HomeMy WebLinkAbout03 Public Agency PUBLIC AGENCY
ITEM DATE SUBMITTED BY
Fite De.par'{rntn
PA- I iYi rno /2 - 2L-°3 Doug l3 0 wr1
P4\--a NQ,,A.p t z.--t S- a 3 1Ai
S0u,-11,-001-- fr;c,4- f{tn lf'11
PA - 3 in e en 0 / - 2 -0 "1 Plan ley uy
3u,.Ldi 04iu -t
"y
?A 4/ alem,0 1- 5--04 Dar eL( alatte5
42.4 ti. 4- L, __
P Ps-' r\r1 e-AA6 o 4- V s c tc a rv,
Nip I - %- o4 ` t�
(YI erc,/ medico! Ccv,
PA- Memo - IS' U3 ITia l unh KtcSe.,
%;rte Da ar�tnrrif
PA-- S / - /0- o3 Do t over
Q5410
epA-9 Me kko fun
pp,-to e..0 o t01 z9 I(
DATE: December 26, 2003
TO: Steve Hasson, Community Development Director
FROM: Douglas Brown, Assistant Chief/Fire Marshal
SUBJECT: Comments for Caldwell Planning &Zoning Commission
January 14, 2004 Meeting
The Caldwell Fire Department (CFD) offers the following comments regarding the following cases to come
before the Caldwell Planning &Zoning Commission on January 14, 2004:
Case No: SUP-205-03
Applicant: Brenda Cameron
Project: Hope's Door
Location: 720 N. 16th Ave.
The CFD has met with Ms. Cameron and city staff and has no objections to the issuance of a SUP for this
project. For the record, though, it should be noted that during the Change of Use Permit process regarding
this facility, the CFD did issue a rather extensive number of conditions relating to fire protection and life
safety. All of the CFD's conditions noted in the CUP plan review convey to this SUP along with our
conditional approval of same as previously noted.
Case No: SUP-198-03
Applicant: Crestline, LC
Project: International Mini-Storage
Location: 6617 Cleveland Blvd.
The CFD has no objections to issuance of a SUP for this project and has met with the Applicant's and city
staff to learn about the project in general. This project began in 1998 and was reviewed by the CFD a
couple years ago when it was re-proposed. Comments, concessions and or conditions set forth by the
previous Fire Marshal, Mr. Joe Silva, are hereby rescinded pending a new plan review using the latest
plans for current code compliance.
A major concern regarding this project is that it fails to provide secondary access for emergency vehicles
due to the extreme"flag shape" and landlocked features of the property. The nature of the proposed use,
as a mini-storage facility, reduces the risk to human life somewhat versus the level of risk that would be
encountered at a development that is used primarily for habitation by persons. As just one means of
mitigation for the lack of secondary access, the CFD will recommend the use of an over-sized access
roadway to service this facility.
The CFD's specific conditions of approval will be later identified and submitted in a full plan review of this
project. Such plan review will include roadway and fire lane identification, fire hydrant locations, fire
separation/walls, building identification (numbering system), fire extinguisher locations, hazardous
materials storage prohibitions, gate access, etc.
Memorandum
To: Steve Hasson
From: Ben Weymouth, Assistant City Engineer
Re: Case No. SUP-205-03
Date: December 19, 2003
The Engineering Department provides the following comments concerning a Special Use Permit
request by Brenda Cameron for approval to allow a group home for women and children in an R-
3 (multiple-family high density residential) zone.
1. Right-of-way on 14th, 16th, and Elgin Street are adequate and meet current City
standards.
2. The existing infrastructure along 14th, 16th, and Elgin Street meets City standards.
3. Both domestic water and sanitary sewer are available to the site. The applicant will be
required to connect to City services if not already connected.
4. Any new construction will require that all traffic control for the project meet the
requirements of the Manual on Uniform Traffic Control Devices (M.U.T.C.D.) and the City
Engineer. The contractor shall provide a traffic control plan to the City Engineer for review
prior to any construction within the right-of-way.
