HomeMy WebLinkAbout05 Hearing Examiner PLANNING AND ZONING Werifli
ITEM DATE SUBMITTED BY
ODNwv2.d1 Zo/o z C ctQ;
PZ-7 0,prvvvu.RA- c>12_c)lo2._ E*AIN
Pa- 3 �) r ' ert �, ( 19 ((z
�
PUBLIC HEARING COMMENT SHEET
(PLEASE PRINT CLEARLY)
NAME: Ckee", i?erith
STREET ADDRESS: 19/i ,
CITY/STATE/ZIP: Ca/Lis :4/ e7
NAME OF CASE BEING HEARD: StiP no,2
****************:E****ic***************It*;t********************ye***irk************AA A A*******
Check the appropriate line:
Applicant or Representative I- I Neutral/
wish to speak
i do not wish to speak
In favor/ i Opposed/
wish to speak v- i wish to speak
do not wish to speak I do not wish to speak
Written comments may be attached to this form or you may write them in below.
a �.L�C �iA LNG C0i1.11 J�F_N T SI=IEET .
{PLEASE PRINT CLEARLY)
NAME: -‘ 1-4 C-7: c3 (�
STREET ADDRESS: g / 0 /1) /a
CITY/STATE/ZIP: (1x)-1 e. (( , D cJ g ( O c
NAME OF CASE BEING HEARD:Sp f 6 6 6
***** AA A AAA A*k***********'.1 k:*AAAA A*****AAAAAA**;l******:F*****AA AAA AA.4*it***
Check the appropriate line:
Applicant or Representative I Neutral/
1 wish to speak
do not wish to speak
In favor/ 1 Opposed/
wish to speak ›e 1 wish to speak
do not wish to speak I do not wish to speak
Written comments may be attached to this form or you may write them in below.
CASE NO. SUP-163-02
Caldwell School District # 132
BEFORE THE PLANNING AND ZONING COMMISSION
CITY OF CALDWELL, IDAHO
June 20, 2002
AN APPLICATION SUBMITTED BY CALDWELL SCHOOL DISTRICT:
• RECONCILE THE PROHIBITION OF TWO LAND USES ON A SINGLE PROPERTY
THROUGH THE PLANNED UNIT DEVELOPMENT PROCESS.
• A SPECIAL USE PERMIT TO ACCOMMODATE THE PLACEMENT OF PUBLIC SCHOOL
CLASSROOMS IN AN R-1 (SINGLE FAMILY RESIDENTIAL) ZONE
• A SPECIAL USE PERMIT TO ACCOMODATE THE PLACEMENT OF A CHURCH AND
SECURITY QUARTERS, PUBLIC SCHOOL CLASSROOM USE, AND OTHER POTENTIAL
USES ON A PARCELOF LAND IN A CONFORMING MANNER.
TABLE OF CONTENTS:
I. COURSE OF PROCEEDINGS,
II GENERAL FACTS,
III TESTIMONY,
IV APPLICABLE LEGAL STANDARDS,
V COMPREHENSIVE PLAN ANALYSIS,
VI FINDINGS OF FACT,
VII CONCLUSIONS OF LAW,
VIII ORDER OF DECISION
IX ADDITIONAL CONDITIONS
I COURSE OF PROCEEDINGS
1.1 The Caldwell Community Development Department issued a notice of Public Hearing on
application SUP-163-02, to be held before the Planning and Zoning Commission on June 20th,
2002. Public notice requirements set forth in Idaho Code, Chapter 65, Local Planning Act, were
met. On June 5, 2002 notice was published in the Idaho Press Tribune, and on May 31, 2002
notice was mailed to all property owners within 300 feet of the project site; and, on June 13,
2002 notice was posted on the site.
1.2 Files and exhibits relative to this application will be available for review in the Community
Development Department, Caldwell City Hall, as well as all public hearings.
II GENERAL FACTS
2.1 APPLICANT/ REPRESENTATIVE: Caldwell School District #132, c/o Chuck Randolph, 1101
Cleveland Boulevard Caldwell, Idaho 83605.
