Pioneer Irrigation District
P.0 BMX 428 • CALDWELL, IDAHO 83606
JEFF SCOTT (?08)459-3617
Supaintefldent
MARK ZIRSCRKY NAIDA hELLEHI:R
ASet Supainl adear SmtirsrY-Trryv z:r
February 24, 2003
City of Caldwell Planning and Zoning Department
Fax: 44-4,1163`.3
Re: Case No. ZON-29-03 and SUP-184-03 (Adelle Doty)
TO WHOM IT MAY CONCERN:
Please be advised there is a delivery point in place for the property being proposed for deve lopment.
Pioneer Irrigation District's main concern is that all water rights within the District be hon:3red, and
that access to irrigation water be provided to every parcel of land.
All existing easements, right-of-ways, and other means used to honor the water rights to
downstream waterusers must be maintained and allowed to continue to exist. It is imperative that
no one disrupt the delivery of water to a downstream water user.
Any lateral, canal, drain or other means used to deliver water, along which there is a right-of way
or easement, must have the same kept clear of all obstructions at all times. No fences, structures,
or other materials are allowed on any of the District's easements or right-of-ways AND they must
be recorded on the final plat.
PLEASE NOTE: The Phyllis Canal has a 20-foot from top of bank prescriptive use easement.
The above paragraph regarding obstructions and the need for recording on the final plan must be
adhered to on this waterway. No waste water shall be allowed to enter the Phyllis Canal.
Any discharge or run-off into a federal drain must meet the approval of Mr. John Caywood of the
Bureau of Reclamation. Pioneer Irrigation District does not assume any responsibility for such an
approval. His telephone number is 334-1463. Attention: Parker Drain (100 foot easement—50
ft from center)
Please be advised that IF it is the intent of the developer to put in a pressurized irrigation s:,stem and
have Pioneer take over said system once the development is completed, the following steps are
necessary:
1, Said system must be put in according to the current Standards and Specification!, of
Pioneer Irrigation District,
2. The developer must contact the office of Earl Mason& Stanfield to make arrar gernents
for on-site inspections to be made at various points of construction. An engi leer from
Earl Mason & Stanfield must be involved in the inspections as they are the engineers
for Pioneer Trrigation District and are familiar with the requirements of Pioneer.
1
O3,'O3/2O03 08:44 FAX 4594491 PIONEER IRRIG L004-04
a. The engineering fees will be the responsibility of the developer and/or owner, and a
deposit must be paid in advance to Pioneer Irrigation District before the District will
authorize Earl Mason & Stanfield to review engineering plans. Estimated co,;ts for the
District's engineering fees are $500 plus $5.00 per lot. If that amount fails to cover the
costs involved due to the necessity to revise plat maps, etc., additional costs v iill
be billed out and paid prior to the District's signing off on the final plat.
4. If it is the developers plan to have Pioneer Irrigation District take over a pressurized
irrigation system for the subdivision, it will be necessary that the pump site be designed
at the District's current point of delivery. Service to the subdivision from the pump site
must have its own private delivery line from the delivery point to the subdivision.
5. A Maintenance Agreement must be written up and recorded at the expense of the
Developer and/or owner. All Maintenance Agreements must be reviewe.i by and
approved by the District's Attorney, Scott Campbell, of Moffatt Thomas in Boise, The
least expensive way to have a Maintenance Agreement drawn up which meets the needs
of the District is by having Mr. Campbell himself draw it up. Otherwise there will be
two attorney fees for said developer and/or owner to pay. Mr. Campbell may be
contacted at 345-2000. A deposit of$750.00 must be paid to Moffatt ihoma:, to cover
the attorney fees before the work can begin. Any unexpended portion of the deposit
will be refunded.
6. Earl Mason and Stanfield must walk through the site and develop a punch list to be
completed prior to recommending that Pioneer Irrigation District take over the
pressurized irrigation system.
if it is NOT the intent of the developer to request Pioneer Irrigation District to take over a
pressurized irrigation system within their completed development, then the above six steps do not
apply to their planned development.
