY THE ALDW URBAN RENEWAL AGENCY � 2017.. "�"� :� MAYOR f the City of Caldwell, Idaho this 1 t"day of April, 2017. APPROVED APPROVED: w� HAIR MAN AN , ATTEST: F c M. rn �► X01 0 0 SECRETARY C4 "Ir 0 > rm m i Subcontract Change Order CON 81rFt U CT 1 Caldwell High School Improvements 3401 S,Indiana Ave.,Caldwell,ID 83605 Tel: Fax, Date- To Contractors. Contract t Date: 5/16/2016 o wept I rderiom,LLC Contract Number: 21607-09260 601 E.Karcher Road Change Order M 0016 ID 83687' The contract is vi the following Items: 1 Condensatlon on Roofing Screm,in Wrestling PCO 1 caption Amount '11 Northwest Interiors, -Remove and repair acoustical ceiling in Rm. 103, 103A,and'104 as $4l881.00 necessary od to insulators,Remove existing rigid insulation on wall above c6ling. f' last "spray foam full length of wall to seal wrestling room from halfway eight room. The original Contract Value was $84,655.00 Sum of changes by prior Prime Contract Change Orders, $13,788.00 The Contract Value prior to this Pdme Contract Change Ord was $981443.00 The Contract Value wil�I be changed by this Prime Contract Change Order In the aunt of 0881. The a Contract Value including this Prime Contract Change Order 'll e $103o324.00 I The Contract duration will be change by 0 days 1 The revised Completion dale s of this Pdme Contract Chun Order is Design: t Architects Northwest Inted'ors,LLC Urban Renewal Agency of City of Caldwell ARCHITECT CONTRACTOR OWNER 216 S.W.5th Ave. 1 E.Karcher Road P.O.Box 1,179 Meridian,ID 83642 NaM,ID 83687 Cal�well, ID 83606 Addr s d Ad ess r . #m wn t w r Signature Signature igunature Date: " Date,. yJ G-1 'Z 0 ,,,,µ School,District No. 13 ,Canyon C22,nty,,State of Idaho 311 PARTY BENEFICIARY 5,02 Fillmore Street Caldwell,1 83605 Address Signature u Date- Nortnwest TV Interiors RCE-16341 601 E Karcher Rd Nam pap Idaho 83687 ® P(208)442-8840 F 20 442-8841 F y.. i Request.. Option I Remove and repair acoustical ceiling in rm 103,103A,and 104 as necessary to accommodate insulators 6"spray foam down full length of wall seal wrestling room from hallway/weight room. Remove 6"of stickpin semi-rigid insulation in order to seal top on wall to deck Matezzal $586 Labor $858 Sub $2,800 Sub Total $4,244 P&t7 15% $637 Total General Exclusions:Temporary facilities&utilities,removal of debris from project site. Contractor to provide for"Pro'ect Conditions"&sufficient scheduling for each item guoted. Limitations:This quotation is for portions of the work limited to the material and work described herein,all in compliance with construction documents.This quotation may or may not include all of the items or work scheduled or described in a particular section or specifications.If you use this quotation,we will require a fair and equitable contract that does not subject us to undue risk and preserves the rights and remedies available to us under the law.This quotation may be withdrawn if not accepted in writing within 30 days. Northwest Interiors LI.C. 601 E Karcher Rd, Nampa, ID 33637 Phone: 203-442-3340 Fax:208-442-8841 Caldwell Job Cost Summary High School WORKING Insuiation Sid No.95 Selected Sections: 02072 Cut in Expansion, 07210 Insulation, 09511 Ceiling Grid Selected Typical Areas: Selected Areas: (unassigned) UPTIUN 2 09511 Ceiling Grid r. ate.ial__Cost Cade Description uan n Cosh Amount ._ . _ GRID/4TEE 4'Cross Tee 101,90 LF 0.49 49.69 GRID/MAIN RUNNEL 12'Main Runner 45.40 LF 0.52 23.53 LAY IN (REVEAL) Lay In Tegular 457.79 SF 0.72 329.93 LAY IN (TRIM) Flat Lay-In Tile 243.59 SF 0.08 133.03 09511 Ceiling Grid Totals 586.32 Material Totals 586.32 02072 Cut in Expansion Labor Cost Code Description Quantity Unit Cost Amount DEMO/GRID Demo Grid 666.30 SF 0.50 536.24 LABORER Laborer 0.00 STOCKER Stacker 0.00 SUPERINTENDENT Superintendent 54.60 02072 Cut in Expansion Totals 590.84 09511 Ceiling Grid Labor Cost Code Description Quantity Unit Cast Amount ACCOUSTICAL Accoustical Ceiling/Tile 203.59 SF 0.30 75.75 CEILING LABORER Laborer 0.00 LAY IN REVEAL Lay In Tegular 457.79 SF 0.36 166.26 STOCKER Stocker 0.00 SUPERINTENDENT Superintendent 24.96 09511 Ceiling Grid Totals 266.97 Labor Totals 857.81 0214012017 12:00 pm Page I Job Cost Summary Caldwell High School WORKING Insulation Bid No. 95 07210 Insulatio-n Sub. Costod _Description Aun ... INSULATION Insulation 2,890.00 07210 Insulation Totals 21800.00 Subs Totals 21800.00 F Grand Total 41244.13 0210812917 12:00 pm Page 2 i j 111C ON i T U CT I ON Change Order Remest 5t I I Detailed(with Breakdown of COs),Grouped by c Number Caldwell High School Improvements Project# 2 3401 S Indiana Ave,Caldwell,ID 83605 Tel,. F To: Jinn Mal in From: Hiatt Forrester i esIgn We st,Arch it cts Be!niton Construction Company 216 S.W' T 51h Ave P ox 838 Meridian,ID 8364,2 Meridian,I ► 83680 i „ �,✓..,, ,.0 .... / FC#11 Condensation on Roofing Screws In Wrestling Room Out for approval ..... m� .,�,.,. f / .r /,,ter . I FC#11 311/2417" 0 7,784-00 t I h�r AN,, / u<r f, �r'�/JL Mm.. . omy.d ...,.. RAW!� „ �„ eason ,./��f 1N/' wvl c<�s , mPn�: mmmnmmnmmunwrvy ,r, .v olurvro,mM yn ., .,,.. .,x.../r ,.%.// ,r,/„lri% „,..Y �,✓IVY"lry iJ/rJ r�x iii � ✓;,. ,:',,, "r, „ �" r...ii::.. /f�'l t'4, „/, IYYI' ,r P 1 (✓,,., ......ruunA4,..w..rw!'laww r w>LL'ii,//,,. ., ,i, rain r.,,,,,r. ri✓, „„ ..,r„ ,,, FC-011 2J22J2017 717841.00 0 FC#11 Condensation on Rooting Screws,In Wrestling Room 1 Item No It m Description Amt Prop Reference 001 Northwest Interiors Remove and repair acoustical 4,881,00 ceiling In Rm 103,103A,and 104 as necessary to accommodate insulators,Remove existing rigid j Insulation on mull above ceiling. Install 6"spray foam full length of wall to seal wrestling room from hallway welght room 002 Service Experts- -duct existing exhaust fan; 1,918.00 includes ductwort modifications,servi and recomiss,lon of(2)exhaust fans,and Install )return dm& 003 Power plus-Install poorer to 2)exhaust fans in 918500 wrestling room. Includes manual switching @ waulL i Approved ZVI Signature Name Prolog onager Printed nn: 212312017 Active Projects Page 1 i