5. Any new construction will require the applicant to comply with A.C.H.D. (Ada County
Highway District) access spacing and alignment requirements at a minimum.
6. Prior to commencement of construction in any dedicated right-of-way, the City Engineer
staff is to be notified. Appropriate City personnel are to be notified in advance of all
required inspections.
7. Provision is to be made for the disposal of stormwater drainage that may occur from the
addition of impervious surfaces in accordance with the City Stormwater Management
Policy. A copy of this policy is available upon request.
8. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation
District sources. City municipal water may be used if the criteria specified in the
Landscape Ordinance Section 10-07-12 are met.
9. Appropriately licensed public works contractors shall perform all construction of dedicated
facilities.
Debbie Geyer ��
From: Manley Guy[gmanley @phd3.state.id.us] f yr:, �j
Sent: Friday, January 02, 2004 12:53 PM .'f °�' t
To: dgeyer @ci.caldwell.id.us. �` JAN Cc: Gunderson Gene; Soltis Chris "CJ" t a i J '
Subject: Case No. SUP-205-03 Hope's Door ~2 ?Q04 '�/
Southwest District Health (SWDH) has no problem with the concept of Door. SWDH has
an interest in two units of the facility, the day F
care unit and the food service unit. Before the day care can be
approved, it will require an inspection from SWDH and will have to obtain a license and
pay the necessary fees. The food unit will probably need to obtain a permit from SWDH,
submit a plan of the facility, undergo a pre-opening and regular inspection and pay a
$65 license fee. . The business owners may contact CJ Soltis at 455-5404 for assistance
regarding the kitchen facilities and Guy Manley regarding the day care facility.
1
PA-3
Jacqueline Hernandez
From: Darrell Mayes
Sent: Monday, January 05, 2004 10:09 AM
To: Jacqueline Hernandez
Subject: Hopes Door
Hi Jacqueline,
I have been aware of this change in use to an existing building for some time now, in fact I have issued a permit
for the change in use that was signed off by P &Z; Fire; and engineering Depts. Although the proposed new use is very
similar to the existing or last use of the building the Fire and Building Depts. performed an inspection and have dicovered
some deficiencies.
We have gone over the deficiencies with the manager of Hopes Door and are confident that the necessary
corrections will be made in a timely manner, and prior to the issuance of the required Certificate of Occupancy.
Thank you,
Darrell Mayes
City of Caldwell Building Official
PA-LC
Message Page 1 of 1
Debbie Geyer
From: Ramirez, Victoria "Vicky" - Reg3 [RamirezV @idhw.state.id.us]
Sent: Thursday, January 08, 2004 9:15 AM
To: Debbie Geyer
Cc: Stuart, Brenda S. - Reg3
Subject: Re: Memo recieved on 12/15/03 for Brenda Cameron
In order to issue a regular daycare license the owner/operator must meet these requirements: Have a Fire and
Health inspection, Fingerprint Clearence and their Planning and Zoning.
Also, owners/operators must make sure that all their employees, helpers, and volunteers are finger printed and
pass FBI check.
The infonnation contained in this email may be privileged, confidential or otherwise protected from
disclosure. All persons are advised that they may face penalties under state and federal law for sharing
this information with unauthorized individuals. If you received this email in error, please reply to the
sender that you have received this information in error. Also,please delete this email after replying to
the sender.
1/8/2004
Steve Hasson
From: Bob Sobba
Sent: Thursday, January 08, 2004 8:40 AM
To: Steve Hasson
I talked toJackie this morning. She was called because no one could find a phone number for Brenda Cameron. She
stated she went there and that a water pipe had broke on the third floor. She stated there was considerable damage,part
of a ceiling has collapsed plus major destruction of the second and third floors and there was several inches of water
standing in the basement. She felt that the building is not being heated and that probaly caused a water pipe to freeze and
break.
