DATE: November 8, 2002 '1 NOV j j 2002 l
TO: Steve Hasson, Community Development Director ,
FROM: Douglas Brown, Assistant Chief/ Fire Marshal
SUBJECT: Comments for Caldwell Planning &Zoning Commission
November 21, 2002 Meeting
The Caldwell Fire Department (CFD) offers the following comments regarding the following cases
to come before the Caldwell Planning & Zoning Commission on November 21, 2002:
Case No: SUP-180-02
Applicant: Adolfo Sarmiento
Project: Converting a grocery store to a residential use
Location: 404 Chicago Street
The CFD does not object to this change in use and will comment on this change and assign any
conditions during the building plan review.
Case No: SUP-173-02
Applicant: Sallie Palleria
Project: Four-plex
Location: Ohio Avenue about 150 feet south of Beech
The CFD will comment and condition this project during the building plan review.
Case No: ZON-26-02 and SUP-178-00
Applicant: LDS Church
Project: Change in zoning and church and parking lot
Location: NW corner of 13th and Everett
The CFD has no objection to the change of zoning and will comment and condition this project
for the church portion during the building plan review.
1
pA- I
J
t
Memorandum �{, 0: EIVE
To: Steven Hasson NOV 1 1 2002
From: Gordon Law, City Engineer
Re: ZON-26-02 and SUP-178-02
Request by LDS Church to Build Parking Lot at 13th Avenue and Everett
Date: November 5, 2002
The Engineering Department has reviewed the above request for a Rezone and Special Use Permit
and provides the following comments:
1. Any additional impervious area created by modifications to existing grounds must be dealt with
in accordance with the City's Storm Water Management Policy.
2. The existing right-of-way is adequate for the existing and proposed uses and the right-of-way
width is consistent with existing City policies and ordinances.
3. All curb, gutter, and sidewalk in disrepair will be required to be replaced.
4. ADA compliant pedestrian ramps will be required at the corner of 13th Avenue and Everett.
5. Irrigation Water for this development shall be supplied from Caldwell Irrigation Lateral
District.
6. Driveway approaches shall be located as far as possible from the intersection of Everett Street
and 13th Avenue.
Page 1 of 1
Memorandum
To: Steve Hasson
From: Ben Weymouth,Assistant City Engineer
Re: Case No. SUP-178AP-02
Date: January 9,2003
The Engineering Department previously commented on this application when it was before the Planning
and Zoning Commission. Those comments continue to apply to this development as originally submitted.
Page 3 of 3
2 N' 3
Memorandum
To: Steve Hasson
From: Ben Weymouth,Assistant City Engineer
Re: Case No.ZON-26-02
Date: January 9,2003
The Engineering Department previously commented on this application when it was before the Planning
and Zoning Commission. Those comments continue to apply to this development as originally submitted.