HomeMy WebLinkAbout03 Public Agency PUBLIC AGENCY 1
ITEM DATE SUBMITTED BY
A- I NuALD y - Z2,-D2 off eVVOLON,
tv-)p " ,, 1-[ - zs
a6p:D.„.k.
P -3 rrA,MO 5 , 2 -D7. OA 4_.vAccIAA
!
pPR 22 2002
DATE: April 19, 2002
TO: Steve Hasson, Community Development Director
FROM: Douglas Brown, Assistant Chief/Fire Marshal
SUBJECT: Comments for Caldwell Planning & Zoning Commission
May 2, 2002 Meeting
The Caldwell Fire Department (CFD) offers the following comments regarding the following cases
to come before the Caldwell Planning&Zoning Commission on May 2, 2002:
Case No: SUP-160-02
Applicant: Idaho Commercial Construction Company
Project: Aircraft hangar and offices
Location: Caldwell Industrial Airport(Aviation Way)
The CFD has no objection to this SUP request and will address specific fire code requirements
during the building permit plan review process.
Case No: SUP-161-02
Applicant: Mennonite Church
Project: Change of Use—convention center to church
Location: 701 N. Indiana Ave.
The CFD has already completed a building permit"change of use"plan review on this
application. Prior to submitting the plan review I was advised that the Applicant had pulled their
building permit request.
This facility is not able to meet the UFC standards for minimum required fire flow or fire
hydrant distances in proximity to the structure. To mitigate the problem will require the
installation of two (2) fire hydrants (one off-site and one on-site), or, a single fire hydrant in
conjunction with a fire sprinkler system. I have attached the plan review to these comments for
additional information.
1
Memorandum
To: Steve Hasson
n
City g APR 2 5 2002
From: Gordon Law, Cit Engineer ( !
Ben Weymouth, Assistant City Engineer
Re: Case No. SUP-160-02
Date: April 15, 2002
The Engineering Department provides the following comments concerning a special use permit
request to construct an aircraft hanger and office building at the Caldwell Industrial Airport:
1. Aviation Way is designated as a Collector Street and as such has the potential for high traffic
volumes. The two (2) ingress/egress approaches shown on the proposed site plan shall be
changed to utilize the two (2) existing approaches adjacent to this development.
2. Any development which increases the amount of impervious area shall make provisions for
the disposal of stormwater drainage in accordance with the City's Stormwater Management
Policy. A copy of this policy is available upon request. The engineer of record shall provide
calculations, which indicate that the assumptions in his storm drainage plan comply with the
storm drainage policy.
3. This development proposes to construct parking over an existing drain ditch. Said ditch shall
be structurally backfilled in accordance with the developer's engineering report.
4. City sewer and water are currently available to the proposed development. The capacity of
the sewer and water systems, the City's ability to provide services, and connection fees for
these services will be determined as part of the Building Permit process.
5. Existing electrical power poles on or adjacent to the development site shall be relocated at
developer's expense in accordance with City of Caldwell and Idaho Power Company
specifications and requirements.
6. Any fencing required to be relocated shall be constructed in accordance with Caldwell
Industrial Airport requirements.
7. Any required fire hydrants shall be constructed at developer's expense.
Curt Hawkins 208-459-8081 . 2
Curt Hawkins Manager
Caldwell Industrial Airport
4601-4 Aviation Way
Caldwell, Idaho 83605
(208)459-9779
May 2, 2002
Jerome Mapp
Hearing Examiner
RE: Idaho Commercial Construction Co.
Dear Mr. Mapp
As Manager of the Caldwell Industrial Airport C have been in close contact with the proposal from
Idaho Commercial Construction Co. and their Client"Highland Appraisal."
I am in complete agreement with the location and construction project housing both a hangar to store
the airplane for use in their business and the associated office.
6 ,i/t>f
o
Curt Hawkins
Airport Manager
pA-3