2.2 OWNER: Caldwell United Methodist Church 824 East Logan, John English, Chairman Board of
Trustees.
Sr'-;
PA-3
2.3 REQUEST: The Caldwell School District is experiencing impact upon its resources and
particularly in it's elementary classroom space due to the considerable influx of children into the
School District. To remedy this issue, the School District is pursuing a bond issue that would
provide the capital to build a new elementary school. In the interim, the school needs to
improvise by entering into contract arrangements with other organizations for classroom space.
The school District has established a relationship with the Caldwell United Methodist Church for
use of the church facilities to accommodate the School District overcrowding situation.
It should be noted that the all of the present uses associated with the church could be
considered church related, to include a residence located on site used for security purpose.
Therefore, the acquisition of special use permit, to include application for a planned unit
development (PUD) is intended to address the land use issues that arise from the placement of
a school use on a parcel of land that already has a defined land use (a church). Additionally, this
PUD qualifies the land use associated with the church mission so that the church does not find
itself in a non-conforming status whereby it cannot expand or enlarge its facilities.
The specific request is to allow the temporary placement of three classrooms in the Sunday
School wing of the Church on an ongoing basis as the need for use of that facility arises.
Approximately 25 kindergarten students will be served in each classroom. One teacher and one
instructional assistant will be assigned to each class. Students will be in attendance for two
hours and fifty minutes during the morning. A second group of students will attend in the
afternoon. Classes will be held Monday through Friday. Teachers and staff will arrive each day
at 8:00am and end their days at 4:00 pm. Students will be on site from 8:45 am to 11:55 am for
morning kindergarten and 12:30 pm to 3:20 pm for afternoon kindergarten.
The applicant advises that the kindergarten students will be housed in clean, safe classrooms in
a building with in line sight of Lincoln Elementary School. The United Methodist Church has a
large park in the back of the building, which will accommodate limited outdoor activities. The
building is set back 130 feet from East Logan Street.
There is more than ample off street parking for staff, parents, guests and community volunteers.
Additionally, the morning and afternoon kindergarten buses have room to load and unload off
Logan in the church's Sunday school wing set back.
The placement of a school in any zone requires a special use permit. The expansion of a church
use to accommodate a public school use also needs a special use and, in part, to address
issues of non-conformance that might prohibit the church from expanding or enlarging its use.
Additionally, the placement of two uses on a single piece of land requires the acquisition of a
special use permit for a planned unit development: Zoning Ordinance No. 1451, Section 10-02-
01, General Regulations, allow only one of the uses set forth in Table 1, Land Use Schedule, to
be permitted on one lot unless otherwise approved under Section 10-03-07, entitled Planned
Unit Developments (PUD's); these PUD's are approved through the special use permit process.
Thus, a church building also used as a public school is allowed on one parcel of land in an R-1
zone by way of a planned unit development.
2.4 LOCATION: 824 East Logan Street.
2.4.1 COMPREHENSIVE PLAN DESIGNATION: Residential
2.5 COMPREHENSIVE PLAN COMPONENTS APPLICABLE TO THE REQUEST:
2.6 Property Rights: Staff reviewed the five checklist criteria set forth by the Attorney General in
the "Idaho Regulatory Takings Act Guidelines" and did not answer yes to any of the criteria.
2.7 School Facilities and Transportation: The Caldwell School District was notified of the request
through mailing of the public hearing notice on May 31, 2002.
2.8 Land use: The placement of a school in any zone requires a special use permit. The expansion
of a church use to accommodate a public school use also needs a special use and, in part, to
address issues of non-conformance that might prohibit the church from expanding or enlarging
its use.
Zoning Ordinance No. 1451, Section 10-02-01, General Regulations, allow only one of the uses
set forth in Table 1, Land Use Schedule, to be permitted on one lot unless otherwise approved
under Section 10-03-07, entitled Planned Unit Developments (PUD's); these PUD's are
approved through the special use permit process. Thus, a church building with public school
classrooms is allowed on one parcel of land in an R-1 zone by way of a planned unit
development.
