Loading...
HomeMy WebLinkAbout03 Public Agency I PUBLIC AGENCY ITEM DATE SUBMITTED BY 11(teiViM (( • ,!7D Vel/t Z+415/(Y) Z 4 GpI,DWFt ..i ti .�� CALDWELL FIRE DEPARTMENT � � ° CITY OF CALDWELL 310 South 7th Avenue F_ CALDWELL,IDAHO 83605 Protecting Your Property Saving Lives o �► 4, (208)455-3032 -tore To oV DATE: November 2, 2000 TO: Ms. Linda James, Community Development Director FROM: Douglas Brown, Fire Marshal 0. SUBJECT: Comments for Caldwell Planning & Zoning Commission November 14 meeting The Caldwell Fire Department (CFD) offers the following comments regarding these cases to come before the Caldwell Palnning&Zoning Commission meeting for November 14, 2000: Case No. SUP-107-00 Storage Yard for Concrete Cutting Equip. Location: 1015 N. 5th Avenue Applicant: ACDS, Inc. The CFD would request that the Applicant provide a visible address for these premises and have a 2A:10BC rated fire extinguisher in the office area. Case No. SUP-108-00 Cellular Telephone Antenna Site Location: N. 9th at Albany Applicant: UbiquiTel Leasing Company The CFD requires that this structure be provided with an address (if one is not already assigned). Case No. SUP-109-00 Conversion of SFR to office building Location: 614 Fillmore Ave. Applicant: Frances H. Walker The CFD requires that the Applicant provide a 2A:10BC rated fire extinguisher in the office area. Case No. SUP-110-00 Addition of 9th bed to Assisted Living Facility Location: 1510 Blaine Street Applicant: Sandra Eggebratten The CFD will require an inspection of this facility before granting approval. Q , c Memorandum To: Linda James From: Gordon Law,City Enginee �' %_... •� r Re: SUP-107-00 Equipment Storage yard @ 5th and Ithica Date: November 9,2000 The Engineering Department provides the following comments on the referenced special use permit: 1. The proposed equipment storage yard is currently a fenced in grassy area. Site drainage must comply with the City of Caldwell Storm Water Management Policy. 2. City water and sewer are available and the site currently utilizes these services. Depending upon use,any additional sewer and water fees will be reviewed during the building permit process. 3. Any additional site improvements will be reviewed during the building permit process. Page 1 of 1 (-\)1