1
4_ CATHOLIC HEALTH
INITIATIVES
Mercy
Medical Center
January 14, 2004 x
17A-N-172 004
City of Caldwell
Community Development Department
Planning and Zoning Commission
P.O. Box 1177
Caldwell, Idaho 83606
To Whom It May Concern:
I am writing to you to voice Mercy Medical Center's support for the rezoning of the
domestic violence shelter, "Hopes Door". As Mercy Medical Center works to meet the
health care needs of our community, we are made aware of the need for additional
shelters, especially when language barriers make accessing services more challenging. It
is our hope that this shelter will serve as a tool for victims to become empowered in order
to leave the cycle of violence and give their children hope for the future. Mercy Medical
Center supports Hopes Door and it's mission as a resource to victims and the community.
Sincerely,
Maryann Reese, Vice President - Patient Care/Operations
rTh
t� r
'ls
JAN 15 2004
A spirit of innovation,a legacy of care. 1512 12th Avenue Road Nampa, ID 83686
PA-1
Message Page 1 of 1
Debbie Geyer
From: Doug Brown
Sent: Monday, November 10, 2003 3:42 PM
To: Bruce Allcott; Jeremy Elliott; Albert Erickson; Arlyn Tietz; Ben Weymouth; Bob Sobba; Darrell
Mayes; Debbie Geyer; Garret Nancolas; Joan Johnson; Kelli Pollard; Steve Hasson; Susan Miller;
D Shift- Battalion Chief; A Shift- Battalion Chief; B Shift- Battalion Chief; C Shift - Battalion Chief
Cc: Doug Brown; Pat Cook; Mark Larson (mlarson @doi.state.id.us); Scott Buck (sbuck @doi.state.id.us)
Subject: Hope's Door Women's Shelter
There is an ongoing effort to open a battered women's shelter called Hope's Door at the old Odd Fellows
Retirement Home at 720 16th Ave. They have a building permit and have gone through a plan review by the fire
department. Numerous conditions were placed upon them. One of those conditions pertained to the old (circa
1977) automatic fire sprinkler system. We have required that they have a state licensed fire sprinkler company
"certify" that the system is in an operable and NFPA 13 compliant condition.
This morning I received a phone call from Mr. Larren Bailey at Viking Sprinkler Company. He said they have
been contacted about certifying the system at that facility. (This is a little odd because I had a phone call from
Shilo Sprinkler Co. a few weeks ago indicating they were looking at certifying the system.) Mr. Bailey indicated
that they (Viking) have"some issues" regarding the system. He itemized several concerns including: the system
was not connected to the fire alarm system (un-monitored), no water flow alarm bell, an inspectors test valve was
plugged and could not flow water, there is scale in the system, a bunch of sprinkler heads have been recalled and
must be replaced, etc. The thrust of Mr. Bailey's comments were that numerous expensive fixes were in order
before they would feel comfortable in certifying the system. (Possibly Shilo Sprinkler reached the same
conclusions and Hope's Door said no to the repairs?)
Since this project is on a constrained budget, this dilemma could jeopardize them receiving certification of the fire
sprinkler system. That would place the CFD in the position of denying them to open for business - unless, and
until, they fix the fire sprinkler system problems. Because this is a "good cause" project to serve the community, it
casts us (CFD) in the position of being the spoiler if we do not allow them to open. Since the city is already under
attack from a handful of dissidents who believe the city is too harsh on new businesses, this could be more
ammo for that camp.
I want to get this out in the open, ahead of any potential critical news articles slamming the CFD and the City for
not allowing a battered women's shelter to open its doors. This could get real messy.
I am waiting for a written report on what is wrong with the system from Viking Sprinkler. They, too, are concerned
about liability if they certify a marginal system. It is then my intention to call an administrative meeting with all
the stakeholders to identify the problems and discuss solutions. This would involve setting priorities and timelines
for compliance such that we MAY be able to phase in the some of the improvements to spread out the economic
impact on the project. However, I have reservations about doing that in this situation. Here is why . . .
