Loading...
HomeMy WebLinkAbout03 Public Agency (2) PUBLIC AGENCY ITEM DATE SUBMITTED BY 41,7_ Oritrup 1--7 .--c6 6in-ciel-% Letup O�cp .DWF4, CALDWELL FIRE DEPARTMENT 1 { .��e. rk 0 CITY OF CALDWELL qIfs '• 310 South 7th Avenue VI!PI CALDWELL,IDAHO 83605 Protecting Your Property Saving Lives r�-'1. (208)455-3032 -7Ore To(0e DATE: November 2, 2000 TO: Ms. Linda James, Community Development Director FROM: Douglas Brown, Fire Marshal j . SUBJECT: Comments for Caldwell Planning & Zoning Commission November 14 meeting The Caldwell Fire Department (CFD) offers the following comments regarding these cases to come before the Caldwell Palnning&Zoning Commission meeting for November 14, 2000: Case No. SUP-107-00 Storage Yard for Concrete Cutting Equip. Location: 1015 N. 5th Avenue Applicant: ACDS, Inc. The CFD would request that the Applicant provide a visible address for these premises and have a 2A:10BC rated fire extinguisher in the office area. Case No. SUP-108-00 Cellular Telephone Antenna Site Location: N. 9th at Albany Applicant: UbiquiTel Leasing Company The CFD requires that this structure be provided with an address (if one is not already assigned). Case No. SUP-109-00 Conversion of SFR to office building Location: 614 Fillmore Ave. Applicant: Frances H. Walker The CFD requires that the Applicant provide a 2A:10BC rated fire extinguisher in the office area. Case No. SUP-110-00 Addition of 9th bed to Assisted Living Facility Location: 1510 Blaine Street Applicant: Sandra Eggebratten The CFD will require an inspection of this facility before granting approval. Memorandum To: Linda James From: Gordon Law, City Engineer Re: Case No. SUP-109-00 Date: November 7, 2000 The Engineering Department has the following comments concerning the conversion of an existing single family dwelling commonly known as 614 Fillmore Avenue, into a professional office. 1. If there is to be any increase in impervious area, provisions are to be made for disposal of stormwater drainage in accordance with the City's Stormwater Policy. A copy of this policy is available upon request. The engineer of record is to provide calculations which demonstrate that assumptions in the site storm drainage plan comply with the Stormwater Policy. 7