HomeMy WebLinkAbout03 Public Agency I PUBLIC AGENCY
ITEM DATE SUBMITTED BY
11(teiViM (( • ,!7D Vel/t Z+415/(Y)
Z
4 GpI,DWFt ..i
ti
.�� CALDWELL FIRE DEPARTMENT
� � ° CITY OF CALDWELL
310 South 7th Avenue
F_
CALDWELL,IDAHO 83605 Protecting Your Property Saving Lives
o
�► 4, (208)455-3032
-tore To oV
DATE: November 2, 2000
TO: Ms. Linda James, Community Development Director
FROM: Douglas Brown, Fire Marshal 0.
SUBJECT: Comments for Caldwell Planning & Zoning Commission
November 14 meeting
The Caldwell Fire Department (CFD) offers the following comments regarding these cases to come
before the Caldwell Palnning&Zoning Commission meeting for November 14, 2000:
Case No. SUP-107-00 Storage Yard for Concrete Cutting Equip.
Location: 1015 N. 5th Avenue
Applicant: ACDS, Inc.
The CFD would request that the Applicant provide a visible address for these premises and have a
2A:10BC rated fire extinguisher in the office area.
Case No. SUP-108-00 Cellular Telephone Antenna Site
Location: N. 9th at Albany
Applicant: UbiquiTel Leasing Company
The CFD requires that this structure be provided with an address (if one is not already assigned).
Case No. SUP-109-00 Conversion of SFR to office building
Location: 614 Fillmore Ave.
Applicant: Frances H. Walker
The CFD requires that the Applicant provide a 2A:10BC rated fire extinguisher in the office area.
Case No. SUP-110-00 Addition of 9th bed to Assisted Living Facility
Location: 1510 Blaine Street
Applicant: Sandra Eggebratten
The CFD will require an inspection of this facility before granting approval.
Q
, c
Memorandum
To: Linda James
From: Gordon Law,City Enginee �' %_...
•� r
Re: SUP-107-00
Equipment Storage yard @ 5th and Ithica
Date: November 9,2000
The Engineering Department provides the following comments on the referenced special use permit:
1. The proposed equipment storage yard is currently a fenced in grassy area. Site drainage must comply with
the City of Caldwell Storm Water Management Policy.
2. City water and sewer are available and the site currently utilizes these services. Depending upon use,any
additional sewer and water fees will be reviewed during the building permit process.
3. Any additional site improvements will be reviewed during the building permit process.
Page 1 of 1
(-\)1