Loading...
HomeMy WebLinkAbout03 Public Agency PUBLIC AGENCY 1 ITEM DATE SUBMITTED BY A- I NuALD y - Z2,-D2 off eVVOLON, tv-)p " ,, 1-[ - zs a6p:D.„.k. P -3 rrA,MO 5 , 2 -D7. OA 4_.vAccIAA ! pPR 22 2002 DATE: April 19, 2002 TO: Steve Hasson, Community Development Director FROM: Douglas Brown, Assistant Chief/Fire Marshal SUBJECT: Comments for Caldwell Planning & Zoning Commission May 2, 2002 Meeting The Caldwell Fire Department (CFD) offers the following comments regarding the following cases to come before the Caldwell Planning&Zoning Commission on May 2, 2002: Case No: SUP-160-02 Applicant: Idaho Commercial Construction Company Project: Aircraft hangar and offices Location: Caldwell Industrial Airport(Aviation Way) The CFD has no objection to this SUP request and will address specific fire code requirements during the building permit plan review process. Case No: SUP-161-02 Applicant: Mennonite Church Project: Change of Use—convention center to church Location: 701 N. Indiana Ave. The CFD has already completed a building permit"change of use"plan review on this application. Prior to submitting the plan review I was advised that the Applicant had pulled their building permit request. This facility is not able to meet the UFC standards for minimum required fire flow or fire hydrant distances in proximity to the structure. To mitigate the problem will require the installation of two (2) fire hydrants (one off-site and one on-site), or, a single fire hydrant in conjunction with a fire sprinkler system. I have attached the plan review to these comments for additional information. 1 Memorandum To: Steve Hasson n City g APR 2 5 2002 From: Gordon Law, Cit Engineer ( ! Ben Weymouth, Assistant City Engineer Re: Case No. SUP-160-02 Date: April 15, 2002 The Engineering Department provides the following comments concerning a special use permit request to construct an aircraft hanger and office building at the Caldwell Industrial Airport: 1. Aviation Way is designated as a Collector Street and as such has the potential for high traffic volumes. The two (2) ingress/egress approaches shown on the proposed site plan shall be changed to utilize the two (2) existing approaches adjacent to this development. 2. Any development which increases the amount of impervious area shall make provisions for the disposal of stormwater drainage in accordance with the City's Stormwater Management Policy. A copy of this policy is available upon request. The engineer of record shall provide calculations, which indicate that the assumptions in his storm drainage plan comply with the storm drainage policy. 3. This development proposes to construct parking over an existing drain ditch. Said ditch shall be structurally backfilled in accordance with the developer's engineering report. 4. City sewer and water are currently available to the proposed development. The capacity of the sewer and water systems, the City's ability to provide services, and connection fees for these services will be determined as part of the Building Permit process. 5. Existing electrical power poles on or adjacent to the development site shall be relocated at developer's expense in accordance with City of Caldwell and Idaho Power Company specifications and requirements. 6. Any fencing required to be relocated shall be constructed in accordance with Caldwell Industrial Airport requirements. 7. Any required fire hydrants shall be constructed at developer's expense. Curt Hawkins 208-459-8081 . 2 Curt Hawkins Manager Caldwell Industrial Airport 4601-4 Aviation Way Caldwell, Idaho 83605 (208)459-9779 May 2, 2002 Jerome Mapp Hearing Examiner RE: Idaho Commercial Construction Co. Dear Mr. Mapp As Manager of the Caldwell Industrial Airport C have been in close contact with the proposal from Idaho Commercial Construction Co. and their Client"Highland Appraisal." I am in complete agreement with the location and construction project housing both a hangar to store the airplane for use in their business and the associated office. 6 ,i/t>f o Curt Hawkins Airport Manager pA-3