HomeMy WebLinkAboutURA RES 2017-02 RESOL'UTIONIN", 0, 2 (N.
APPROVE R.ESOLUTION' AUTHORIZI"NG, IHE APPROVAL OF CHANGE ORDERS
JA rFEI)
S WITH, THE "L 141GIJ S(-,".1400L IMPROV.f"MENTS
ASO('�, I �d � CALDWEI.-j
PROJECT RF-dET:jE,4NCED, AS PR #26 (CAN PROJ'ECTOR POWER) WIT11 POWER
PI-jUS IN THEAMOUNT OFS735.00.
jr
'BE" r HERERY RESO1.jVED by the ("."aldwell, [Jrban, Renewal Agericy authoinizing the
execution of the Proposal Request, Change Orde'rS as recol-nmended by the Caldwell School
Board of'frustees concerning the Caldwell School Distn,ct PrQj*ect made a- par-t her,eof as set forth
i'n 4"U11.
PASSED BY THE C,ALDWE1.,4L URBANRENEWAI.4 AGENCY this, 6"' day of January,
2017.
APPROVED BY"ME CH'AIRMAN OF THE URBAN' RENEMAL AGENCY OF TI-IEJ
CITY OF ("'ALDWELL, IDA110 T 1-11'S OFJANt][ARY, 2011,76
APP'11"ZOVED:
0%
s�&CITY op
IC4,
uj 0
U, 40 ISO,)
10
0 %
O
,0
o
v qV\
RESOLLYTION NO, page 1
11 i-to n
coNszeaucTloN Change Order Request
Detailed(with Breakdown of PCOs),Grouped by Each
Number
Caldwell Nigh School Improvements Project# 21607
3401 S.Indiana Ave.,Caldwell,ID 83605 Tel: Fax:
Change Order Request: 042 Date: 12/1512016
To: Jim Main From: Matt Forrester
Design West Architects Beniton Construction Company
216 S.W.5th Ave. P 0 Box 838
Meridian,ID 83642 Meridian,ID 83680
PR#26 CNA Projector Power Out for Approval
Re ui ei 3. Da -_ Re
PR#26 12/22/2016 0 735.00
ENote;� .
". �o aaao
• D j..r: Ce) - - - Ar11t?Pop!DaysRegs,a. l .
Mrdratirli Notes;
PR-026 12/14/2016 735 00 0
PR#26 CNA Projector Power
Item No Item Description Amt Prop Reference
001 Power Plus-Add ceiling receptacle in Room 1007 for 735.00
NV Projector, per PR#26.
Approved By: _
Signature 1Z, ICI.2
Name -, AA 1h/ _ —
Date
Prolog Manager Printed on: 12/15(2016 Active_Projects Page 1
� -� Subcontract Change Order
G011s1-FRICTION
Caldwell —._.._
High School trripriovemtnbt Project#2150?
3401 S.Indiana Ave Caldwell:IC) 83605 Ter Fay.
Date:
To Contractor: Contract Date- 5/162016
Power Plus, !nc Contract Mumbar. 21607.16000
25 N.Harman Streit Change Order k: 014
Boise,ID 83704
The contract Is hereby revised by the following items!
PR*26 CNA Projector Power
PCO Description Amount
PR-026 Power Plus•Add ceriing receptacle in Room 1007 for AN Projector,per PR=i26 S735.00
The orjginaai Contract Value was $225.690.03
Sum of changes by prior Prime Contract Change Orders $251,611.00
The Contract Value prior to this Prime Contract Change Order was
The Contract Value will be changed by this Prime Contract Change Order in the amount or $735.00
The new Contract Value including this Prime Contract Change Order will be $478.136.00
The Contract duration wilt be change by 0 days
The revised Subetant;al Camplelinn state as of this Prime Coatraci Chance Order is
Design West Architect? Power Firs, ix Urban Renewal Agency of City of
Caldwell
ARCHITECT CONTRACTOR._:... OWNER
216 S W.5th Ave 26 N Hartman Street P O.Box 117P.
Meridian.ID 83642 Boise.ID 53704 Caldwell.ID 83606
Address .._..
Add} `yr', _, , Address
.g}�.Jar RAain.�, _... B`'• iire(�J'1/,/`
Signature i i; . _ S =tune Siona e.. -- --
Date ;ate_1//f//2...
Scnoo;Distrat No. 132, Caiyor-,
Cas ,State of Idaho
_ PARTY BENEfiC1ARY --
1502 Fillmore Street
Catdwett.ID e3 05
Address -
B . Jodie Miyy
Signature •
...,,_; - -'• i•�
pate- 12/20/16
POWER
PLUSINC. Boise, Idaho 83704
(208) 323-1506
Fax: 323-1790
.a. A N.-T
+. .. ,s yot (W
'T. .PI-IJ-15 SE'."'RVICE"
CHANGE ORDER SUMMARY
Job Name Caldwell HS.Upgrades ,fob Number
Contractor---- �eniton const.
Estimator Mark
Notes
Date 1 211 512016
Summary Description aPR#26 - add ceiling receptacle in Room 1007 for A1V projectdr.