Any proposed development which will have downstream waterusers using gravity flow irrigation
must develop their irrigation system in a manner which will insure the down Beam waterusers the
ability to acquire at least as much irrigation water for gravity flow irrigation as what they received
prior to any development or construction taking place_ The gravity flow irrigation syster i must be
totally separate from the proposed pressurized irrigation system within a subdivision.
NOTE: This letter does not authorize any construction to commence until all the necessary
agreements with Pioneer Irrigation District have been executed and recorded.
If you have any questions, please feel free to call.
Sincere ,
Hark f. Zirschky
Assistant Superintendent
Memorandum
To: Steve Hasson
From: Ben Weymouth, Assistant City Engineer
Re: Case No. SUP-184-03
Date: February 24, 2003
The Engineering Department provides the following comments concerning a Special Use Permit request by
Adelle Doty for a professional office located at 202 E. Ash Street. The site fronts on the south side of E. Ash
Street, approximately 273' east of Kimball Avenue.
1. Currently there is a 25-foot one-half right-of-way width along E. Ash Street. Per City requirements, the
applicant will be required to provide a 28-foot one-half right-of-way width for the development.
2. Currently the site has two driveway approaches that have approximately 48-foot 7-inches of separation
between them. City standards require a minimum of 50-foot separation between driveway approaches
(measured near edge of driveway to near edge of driveway). Given the limited use of the eastern
driveway, the Engineering Department does not object to the proposed spacing.
3. In accordance with City standards, the Applicant will be required to construct sidewalk along the
frontage of the development.
4. City water and City sewer currently serve this site. The nearest sewer line is an 8" line located to the
south of the southwest corner of the project site. There is an 8"water line that fronts the property in E.
Ash Street.
5. Prior to commencement of construction in any dedicated right-of-way, the City Engineering staff is to be
notified. Appropriate City personnel are to be notified in advance of all required inspections.
6. As noted previously, provision is to be made for the disposal of stormwater drainage in accordance with
the City Stormwater Management Policy. A copy of this policy is available upon request.
7. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation District sources.
8. Appropriately licensed public works contractors shall perform all construction of dedicated facilities.
Page 1 of 1
�A- z
DATE: February 20,2003
TO: Steve Hasson, Community Development Director
FROM: Douglas Brown,Assistant Chief/Fire Marshal
SUBJECT: Comments for Caldwell Planning&Zoning Commission
March 12,2003 Meeting
The Caldwell Fire Department (CFD) offers the following comments regarding the following cases to
come before the Caldwell Planning&Zoning Commission on March 12, 2003:
Case No: ANN-78-03
Applicant: Clyde Beougher
Project: Annexation of 19.5 acres
Location: E of S. Florida and N. of Karcher Rd.
The CFD does not object to this annexation and will comment and assign any conditions during the
normal subdivision or building plan review process.
Case No: ZON-29-03 and SUP-184-03
Applicant: Adelle Doty
Project: Rezone lot from R-1 to R-3
Location: 202 E. Ash Street
The CFD does not object to this annexation and will comment and assign any conditions during the
normal subdivision or building plan review process.
Case No: OA-48-03
Applicant: Community Development Director
Project: Amended Zoning Map
Location: Citywide
The CFD does supports adoption of the amended zoning map.
1
P,A --3
04/23:2003 10:49 FAX 4594491 PIONEER IRRIG 12 01.02
- Pioneer Irrigation District
JEFF SCOTT O. BOX 426 • CALDWEL L. IDAHO 83606
Supennandettt (209'459.361'
MARK ZIRSCHKl' Y�y ►.Z FfER
+sst 5uperia endr,t` April 22,2003 Ser.-etaryTruier
City of Caldwell Community Development Department
Fax: 455-3050
Re: Case No. ZON-29-03 (Adelle Doty)
TO WHOM 1T MAY CONCERN:
Please be advised there is a delivery point in place for the property being proposed for development.
