01/11x'2002 01:11 FAX 4684481 PIONEER IRRIG 42201101
h.) ( Pioneer Irrigation District
LONNIE 4. FREEMAN P. D. BOX 426 CALDWELL IDAHO a3eee
44borintardent 08) 459-3617
NAIDA E- IILLEHER
Secretary/rteaauter
January 11, 2002
Mr. Steve Hasson.
Caldwell Community Development Director
Fax: 455-3050
RE: Case Nos. SUP-152-01 and VAR-23-01
Request by Judy Bistline
Dear Steve:
Please be advised that the property being planned for development in the above Case No.
borers the Lowline Canal. There is a recorded easement in place for said canal which
must be kept clear and free from all obstruction at all times.
Thank you for making certain this matter is addressed.
Sincerely,
Lonnie J. Freeman
Superintendent
LJF:ntk
•
■ /.\
DATE: January 16, 2002
TO: Steve Hasson, Community Development Director
FROM: Douglas Brown, Assistant Chief/Fire Marshal
SUBJECT: Comments for Caldwell Hearing Examiner
January 24, 2002 Meeting
5-
Case No: SUP — 152 —01 and VAR—23- 01
Applicant: Judy Bistline
Location: W. Oak Street
The CFD has no specific conditions to place on this SUP or VAR. Fire code related conditions
will be placed on this project during plan review for building permits.
Rc./
Memorandum
To: Steve Hasson
From: Gordon Law, City Engineer ;'.- °..
Re: Case No. SUP-152-01 and VAR-23-01
Date: January 16, 2002
The Engineering Department provides the following comments concerning a special use permit
request and variance for a planned unit development to construct two rental units on Oak Street
West of Airport Avenue:
1. Provisions are to be made for the disposal of stormwater drainage in accordance with the
City's Stormwater Management Policy. A copy of this policy is available upon request. The
engineer of record is to provide calculations, which indicate that the assumptions in his storm
drainage plan comply with the storm drainage policy.
2. The site has existing curb, gutter, and sidewalk, however, the sidewalk is overgrown with
weeds. Once the sidewalk is cleaned off, this department will make an inspection to
determine if any of the sidewalk needs to be replaced.
3. City water is available in Oak Street and City sewer is available at the back of the lot.
Connection fees for City sewer and water services will be assessed at the time of building
permit issuance.
4. Oak Street currently has 28 feet of right-of-way from centerline, which meets the street
designation as defined in the 2005 Caldwell Urban Boundary and Functional Classification
System map. No additional right-of-way is required.
9\