DATE: October 15, 2003
TO: Steve Hasson, Community Development Director
FROM: Douglas Brown,Assistant Chief/Fire Marshal
SUBJECT: Comments for Caldwell Hearing Examiner
October 29, 2003 Meeting
The Caldwell Fire Department (CFD) offers the following comments regarding the following case
to come before the Caldwell Hearing Examiner on October 29, 2003:
Case No: SUP-197-03
Applicant: Caldwell First Christian Church
Project: Church complex
Location: SE corner of 10th and Linden
The Caldwell Fire Department has met with the Applicants and other city staff relating to this
project. The CFD has no objection to issuing a SUP for this project. Comments pertaining to
fire protection and life safety issues and conditions will be brought forth during the building
permit plan review process.
1
10/16/2003 08:01 FAX 43E4491 PIONEER IRRIG U01/02
- =-( Pioneer Irrigation District
f.a sax us • CALDWELL:CAHG 93606
s+cOTr 415,261T
Supgazardai
L11J cS + DrLBO:
MX z%sc> n Tcwarts
Ammo'
October 10,2003 76
City of Caldwell Community Development Services
Fax: 455.3050 I /
Ann: Jacqueline Hernandez
Re: Case No. SUP-197-03 (Caldwell First Christian Church)
TO WHOM IT MAY CONCERN:
Please be advised there is a delivery point in place for the property being proposed for development,
Pioneer Irrigation District's main concern is that all water rights within the District be honored, and
that access to irrigation water be provided to every parcel of land. The delivery point for said
property is headgates 1 lk 2— 10th St. Lateral.
All existing easements, right-of-ways, and other means used to honor the water rights to
downstream waterusers must be maintained and allowed to continue to exist. It is imperative that
no one disrupt the delivery of water to a downstream water user.
Any lateral, canal, drain or other means used to deliver water, along which there is a rig:tt-of-way
or easement, must have the same kept clear of all obstructions at all times. No fences, structures,
or other materials are allowed on any of the District's easements or right-of-ways AND they must
be recorded on the final plat. The 101 St. Lateral has a 20 foot prescriptive use easement.
Any discharge or run-off into a federal drain must meet the approval of Mr. John Caywc od of the
Bureau of Reclamation. Pioneer Irrigation District does not assume any responsibility fo:r such an
approval. His telephone number is 334-103. Attention: Dixie Drain (100 foot easement—50 ft
from center)
Any proposed development which will have downstream waterusers using gravity flow irrigation
must develop their irrigation system in a manner which will insure the downstream waterusers the
ability to acquire at least as much irrigation water for gravity flow irrigation as what they received
prior to any development or construction taking place. The gravity flow irrigation system must be
totally separate from the proposed pressurized irrigation system within ai,subdivision,
1
10/16/2003 09:01 FAX 4594491 PIONEER IRRIG 02i02
NOTE: This letter does not authorize any construction to commence until all the /necessary
agreements with Pioneer Irrigation District have been executed and recorded.
If you have any questions,please feel free to call.
Sincerely.
/4/61 /4.1.71.
Mark F. Zirsclhky
Assistant Superintendent
Cc: Scott Campbell - Moffatt, Thomas. Barrett, Rock& Fields via fax 385-5384
2
Memorandum
To: Steve Hasson
From: Ben Weymouth, Assistant City Engineer
Re: Case No. SUP-197-03
Date: October 20, 2003
The Engineering Department provides the following comments concerning a Special Use Permit request by
the Caldwell First Christian Church for approval of a new 26,000 sq. ft. facility with related uses and activities.
1. The current 33-foot one-half width right-of-way along Linden Street does not meet current City
standards. The applicant will be required to dedicate to the public an additional 7-foot of right-of-way to
meet the current City standards for a"Minor Arterial"which is 40-foot one-half width right-of-way.
2. The current 40-foot one-half width right-of-way along 10th Ave. is adequate and meets current City
standards.
3. The applicant will be required to dedicate to the public a 36-foot one-half width right-of-way along the
entire east boundary of the property for the extension of Ray Ave. The applicant will be required to
construct frontage improvements along their easterly boundary to the current City standards for a
Local/Residential road section plus an additional 8-foot of asphalt to allow for a two directional flow of
traffic. Construction of this roadway can occur as development phases are constructed. Portions of the
road that are not being developed will be required to have, at a minimum, improvements for an all
weather access road.
4. The existing improvements on both 10th Ave. and Linden Ave. meet current City requirements that
include curb, gutter, and sidewalk. The applicant will be required to repair/replace any frontage
improvements that are in disrepair or not functionally sound.
5. The applicant will be required to install some type of traffic mitigation, to be approved by the City, that
will detour traffic from using the northwest portion of the applicant's property as short-cut for traffic
traveling northbound on 10th Ave. wanting to proceed east on Linden Ave. The traffic mitigation can be
temporary until build-out of the proposed parking lot that is to occupy this portion of the property. Direct
access onto Linden Ave. adjacent to 10th Ave. will not be allowed.
6. An agreement was put in place with the property that allowed for five (5) driveway approaches onto 10th
Ave. when the dedication of the right-of-way along 10th Ave. was given by the property owners. The City
would ask that the applicant conform to the current City standards for access approach management
which require the applicant to meet the requirements set forth by Ada County Highway District
(A.C.H.D.) at a minimum. This is asked for by the City to prevent any public safety issues that might
occur from excessive driveway approaches onto an arterial roadway that is designed to handle large
amounts of traffic.
7. Both domestic water and sanitary sewer are available to the site. The City will require any future
development or expansion on this site be connected to City services. Connection fees will be assessed
as part of the building permit process.
8. Prior to commencement of construction in any dedicated right-of-way, the City Engineering staff is to be
notified. Appropriate City personnel are to be notified in advance of all required inspections.
Page 1 of 2
9. Provision is to be made for the disposal of stormwater drainage that may occur from the addition of
impervious surfaces in accordance with the City Stormwater Management Policy. A copy of this policy
is available upon request.
10. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation District sources.
City municipal water may be used if the criteria specified in the Landscape Ordinance Section 10-07-12
are met.
11. Appropriately licensed public works contractors shall perform all construction of dedicated facilities.
Page 2 of 2