The reality is that battered women's shelters are not a revenue producing venue. They need large and constant
infusions of donated funds and grant money to stay in business. Therefore they are often forced to seek out older
(but affordable) buildings, that may not be code compliant, in which to set up shop (as is the case here).
They often have very tight budgets with few funds for capital improvements and/or safety considerations. For the
record, I am very hesitant to approve phased improvements. Too often such facilities will
seek endless"extensions" in which to complete the safety work, because they usually don't have the money to do
the work. This places the City and the fire department in the difficult and very unpopular position of shutting down
the facility for non-compliance-AFTER they are allowed to"conditionally" open and operate. Can you imagine
the public outcry of putting dozens of battered women and their kids out on the street in the middle of winter???
I just wanted to give everyone a "heads up"on this situation which doesn't seem to be getting much better.
Thanks, Doug Brown
11/25/2003 PA-8
Message Page 1 of 2
Debbie Geyer
From: Doug Brown
Sent: Wednesday, April 14, 2004 7:56 AM
To: Debbie Geyer; Steve Hasson; Darrell Mayes
Cc: Jeremy Elliott; Mark Wendelsdorf
Subject: RE: Hope's Door- Progress Report
Re: Hope's Door facility
FYI - I have received a letter from a state licensed fire sprinkler contractor certifying the fire
sprinkler system - with a caveat that the sprinkler heads in the occupant rooms "should" be
upgraded to newer "quick response" heads, but we are not mandating that be done at this
time. This was one of the potentially high cost items they needed to provide. I also just
received the revised plans for the fire alarm system which are now waiting their second plan
review, to verify corrections and issue approval. This was the other high cost item they
needed to bring up to code. This will be expedited.
The last time I was out there (March 18) they still had not posted an address on the building. I
allowed Brenda to have people there on that date for about three hours for the Chamber's
After Hours function. I served as "fire watch" during that time. While I was there Brenda
related something to me about having to change their address, because the City (Mr. Hasson)
was requiring it. But when I asked Steve about this he said that was bogus. They have made
some progress but still have numerous items to finish.
I have concerns over their proposed fencing arrangement, especially the vehicle access
gates. The plans for this aspect keep changing, so I need to review what she finally submits
and will then comment accordingly.
Like Darrell, I'm just waiting to be asked to do a final inspection . . . whenever.
Thanks, Doug
Original Message
From: Debbie Geyer
Sent: Thursday, April 08, 2004 10:20 AM
To: Steve Hasson; Darrell Mayes; Doug Brown
Subject: Hope's Door - Progress Report
Just for your information . . .
MEMO
TO: Steve Hasson
Darrell Mayes
Doug Brown
FROM: Debbie
DATE: April 8, 2004
4/14/2004 •
Message Page 2 of 2
RE: Hope's Door
I asked Darrell today as to the status of the Hope's Door certificate of occupancy.
He stated that Brenda Cameron has yet to call in for a final inspection. He noted that she
is aware of the need for the final inspection and that she cannot open her doors to
business until this is handled.
I called Brenda Cameron to get an update on her progress. She stated they are working
to meet the conditions as stated in the Order of Decision. She asked if they needed a
building permit to install a fence on the site. I stated that they will not need a building
permit, however, we would like to see a diagram as to the location of the fence before
installation. She confirmed that she would bring in such a diagram.
She stated that her proposed date for completion of the conditions would be
approximately mid-May and she would then contact the Building Department for an
inspection.
I asked her to keep us posted.
4/14/2004
Message - Page 1 of 1
Debbie Geyer
From: Doug Brown
Sent: Tuesday, June 29, 2004 12:16 PM
To: Debbie Geyer; Darrell Mayes; Arlyn Tietz
Cc: Garret Nancolas; Mark Wendelsdorf
Subject: RE: Hope's Door Inspection
FYI - I conducted a final inspection for Brenda Cameron at Hope's Door this morning. They passed everything
on their list, that is until we got down to the last item - backup power supply to the exit lights and emergency area
lighting. First, what was labeled as main breaker did not shut off the power. After tripping a half a dozen switches
the power finally shut off. (They have been advised to fix this and clearly label "which" switch really is the main
breaker for their building).