E 55.00
abor Un its 3
Labor Units 0.' 66
ate $ 55.00
r Quotes Total $ -
Supplier Quotes $ - Supplier Total
Materials Total $ 65.00 $
Sub Total $ 55.00
Taxes $ 3.90
Permits and Fees $ 12.1 2
Sub Contractors $ -
Equipment Rentals $ - Supplier Quotes Total $ -
Labor Cost $ 537.08
Sub Total $ 6°18.09 sub contractor Total
WE & MM $ 17.89 $ -
Sub Total $ 635.99
Overhead 10% $ 63.00
Sub Total $ 699.69
Profit 5% $ 34.98
Total $ 723 4L.6 7 Tota I $ -
change Order Total $ 736.00 onnomaiminonlo
Job Name: Caldwell HS Upgrades
Items+ByProducts
Item# Item Name Quantity Price Ext Price Labor LaMar Tot Cost Cade
Category:Cost Code= Branch Rough
755 112 EMT 70.00 $33.80 C $23.66 6.00 C 4.20 cb
837 112 EDIT CONN S1S 3.50 $18.90 C $.66 8.00 C .28 cb
909 112 EMT COUP SIS 7,00 $22.95 C $1.61 5.00 C 42 cb
1,053 112 EMT 1 HOLE STP 7,00 $8,10 C $.57 4.80 G .34 cb
12,833 41S BOX 2-118"DEEP 2.00 $143.00 C $2.86 24.00 C A cb
12,837 41S SG MUD RINGS 314 1.40 $60.75 C $.61 5.00 C .06 cb
12,841 41S BLAND COMER too $36,40 C $36 6,00 C .06 cb
Totals for Cost Code
$30.33 5.84
Category;Cost Code Hangers/Anchors
2,462 BOX-HANG 16"TSG816 2.00 $218.40 C $4.37 12.00 C 24 ch
Totals for Cost Code
--- _v--. $4.37 --- - .24
Category:Cost Code= Trim Devices/Plates
88 BRO LABEL 1,00 $.46 E $.46 .46 E .06 dt
12,575 1G SS DUPL RECP PLATE 1.00 $182.25 C $1.82 12.00 C 12 dt
12,659 DPLX 2013 1.00 $387.40 C $3.87 25.00 C 25 dt
Totals for Cost Code
$8.15 .43
Category;Cost Cade= LugsfTer n ination/Ground
3,719 20A WIRE TERMINATION 3.00 $.00 X $.00 10 E .29 sI
Totals for Cost Code
S.00 29
Category:Cast Code= Branch Wire
65 12 THHN CU STRANDED 220.50 $109.20 M $24.08 6.25 M 1.38 wb
Totals for Cost Cade
.. $24.03 1.38
Totals:
$64.92 8.17
Report Totals:
Items+ByProducts
Ext Price Labor Tat
$84.92 8.17
12/1 512415 9:34:19 AM McCormick Systems Inc. Page: 2 of 2
PROPOSAL REQUEST
��- - M -
PROJECT NO.: 1546 DATE: December 14,2016 PR NO.: 26
PROJECT: Caldwell High School Urban Development Upgrades
CONTRACTOR: ARCHITECT: OWNER:
Beniton Construction Design West Architects Caldwell School District dame
355 SW Sty Ave,Suite [a4 216 SW 5"Ave 1502 Fillmore St.
Meridian,1D 83642 Meridian,Idaho 83642 Caldwell, 1D 83605
TEl1.(208)884-0027 208-588-1768 TEL.(208)455-3300
FAX(208)8844626 Fax 208-955-6885 FAX(208)455-3302
INITIATED BY: ❑Contractor 1 Subcontractor ®Architect/Consultant ❑Owner
Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the Contract Documents described heroin.
Submit proposal within seven(7)days..or notify the Architect in writing of the date on which you anticipate submitting your propml.
THIS IS NOT A CHANGE ORDER,A CONSTRUCTION CHANCE DIRECTIVE OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED
IN THE PROPOSED MODIFICATIONS.
At ter an evaluation ol'the proposal has been made by the Architect,this Proposal Rcyucst NA11111 be submitted to the Owner for review and approval. Upon receipt ol-
uritten approval by the Architect and the 0\kmer,the Contractor is authorised to prweed,and the items identified tiVill be incorporated into the next Chimge Order and
incorporated into the Contract,
26.01 Sheet E2.50—Power Plan Area 1: Provide all labor and materials to install a new ceiling mounted receptacle
adjacent to the ceiling mounted AEV projector outlets in Classroom 1007. See attachment.
CONTRACTOR'S PROPOSAL: ARCHITECT&OWNER ACTION:
PR No. Accepted Dejected Other
26.01 Total gAdd or ❑Deduct dollars Tine: days ❑ ❑ ❑
'111FS'4"ViR,(4
C..on tractor's A u thori zed I epresentati v c Aat e
❑ Other:
ARCHITECT'S AUTHORIZATION: OWNER'S AUTHORIZATION:
Arehitcet.s Representative Date Ownees Representative Date
End of Doc err ew
Desists West Architects Page I of
�h
t i i i
, f
II I
3
i
I r
. l
i
I
i
ROOM
} r �y l
UASSROOM +
r
L12-27
' (E)r
�r
� I
} i s EII
r
(E)
j
�-y
PROJECT NAME DRAWN: ARCM.PROJECT#: SHEET NUMSER
Mi.SGR OVE JD
,. ��rGINTERING,PA. Lill 15
ELL HIGH SCHOOL
URBAN DEVELOPMENT CHECKED.
KEL
%9 Kml
UPGRADES
SCALE: REF.SHEET: PR-26
3rcuc t�s rtt7t+cr I h•:'I a
118"=1 F_o!r E2,5