Loading...
HomeMy WebLinkAbout03 Public Agency ,. .a.,.,.,-,.d.....:�..� PUBLIC L AGl.Jl iT�C 1 ,........�a,- .... ...., _ _..�—.,.....�. --.�....,.,,.,�.m.iF rL ITEM DATE SUBMITTED BY .AI * rv1 Z 101 _ • _ PP`3 EVl 31 b3 p∎..© J o '-'� • CAL&CIVELL FIRE DEPARTMENT 0 `� ,i k`�y CITY OF CALDWELL i1 ,i 310 South 7th Avenue t l ra it, ur Protecting 1t,irr? rt tt; :n .,<< ,es CALDWELL,IDAHO 83605 1 �. s (208)455-3032 DATE: February 12, 2003 TO: Steve Hasson, Community Development Director FROM: Douglas Brown, Assistant Chief/Fire Marshal, , SUBJECT: Comments for Caldwell Hearing Examiner February 26,2003 Meeting The Caldwell Fire Department (CFD) offers the following comments regarding tie following cases to come before the Caldwell Hearing Examiner on February 26, 2003: i Case No: SUP-83P-03 and ZON-28-03 Applicant: Providence Development Project: Montecito Park Subdivision Location: N of Hwy. 20-26 and west of future extension of Aviation Way (See separate plan review comments memo.) Case No: ANN-79-03, SUB-84P-03 and ZON-28-03 Applicant: Pinnacle Engineering Project: Apple Creek Subdivision Location: W of Montana Ave. and S of Ustick Rd. (See separate plan review comments memo.) 3 2 Case No: SUP-183-03 f Applicant: WICAP Headstart i Project: Child care center/ school Location: Graye Lane near Laster Lane The CFD has met with the Applicants and city staff to review this project. The CFD wit_ address the fire protection concerns upon the submittal of plans for a building plan review. 1 eP\--' .., i } i Memorandum To: Debbie Geyer From: Ben Weymouth, Assistant City Engineer 164/1 / Re: Case No. SUP-183-03 Date: February 10, 2003 The Engineering Department provides the following comments concerning a Special Use Permit request by WICAP Headstart to operate a childcare center/school located on lots 16, 17, 18 and 19 of the Happy Day Business Center. The site is located approximately 400 feet southeast of the intersection of Graye Lane and Happy Day Boulevard and extends northeasterly to the right-of-way boundary for the Union Pacific Railroad. 1. In accordance with City Code, street side improvements are required in any public right-of-way adjacent to subject property. Improvements are to include curb and gutter, sidewalk, paving (up to 1/2 section plus 7.5 feet), streetlights (if not already present), sewer and water mains. Currently the site has approximately 250 feet of frontage that will require improvements to meet City standards. 2. This site is currently served by City water and sewer mains in Graye Lane that will be available for use by the site. Sewer and water connection fees will be reviewed during the Building Permit process. 3. The applicant will be required to construct a headwall on northeast side of the Highline Canal crossing. 4. The applicant will need to ensure that all Pioneer Irrigation District Crossing Agreements for the Highline Canal have been approved and are still applicable. 5. Irrigation water for any and all landscaping shall be obtained from Pioneer Irrigation District Sources. 6. Development shall locate the driveway approach to allow for a safe and clear sight distance in an effort to avoid safety hazards that may occur from northwesterly traffic on Graye Lane. 7. Development Plans — Prior to any proposed use or commencing any construction, plans must be prepared by the developer's engineer and approved by the City Engineering Department which include the following items: a. Connections to City sewer and water systems; b. Stormwater facilities (per City Policy); c. Irrigation system (per Pioneer Irrigation District requirements). d. Driveway Locations e. Street Improvements 8. Prior to commencement of construction in any dedicated right-of-way, the City Engineering staff is to be notified. This preferably will take place in a pre-construction conference scheduled by the engineer of record in which all appropriate personnel and utilities are present. Appropriate City personnel are to be notified in advance of all required inspections. 9. As noted previously, provision is to be made for the disposal of stormwater drainage in accordance with the City Stormwater Management Policy. A copy of this policy is available upon request. The developer's engineer is to provide calculations, which indicate that the assumptions in his stormwater drainage plan comply with the requirements of the stormwater policy. Page 1 of 2 10. During the design phase of this project, the developer or his engineer is to contact Pioneer Irrigation District to ascertain all existing upstream drainage rights and downstream irrigation rights that need to be maintained across the property. Appropriate facilities should be provided to convey irrigation and drainage water across the property to take care of these offsite needs. There is to be no discharge of irrigation return water into the on-site storm water system. A letter is to be obtained from Pioneer Irrigation District indicating their concurrence with the design and facilities that preserve these existing rights. 