2016-05-05 Caldwell Airport Minutes MINUTES Caldwell Industrial Airport Commission 4814 E. Linden Street Caldwell, ID 83605 Email: kschara@cityofcaldwell.org 208-459-9779 Date: May 5th, 2016 Time: 12:00 Noon — 1 :00 PM Location: Caldwell Industrial Airport — Hubler Terminal Conference Room Commission Members Present: Barry Everett, Jr., Phil Fouts, Rob Herndon, Steve Kahn, Marty Koch, Al Rice, Greg Swanson, Rob Oates — Airport Manager, Kathy Schara—Airport Administrative Secretary Commission Members Absent: Guests: Brent Orton — Public Works Director, Toby Epler & Steve Marshall — JUB Chairman Phil Fouts called the meeting to order at 12:02 pm. 1 . Minutes of April 2016 Airport Commission Meeting Motion was made and seconded to accept the April 2016 Minutes. Motion passed. 2. Airport Improvement Program — Toby Epler Toby Epler reported that the electrical work on the taxiway lighting and sign project for AIP28 is once again under way, the contractor picking up where they left off last fall. On June 13th, the work will start on the first phase of the hot ramp/apron rehab, also part of AIP28. This will be on the west third of the ramp, with this phase ending the Wednesday before July 4th. The ramp will be open through the holiday weekend, and with the next phase will begin shortly after the 4t . The fuel island will be available throughout all phases of the project. Toby said they look to complete the entire project around the first week of August. Al Rice stated that it is likely Silverhawk will use the ramp at Hubler during the Apron rehab project. Toby reported they are also working on getting the AIP29 - Runway Rehab design started, with surveyors and core sampling. This project will most likely involve milling off the existing asphalt and re-paving the runway. The approximate shut down of the runway will most likely be between 3 to 5 weeks, depending on what is found with the sampling. This project is slated for construction in 2018, but the airport will be able to accept funds early, if they become available in 2017. The millings will be recycled for the shoulders and around the PAPI lights. Barry Everett asked when Taxiway C will be completed all the way through. Toby explained that this is not possible, due to the location of existing hangars. A question was asked as to possibly building a vehicular road, to possibly reduce incursions. Rob will look into it and report next meeting. 05„,,May..16 CIA Minutes - final 5191261 • 3.` Canal Relocation Update — Brent Orton Brent reported that the building being done across Linden from Hubler Terminal will increase the need for "Hypotenuse Way" to be built, which will require the canal to be moved. Brent reported that a deal has not yet been reached for an easement for the Priddy land, but this is progressing. Other land negotiations are also needed. In response to questions from members, Brent stated that although the canal will be underground, farming will not be viable over the top, due to the elevation required. 4. Wall of Fame Committee Report Barry reported that the trophy case for the Hubler display is almost ready for delivery to Mike Reed's hangar. He also reported that they received 2 or 3 names from the previous request in the Airport News. Another request will go out in a future newsletter. 5. Buildable Lots Update — Rob Oates Rob reported that Calvin Tabor's fourth hangar of the 4-plex he built is in process of being sold. The other hangar Calvin is working on is going forward. 6. Announcements — Rob Oates • 1st edition of Airport News in the new email format went out this morning. Feedback is appreciated. • During the upcoming apron asphalt project, the aircraft in the first two rows of the tie-down area will need to be moved. If you know of anyone whose aircraft is parked there, please let them know. • There have been on-going issues with Gate #5. Repairs have been made, and Mike Reed is investigating the issues. Resetting the gate when it is stuck closed or open usually corrects the issue. • The AWOS is now in operation and on the air, however there are still some issues with extra tones and inaccurate wind readings. These issues have again been called into the FAA. The meeting was adjourned at 12:54 pm. Next Airport Commission Meeting: June 2nd, 2016 - Noon 5 May__?6 CIA Minutes - final