2.9 Transportation and Parking: In their narrative the Applicant provides the following: The church
site offers more than ample off street parking for staff, parents, guests and community
volunteers. Additionally, the morning and afternoon kindergarten buses have room to load and
unload off Logan in the church's Sunday school wing set back.
Buses will slow traffic on East Logan Street only as they turn into the church parking lot; they
will not block traffic by loading and unloading on the street. Staff cars should total fewer than 8
per day, contributing only minimally to traffic. Parent drop off and pick up can be handled in the
church parking lot.
2.10 Public Services, Utilities and Facilities: In a memo dated June 7, 2002, the Engineering
Department provides the following comments on the above referenced Special Use Permit
request by the Caldwell School District #132 for a Planned Unit Development to utilize a portion
of the existing United Methodist Church on Logan Street for kindergarten classrooms.
The existing property is currently connected to City sewer and water services. At the time of
building permit issuance a determination shall be made if additional sewer and water use fees
shall be assessed.
2.10.1 Fire protection: The CFD has met with principals from the church and the school district at this
facility to discuss their plans. This is a doable project from our perspective though there will be
numerous conditions imposed. Consideration will be given for the temporary nature of the use.
This facility is exempt from Idaho Department of Building Services plan review because it will be
below their cost threshold. There may be some UBC considerations that will have to be
resolved.
2.11 Transportation: The subject property has 280 feet of street frontage on the south side of East
Logan, approximately 220 feet east of Idaho Avenue. Logan is functionally classified as a Major
Collector according to the Canyon County Functionally Classified Road map. Oregon Avenue
dead- ends into East Logan in front of the church.
III TESTIMONY
3.1 Steve Hasson, Community Development Director, presented the staff report and outlined the
facts as outlined. Mr. Hasson reported on the necessity of the church to acquire a planned unit
development (PUD) for the placement of a school use on the parcel which currently has the land
use of a church, thus allowing more than one use on the parcel. It was noted that a school in
any zone requires a special use permit. All present uses on the parcel are church related to
include a residence on site for security purposes.
3.2 Chuck Randolph, Applicant, testified in favor. Mr. Randolph reported that the Methodist Church
has been used twice before for additional classroom space by the school district. He stated that
current growth at the elementary schools is approximately 150-200 students per year. The
average attendance at the elementary schools is 465-515 students, however, Wilson
elementary is expecting more than 960 students this coming school year. Modular units have
been installed at the VanBuren Elementary, Syringa Middle School, and Jefferson Junior High
to help eliminate the overcrowding conditions.
Currently three classrooms within the church have been identified for use as additional
kindergarten classes. Approximately 150 students, 75 in the morning classes and 75 in the
afternoon classes, will be attending kindergarten classes located at the church. The children
will be bussed to the location with Wilson Elementary being the home school for the majority of
the children. The use will be for ten months out of the year (177 student days).
A bond issue will be put before the voters for a sixth elementary school in September 2002. If
the bond issue passes, the new elementary will be available for fall 2004.
3.3 John English testified in favor. Mr. English introduced himself as the Chairman of the Board of
Trustees from the Caldwell United Methodist Church. He stated that the church welcomes the
opportunity to help Caldwell School District by providing the facilities for their needed classroom
space.
Testimony closed.
IV APPLICABLE LEGAL STANDARDS
4.1 City of Caldwell 1977 Comprehensive Plan, as amended.
4.2 City of Caldwell Zoning Ordinance No. 1451, as amended.
4.3 Idaho Code, Chapter 65, Local Planning Act
V COMPREHENSIVE PLAN ANALYSIS — The Commission accepted the Comprehensive Plan
Analysis as stated.
5.1 Property Rights -
GOAL: To ensure that land use policies, restrictions, conditions and fees do not violate property
rights, adversely impact property values or create unnecessary technical limitations on the use
of the property.