11. Appropriately licensed public works contractors shall perform all construction of dedicated facilities. Page 2 of 2 UG11416VUJ 4•124401 r1VLILLal aalawa r 2 Pioneer Irrigation District P CX ®®X 426 7 CALDWELL, IDAHO 83506 JEFF SCOTT (208)456-361 9uperintendenc MARX T,IASCHkY NA DA KCELLE rna .Lilt Suptrin{endent Squreuuy-Tressnn'r February 13, 2003 City of Caldwell Community Development Department Fax: 455-3050 • RE: WICAP Headstart(child care center) TO WHOM TT MAY CONCERN: Please be advised there is a delivery point in place for the property being proposed for development. Pioneer Irrigation District's main concern is that all water rights within the District be hunt:red, and that access to irrigation water be provided to every parcel of land. All existing easements, right-of-ways, and other means used to honor the water riE hts to downstream waterusers must be maintained and allowed to continue to exist. It is imperative that no one disrupt the delivery of water to a downstream water user. Any lateral, canal, drain or other means used to deliver water, along which there is a right-of-way or easement, must have the same kept clear of all obstructions at all times. No fences, structures, or other materials are allowed on any of the District's casements or right-of-ways AND they must be recorded on the final plat. PLEASE NOTE: The!Brine Canal and the Railroad Lateral have a 16-foot from top of bank prescriptive use easement. The above paragraph regarding obstructions and the need for recording on the final plat must be adhered to on this waterway, Any discharge or run-off into a federal drain must meet the approval of Mr. John Caywood of the Bureau of Reclamation. Pioneer Irrigation District does not assume any responsibility for such an approval, His telephone number is 334-1463. Attention; Solomon Drain (100 foot easement—50 ft from center) Please be advised that IF it is the intent of the developer to put in a pressurized irrigation system and have Pioneer take over said system once the development is completed, the following ;steps are necessary: 1, Said system must be put in according to the current Standards and Specifications of Pioneer Irrigation District. 2. The developer must contact the office of Earl Mason& Stanfield to make arran;l;ements for on-site inspections to be made at various points of construction, An engir eer from Earl Mason & Stanfield must be involved in the inspections as they are the engineers for Pioneer Irrigation District and are familiar with the requirements of Pioneer. • PA-3 O2/14r2003 05:13 FAX 45044141 Y1Ulvxxx txxtc, IQ uc 3. The engineering fees will be the responsibility of the developer and/or owner, and a deposit must be paid in advance to Pioneer Irrigation District before the District will authorize Earl Mason & Stanfield to review engineering plans. Estimated costs for the District's engineering fees are $500 plus $5.00 per lot. If that amount fails to c over the costs involved due to the necessity to revise plat maps, etc., additional costs will be billed out and paid prior to the District's signing off on the final plat. 4. If it is the developers plan to have Pioneer Irrigation District take over a pressur.zed irrigation system for the subdivision, it will be necessary that the pump site be designed at the District's current point of delivery. Service to the subdivision from the pump site must have its own private delivery line from the delivery point to the subdivision3. 5. A Maintenance Agreement must be written up and recorded at the expense of the Developer and/or owner. All Maintenance Agreements must be reviewed by and approved by the District's Attorney, Scott Campbell, of Moffatt Thomas in Boise, The least expensive way to have a Maintenance Agreement drawn up which meets tie needs of the District is by having Mr. Campbell himelf draw it up_ Otherwise there will be two attorney fees for said developer and/or owner to pay. Mr. Campbell may be contacted at 345-2000. A deposit of$750.00 must be paid to Moffatt Thomas to cover the attorney fees before the work can begin. Any unexpended portion of the: deposit will be refunded. 6. Earl Mason and Stanfield must walk through the site and develop a punch list to be completed prior to recommending that Pioneer Irrigation District take ever the pressurized irrigation system. If it is NOT the intent of the developer to request Pioneer Irrigation District to take over a pressurized irrigation system within their completed development, then the above six steps do not apply to their planned development. Any proposed development which will have downstream waterusers using gravity flow irrigation must develop their irrigation system in a manner which will insure the downstream waterusers the ability to acquire at least as much irrigation water for gravity flow irrigation as what they received prior to any development or construction taking place. The gravity flow irrigation system must be totally separate from the proposed pressurized irrigation system within a subdivision. NOTE: This letter does not authorize any construction to commence until all the necessary agreements with Pioneer Irrigation District have been executed and recorded. If you have any quest+ns,please feel free to call. / Sine e , r • Mark F. Zir- Assistant Superintendent