Pioneer Irrigation District's main concern is that all water rights within the District be honored, and
that access to irrigation water be provided to every parcel of land. Delivery point for this property
is the Kimbal Lateral.
All existing easements, right-of-ways, and other means used to honor the water nights to
downstream waterusers must be maintained and allowed to continue to exist. It is imperative that
no one disrupt the delivery of water to a downstream water user.
Any lateral, canal, drain or other means used to deliver water, along which there is a right-of-way
or easement, must have the same kept clear of all obstructions at all times. No fences, structures,
or other materials are allowed on any of the District's easements or right-of-ways AND they must
be recorded on the final plat.
Any discharge or run-off into a federal drain must meet the approval of Mr. John Caywood of the
Bureau of Reclamation. Pioneer Irrigation District does not assume any responsibility for such an
approval. His telephone number is 334-1463. Attention: (100 foot easement—SO ft from center)
Please be advised that IF it is the intent of the developer to put in a pressurized irrigation,system and
have Pioneer take over said system once the development is completed, the following.; steps are
necessary:
1, Said system must be put in according to the current Standards and Specificatio:is of
Pioneer Irrigation District.
2. The developer must contact the office of Earl Mason& Stanfield to make arr tngernents
for on-site inspections to be made at various points of construction. An engineer from
Earl Mason & Stanfield must be involved in the inspections as they are thc: engineers
for Pioneer Irrigation District and are familiar with the requirements of Pion ser.
3. The engineering fees will be the responsibility of the developer and/or owner, and a
deposit must be paid in advance to Pioneer Irrigation District before the District will
authorize Earl Mason & Stanfield to review engineering plans. Estimated costs for the
1
•
(**/
04/23/2003 10:49 FAX 4394491 PIONEER IR.RIG 02,02
District's engineering fees are $500 plus $5.00 per lot. If that amount fails tc, cover the
costs involved due to the necessity to revise plat maps, etc., additional costs will
be billed out and paid prior to the District's signing off on the final plat.
4. If it is the developers plan to have Pioneer Irrigation District take over a pressurized
irrigation system for the subdivision, it will be necessary that the pump site b4:. designed
at the District's current point of delivery_ Service to the subdivision from the pump site
must have its own private delivery line from the delivery point to the subdivisi on.
5. A Maintenance Agreement must be written up and recorded at the expense of:he
Developer and/or owner. All Maintenance Agreements must be reviewed by and
approved by the District's Attorney, Scott Campbell, of Moffatt Thomas in Eloise, The
least expensive way to have a Maintenance Agreement drawn up which meet's the needs
of the District is by having Mr. Campbell himself draw it up_ Otherwise there will be
two attorney fees for said developer and/or owner to pay. Mr. Campbell may be
contacted at 345-2000. A deposit of$750.00 must be paid to Moffatt ThomELs to cover
the attorney fees before the work can begin. Any unexpended portion of tie deposit
will be refunded.
6. Earl Mason and Stanfield must walk through the site and develop a punch list to be
completed prior to recommending that Pioneer Irrigation District take over the
pressurized irrigation system.
If it is NOT the intent of the developer to request Pioneer Irrigation District to take over a
pressurized irrigation system within their completed development, then the above six sups do riot
apply to their planned development.
Any proposed development which will have downstream waterusers using gravity flow irrigation
must develop their irrigation system in a manner which will insure the downstream waterusers the
ability to acquire at least as much irrigation water for gravity flow irrigation as what they received
prior to any development or construction taking place. The gravity flow irrigation system must be
totally separate from the proposed pressurized irrigation system within a subdivision.
NOTE; This letter does not authorize any construction to commence until all the iecessary
agreements with Pioneer Irrigation District have been executed and recorded.
If you have any questions,please feel free to call.
Sincerely
Mark F. Zirsch‘4
Assistant Superintendent