With the power off it was discovered that none of the illuminated exit signs had battery back-up power to them.
Also, over 80% of the battery back-up emergency area light units failed to operate. It is possible this may be
attributable to recent storm-induced power outages that may have drawn down the old batteries, to a point where
they could not be recharged. These lighting problems are serious life safety issues and must be corrected to get
CFD approval on their C of O. Brenda is aware of this and is working to fix the problem.
I also inspected their new fence line, per Darrell's request (and P&Z's issue), which has been installed along both
the canal and around the play area. They had a couple of problems on the ends of the fence where the
fencing transitions back onto their property, but they are working on fixing those. I also told them they should
clear the foot-tall dead grass from both sides of their fence line so an errant bottlerocket on the 4th doesn't burn
up their new wood fence.
I've told Brenda to call me back as soon as they have the lights working properly. Dan Romero of their Board of
Directors accompanied Brenda and I on the inspection.
Thanks, Doug
Original Message
From: Debbie Geyer
Sent: Monday, June 28, 2004 1:22 PM
To: Darrell Mayes; Arlyn Tietz; Doug Brown
Subject: Hope's Door Inspection
Brenda Cameron called in to the Building Department for an inspection on the building. I understand that
they have an open house scheduled for next week and would like to secure the C of 0 prior to this date.
In talking with Brenda, she stated that the Fire Marshall is scheduled to inspect the property on Tuesday,
June 29, at 9:00 a.m. Is it possible that the Building Department could inspect at the same time?
The only issue that the P&Z Department would have is the fence. I previously gave this information to
Darrell concerning the location of the fence (they have installed it already).
Thank you for your help.
Debbie
6/29/2004 \.N-l 0
Message Page 1 of 1
Joan Johnson
From: Doug Brown
Sent: Thursday, September 09, 2004 4:08 PM
To: D Shift - Battalion Chief; A Shift - Battalion Chief; B Shift - Battalion Chief; C Shift - Battalion
Chief; Jeremy Elliott (jelliott @ci.caldwell.id.us); Pat Cook; Doug Brown; Mark Wendelsdorf
Cc: Ben Weymouth; Bob Sobba; Darrell Mayes; Garret Nancolas; Debbie Geyer; Joan Johnson;
Lisa Wiggins; Scott Woods; Steve Hasson; Susan Miller
Subject: Hope's Door Shelter
Importance: High
HEADS UPI!!
As some of you may already be aware, there is a potential problem arising regarding the
Hope's Door Shelter at 720 N. 16th Avenue.
The CFD has been contacted by Mountain Alarm Company advising us that Hope's Door has
failed to make a sizeable payment for the fire alarm system work they performed in order
for Hope's Door to open a couple of months ago. Mountain Alarm advised us that they have
contacted Ms. Brenda Cameron at Hope's Door and that they intend to remove their alarm
equipment from that facility next Tuesday, Sept. 14 if the bill is not settled. According to
Mountain Alarm this is apparently after numerous attempts by them to secure payment and
assurances from Ms. Cameron that the bill would be paid. That is Mountain Alarm's side of the
story, I have yet to discuss this with Ms. Cameron, though I have heard from a Board Member
of Hope's Door that this is a matter of civil litigation between Hope's Door and Mountain Alarm
over billing. Attorneys are involved and legal remedies will no doubt eventually be
forthcoming.
However, if the fire alarm system equipment is removed or the system rendered inoperative,
then Hope's Door would no longer be in compliance with the CFD's conditions of approval for
that facility and would be in violation of Caldwell Municipal Code, Section 8-13, which adopts
the International Fire Code statutes pertaining to fire alarm system requirements.
I am hopeful that this matter will be resolved before next Tuesday. However, if it is not, it
potentially places us as a fire department (and a city) in the unenviable position of closing
down a shelter for abused spouses and their children. For now we are just monitoring the
situation.
I will pass on any additional information as it becomes available.
Thanks, Doug