OBJECTIVE B: To identify potential takings of private property prior to a regulatory or
administrative action on specific property.
POLICY 1: Require staff to follow the Attorney General's Checklist Criteria outlined in the Idaho
Regulatory Takings Act Guidelines prior to any proposed regulatory or administrative action on
specific property, and to request legal counsel's review if any one of the criteria is answered in
the affirmative. Staff reviewed the five criteria outlined in the Takings Act Guidelines and did not
answer yes to any of the criteria.
5.2 School Facilities and Transportation -
GOAL: To provide the on-going opportunity for school representatives of Caldwell and Vallivue
School Districts to participate in the community planning process.
POLICY 1: Include the school districts in the review process when considering land-use
proposals. At a minimum, notice of the hearing for each proposal should be provided to the
districts and any additional information that the districts might subsequently request.
5.3 Economic Development—
GOAL: To continue to work toward providing the residents of Caldwell with adequate levels of
all of the components of economic development, such as housing, business, jobs, schools,
recreational opportunities, infrastructure systems, public utilities and facilities, and public
services. If approved, the church should help to enhance the community's reputation value by
providing an important social and cultural amenity.
5.4 Land Use—
GOAL: To establish land-use management policies that protect property rights and the
environment, maintain a high quality of life, provide adequate land for all types of development
and adequately buffer non-compatible uses.
OBJECTIVES APPLICABLE TO ALL LAND USES:
OBJECTIVE A: To guide the growth and development of land uses in such a way that the
health, safety, and general welfare of residents will be protected.
OBJECTIVE C: To promote growth in areas where public facilities and services are readily
available. The City's public water/sewer systems are readily available to serve this area.
5.5 Natural Resources -
If approved, the Applicant will be required to meet the standards set forth in the City's Storm
Drainage Policy.
OBJECTIVE A: To ensure that surface waters may continue to be used for their designated
beneficial uses.
OBJECTIVE C: To protect surface waters and wetlands as a part of the overall hydrologic
cycle.
POLICY 1: Prevent the collection and conveyance of untreated stormwater, created by new
development, into surface bodies of water by requiring developers to comply with local, state
and federal stormwater policies.
5.6 Public Services, Utilities and Facilities —
GOAL: To ensure that there are adequate police, fire, emergency services, and public utilities
to meet the needs of the public.
OBJECTIVE B: To provide for the orderly expansion of public services to meet the needs of
population growth.
The Irrigation District and fire district have been notified for comment purpose.
5.7 Transportation
GOAL: To provide for the efficient, safe, and cost effective movement of people and goods.
OBJECTIVE A: To protect public safety and the environment.
VI FINDINGS OF FACT
6.1 The Planning and Zoning Commission accepted the general facts outlined in the staff report and
facts brought forward during public testimony.
VII CONCLUSIONS OF LAW
7.1 The Planning and Zoning Commission has the authority to hear this request and to approve or
deny it. The public hearing notification requirements were met, and the hearing was conducted
within the guidelines of applicable codes and ordinances.
VIII ORDER OF DECISION
8.1 Based on the Findings of Fact and Conclusions of Law, the Caldwell Planning and Zoning
Commission orders that Case No. SUP-163-02, a request by the Caldwell School District for a
Planned Unit Development for a church, security quarters, and school classrooms is approved
with the following conditions:
8.2 The specific terms and conditions placed on the Special Use Permits shall run with the land and
remain valid upon a change of ownership, or until such time that the Permits may be revoked,
become invalid, or replaced with another approved use. The Special Use Permits are not
transferable from the approved site to another site.
8.3 The Applicant, or future assigns having an interest in the subject property, shall fully comply with
all conditions placed upon the Special Use Permits.
8.4 No change to the conditions and terms of the Special Use Permit, as approved, shall be
undertaken by the Applicant, or future assigns having an interest in the subject property, until
the Community Development Director has reviewed the proposed changes and determined
whether or not the change(s) is substantial. If the change(s) are determined to be substantial,
an amendment shall only be approved by the public hearing process.
