Loading...
HomeMy WebLinkAbout03 Public Agency (2) PUBLIC AGENCY ITEM DATE SUBMITTED BY PA ( NaitO (-1/ Z. Oltato 1 l Ynz D - (1107111) La_-&(.3 1 01/11x'2002 01:11 FAX 4684481 PIONEER IRRIG 42201101 h.) ( Pioneer Irrigation District LONNIE 4. FREEMAN P. D. BOX 426 CALDWELL IDAHO a3eee 44borintardent 08) 459-3617 NAIDA E- IILLEHER Secretary/rteaauter January 11, 2002 Mr. Steve Hasson. Caldwell Community Development Director Fax: 455-3050 RE: Case Nos. SUP-152-01 and VAR-23-01 Request by Judy Bistline Dear Steve: Please be advised that the property being planned for development in the above Case No. borers the Lowline Canal. There is a recorded easement in place for said canal which must be kept clear and free from all obstruction at all times. Thank you for making certain this matter is addressed. Sincerely, Lonnie J. Freeman Superintendent LJF:ntk • ■ /.\ DATE: January 16, 2002 TO: Steve Hasson, Community Development Director FROM: Douglas Brown, Assistant Chief/Fire Marshal SUBJECT: Comments for Caldwell Hearing Examiner January 24, 2002 Meeting 5- Case No: SUP — 152 —01 and VAR—23- 01 Applicant: Judy Bistline Location: W. Oak Street The CFD has no specific conditions to place on this SUP or VAR. Fire code related conditions will be placed on this project during plan review for building permits. Rc./ Memorandum To: Steve Hasson From: Gordon Law, City Engineer ;'.- °.. Re: Case No. SUP-152-01 and VAR-23-01 Date: January 16, 2002 The Engineering Department provides the following comments concerning a special use permit request and variance for a planned unit development to construct two rental units on Oak Street West of Airport Avenue: 1. Provisions are to be made for the disposal of stormwater drainage in accordance with the City's Stormwater Management Policy. A copy of this policy is available upon request. The engineer of record is to provide calculations, which indicate that the assumptions in his storm drainage plan comply with the storm drainage policy. 2. The site has existing curb, gutter, and sidewalk, however, the sidewalk is overgrown with weeds. Once the sidewalk is cleaned off, this department will make an inspection to determine if any of the sidewalk needs to be replaced. 3. City water is available in Oak Street and City sewer is available at the back of the lot. Connection fees for City sewer and water services will be assessed at the time of building permit issuance. 4. Oak Street currently has 28 feet of right-of-way from centerline, which meets the street designation as defined in the 2005 Caldwell Urban Boundary and Functional Classification System map. No additional right-of-way is required. 9\