Loading...
HomeMy WebLinkAbout03 Public Agency PUBLIC AGENCY ITEM DATE SUBMITTED BY ter Z✓✓ Qa�r'on PA- I /y'Iemo 17-l5'- 03 n'1a,eK Z �s cJ-Ky �cp�rtrne�� ?A - 2 mcmo 7- /8 - 03 LL,9 Erowv� C;fti CA ih c c✓r 05 pi) 3 Memo "7 - 21- 03 Ben (Aley Kr)ou�l, 07(152003 10:17 FAX 4594491 PIONEER IRRIG UO2,'04 CAM. — - == - Pioneer Irrigation District P. 0. 30X 425 » CALIWEO,L IDAMO 83806 JEFF SCOTT' soak 4E94617 Sucercarzadeac MARK 71RSCIDC1 1o!AIAA LT,FTiEB .�cs.p*awador Smeary-Tsaeci�t July 10, 2003 City of Caldwell Community Development Services . Fax: 453-3050 J • Attn: Jacqueline Hernandez � Re: Case No. SUP-190-03 (Lanny Berg: 1405,1407 Larch) TO WFIOM IT MAY CONCERN: Please be advised there is a delivery point in place for the property being proposed for de velopment. Pioneer Irrigation District's main concern is that all water rights within the District be he owed, and that access to irrigation water be provided to every parcel of land. Delivery point for this property is the Carnahand Pump. All existing easements, right-of-ways, and other means used to honor the water rights to downstream waterusers must be maintained and allowed to continue to exist. It is imperative that no one disrupt the delivery of water to a downstream water user. Any lateral, canal, drain or other means used to deliver water, along which there is a ri 4ht-of-way or easement, must have the same kept clear of all obstructions at all times. No fences, structures, or other materials are allowed on any of the District's easements or right-of-ways AND they must be recorded on the final plat. Please be advised, that the irrigation lines that deliver water to this property are private irrigation lines. Any discharge or run-off into a federal drain must meet the approval of Mr. John Caywood of the Bureau of Reclamation. Pioneer Irrigation District does not assume any responsibility for such an approval. His telephone number is 334-1463. Attention: Dixie Drain (100 foot easement-50 ft from center) Please be advised that IF it is the intent of the developer to put in a pressurized irrigation:.,ystern and have Pioneer take over said system once the development is completed, the followint4 steps are necessary: 1 07/15/2003 10:17 FAX 45E4491 PIONEER IRRIG [2]03iO4 1. Said system must be put in according to the current Standards and Specifications of Pioneer Irrigation District 2. The developer must contact the office of Earl Mason& Stanfield to make arn:ngements for on-site inspections to be made at various points of construction. An engineer from Earl Mason & Stanfield must be involved in the inspections as they are the engineers for Pioneer Irrigation District and are familiar with the requirements of Pioneer. 3. The engineering fees will be the responsibility of the developer and/or owner, and a deposit must be paid in advance to Pioneer Irrigation District before the District will authorize Earl Mason & Stanfield to review engineering plans. Estimated costs for the District's engineering fees are $500 plus 55.00 per lot. If that amount fails t:> cover the costs involved due to the necessity to revise plat maps, etc., additional costs will be billed out and paid prior to the District's signing off on the final plat. 4. If it is the developers plan to have Pioneer Irrigation District take over a pressurized irrigation system for the subdivision, it will be necessary that the pump site 1 e designed at the District's current point of delivery. Service to the subdivision from the pump site must have its own private delivery line from the delivery point to the subdivision. 5. A Maintenance Agreement must be written up and recorded at the expense of the Developer and/or owner. All Maintenance Agreements must be review.d by and approved by the District's Attorney, Scott Campbell, of Moffatt Thomas in noise, The least expensive way to have a Maintenance Agreement drawn up which meet the needs of the District is by having Mr. Campbell himself draw it up. Otherwise there will be two attorney fees for said developer and/or owner to pay. Mr. Campbell may be contacted at 345-2000. A deposit of$1000.00 must be paid to Moffatt Thomas to cover the attorney fees before the work can begin. Any unexpended portion of he deposit will be refunded. 6. Earl Mason and Stanfield must walk through the site and develop a puncl. list to be completed prior to recommending that Pioneer Irrigation District take over the pressurized irrigation system. If it is NOT the intent of the developer to request Pioneer Irrigation District to take over a pressurized irrigation system within their completed development, then the above six steps do not apply to their planned development. Any proposed development which will have downstream waterusers using gravity flow irrigation must develop their irrigation system in a manner which will insure the downstream wati.rusers the ability to acquire at least as much irrigation water for gravity flow irrigation as what they received prior to any development or construction taking place. The gravity flow irrigation system must be totally separate from the proposed pressurized irrigation system within a subdivision. 2 07'13'2003 10:17 FAX 4394491 PIONEER IRRIG 1ZI04iO4 NOTE: This letter does not authorize any construction to commence until all the necessary agreements with Pioneer Irrigation District have been executed and recorded. If you have any questions,please feel free to call. Sincerely, f/i/e, Mark F. Zirschkv Assistant Superintendent Cc: Scott Campbell -Moffatt, Thomas, Barrett, Rock&Fields via fax 385-5384 3 DATE: July 18,2003 TO: Steve Hasson,Community Development Director FROM: Douglas Brown,Assistant Chief/Fire Marshal SUBJECT: Comments for Caldwell Hearing Examiner July 30,2003 Meeting The Caldwell Fire Department(CFD) offers the following comments regarding the following case to come before the Caldwell Hearing Examiner on July 30,2003: Case No: SUP-190-03 Applicant: Lanny Berg Project: Duplex Location: 1405& 1407 Larch Street The Caldwell Fire Department has no objection to this duplex in a R-1 zone. Case No: SUB-91P-03 Applicant: Gunstream Commercial Real Estate Project: Rezone Location: SW comer of 215`Ave.and Chicago Street The CFD has no problems with this request. Any buildings or uses on this site will be subject to conditions and code compliance during any routine building permit plan review. Case No: SUP-191-03 Applicant: VW Investments Project: Manufactured home in a C-3 zoned area. Location: 2822 E.Linden Street The CFD has no problems with this request and has assigned an address for the use. 1 FA-2 Memorandum ------ F To Steve Hasson From Ben Weymouth, Assistant City Engineer JUL 21 2003 Re: Case No. SUP-190-03 Date: July 21, 2003 The Engineering Department does not appose the request by Lanny Berg for a special use permit approval of a duplex in an R-1 (Single Family Residential) zone. Applicant is currently connected to City sewer and water. Page 1 of 1 pA-3