8.5 Any violation of the terms and conditions of the Special Use Permits by the Applicant, or future
assigns having an interest in the subject property, will be deemed a misdemeanor and subject
to the provisions set forth in Idaho Code, 18-113. Each day's continued violation will be
deemed a separate offense.
8.6 A building permit/ change in use permit is required prior to any use commencing on site. A
change in use application shall be submitted within six months from the date of signing the
Order of Decision or the Applicant, or future assigns having an interest in the subject property,
shall request a six-month extension from the Community Development Director. No further
extensions shall be granted unless the Applicant, or future assigns having an interest in the
subject property, applies for an amendment requesting approval extension of the special use
permits and it is granted following the public hearing process; every time the use changes a new
change in use permit is required.
8.7 All of the requirements placed on the change in use permit by the Community Development
Director, Building Official, Fire Marshall, City Engineer and any other applicable agency having
review authority shall be met prior to an occupancy permit being issued.
8.8 The Applicant shall not install any additional signage on the church premises.
8.9 Some type of room numbering system must be used and room numbers posted on or near the
doors to each classroom.
8.10 An approved secondary means of egress must be provided from each classroom.
8.11 Illuminated exit signs with battery backup are required at both ends of the hallway.
8.12 Emergency lighting shall be provided in the hallway and may be part of the exit light units.
8.13 There shall be two (2) 2A:10BC rated fire extinguishers — located at both ends of the hallway.
They shall be mounted or placed in wall cabinets between 3' to 5' above floor level and be
readily visible.
8.14 Fire escape routes and evacuation plans shall be posted in each classroom showing two ways
out in case of fire. The plans shall be mounted at average eye-level for a kindergarten student.
The principal exit shall be the one facing Logan Street. The other exit which empties into the
hallway near the chapel should not be used except as a last resort.
8.15 A temporary fire alarm shall be provided. It shall consist of small "canned" air horns that shall
be kept in a specific location near the primary classroom exit doorway. The horn shall be
identified as "Temporary Fire Alarm" and include an adjoining instruction sheet that states: "For
emergency use only. In case of fire sound five (5) short blasts and repeat the signal every ten
seconds until all persons are evacuated from the building." One steady blast for five seconds
will be the "all clear" signal. (The air-horn air-cans shall be replaced at the first sign of low air
pressure and spare cans shall be kept handy for backup.)
8.16 Classroom occupancy is limited to no more than 30 students per classroom.
8.17 Fire drills shall be conducted monthly for all students, faculty and staff. Two fire drills shall be
conducted the first week of school using a different escape route each time.
8.18 All electrical code violations shall be corrected and made safe (ceiling fan wiring).
8.19 The doors between the Chapel area and the classroom hallway shall be kept closed at all times
but shall never be blocked or locked while the classrooms are in use.
8.20 The hallway and each separate classroom shall have a single-station battery-powered smoke
detector and these shall also be tested monthly.
8.21 All teachers shall practice safe housekeeping and avoid excessive accumulations of
combustible materials in their classrooms.
8.22 The hallway shall be kept clean and clear at all times.
8.23 The use of extension cords, coffee pots, hotplates, etc. is prohibited. Only listed and approved
multi-plug outlets are approved. Multi-plug outlets shall not be "daisy chained."
CASE NO. SUP-163-02 WAS HEARD BY THE PLANNING AND ZONING COMMISSION AT A
PUBLIC HEARING HELD JUNE 20, 2002.
WRITTEN FINDINGS OF FACT, CONCLUSIONS OF LAW AND THE ORDER OF DECISION WAS
ADMINISTRATIVELY APPROVED AND SIGNED BY CHAIRMAN ROBISON ON THE DATE NOTED
BELOW.
ILLAA_ te- ,
7- � �/ J 0 oZ ATTES
Cha';1rnan Sylvia Robison Date
Commun. Development Director