City of Caldwell Community Development Department / 1 i iJ,QN _5 2o0 sP
Fax: 455-3050 44
Aetn; Jacqueline Hernandez
f
Re: Case No. SUP-204-03 {James R. Wiley)
TO WHOM IT MAY CONCERN:
Please be advised there is a delivery point in place for the property being proposed for development.
Pioneer Irrigation District's main concern is that all water rights within the District be honored, and
that access to irrigation water be provided to every parcel of land. Delivery point for said property
i$ gate 41 -Hiline Canal.
All existing easements, right-of-ways, and other means used to honor the water rights to
downstream wateruters must be maintained and allowed to continue to exist. It is imperative that
no one disrupt the delivery of water to a downstream water user_
Any lateral_ canal, drain or other means used to deliver water, along which there is a rit ht-of-way
or easement, must have the same kept clear of all obstructions at all times. No fences, structures.
or other materials are allowed on any of the District's easements or right-of-ways AND they must
be recorded on the final plat.
Any discharge or run-off into a federal drain must meet the approval of Mr. John Caywood of the
Bureau of Reclamation. Pioneer Irrigation District does not assume any responsibility for such an
approval, His telephone number is 334-1463. Attention: (100 foot easement—50 ft from center)
Please be advised that in order to satisfy the City of Caldwell and Canyon County requirements and
IF it is the intent of the developer to put in a pressurized irrigation system and have Pioneer take
over said system once the development is completed,the following steps are necessary;
1
•
PA A
01/05/2004 12:56 FAX 4594491 PIONEER IRRIG 1!02/03
1, Said system must be put in according to the current Standards and Specifications of
Pioneer Irrigation District.
2. A Construction, Operation and Maintenance Agreement must be written up and
recorded at the expense of the Developer and/or owner. All agreements must be
reviewed by and approved by the District's Attorney, Scott Campbell, o f Moffatt
Thomas in Boise. The least expensive way to have an agreement drawn up which meets
the needs of the District is by having Mr. Campbell himself draw it up. Other.vise there
will be two attorney fees for said developer and/or owner to pay. Mr. Campbell may be
contacted at 345-2000. A deposit of 51000.00 must be paid to Moffatt Thomas to cover
the attorney fees before the work can begin. Any unexpended portion of the deposit
will be refunded. Pioneer Irrigation District will recommend disapproval of final plat
approval until the necessary agreement has been executed and recorded.
3. The engineering fees will be the responsibility of the developer and/or owner, and a
deposit must be paid in advance to Pioneer Irrigation District before the District will
authorize Earl Mason & Stanfield to review engineering plans. Plans must be received
by Pioneer Irrigation District by December 15th 2004. All construction which may
impact district facilities must be completed prior to the March 15`h 2005 deadline.
The construction time-frame which Pioneer allows is November 1M of the current
year to March 15tei of the following year. Estimated costs for the District's
engineering fees are $500 plus S5.00 per lot. If that amount fails to cover the costs
involved due to the necessity to revise plat maps, etc., additional costs will
be billed out and paid prior to the District's signing off on the final plat.
4 If it is the developers plan to have Pioneer Irrigation District take over a pressurized
irrigation system for the subdivision, it will he necessary that the pump site be designed
at the District's current point of delivery. Service to the subdivision from the pump site
must have its own private delivery line from the delivery point to the subdivision.
5. The developer must contact the office of Earl Mason & Stanfield to make arrangements
for on-site inspections to be made at various points of construction. An engineer from
Earl Mason & Stanfield must be involved in the inspections as they are the engineers
for Pioneer Irrigation District and are familiar with the requirements. of Pioneer.
6. Earl Mason and Stanfield must walk through the site and develop a punch list to be
completed prior to recommending that Pioneer Irrigation District take over the
pressurized irrigation system.
If it is NOT the intent of the developer to request Pioneer Irrigation District to take over a
pressurized irrigation system within their completed development, then the above six steps do not
apply to their planned development.
Any proposed development which will have downstream waterusers using gravity flow irrigation
must develop their irrigation system in a manner which will insure the downstream watcrusers the
2
01/05/2004 12:56 FAX 4584481 PIONEER IRRIG 1200;03
ability to acquire at least as much irrigation water for gravity flow irrigation as what they received
prior to any development or construction taking place. The gravity flow irrigation system must be
totally separate from the proposed pressurized irrigation system within a subdivision,
NOTE: This letter dries not authorize any construction to commence until all the necessary
agreements with Pioneer Irrigation District have been executed and recorded.
If you have any questions, please feel free to call.
Sincerely,
(V(eA/1 ..e-7
eib
Mark F. Zirschky
Assistant Superintendent
Cc: Scott Campbell - Moffatt, Thomas, Barrett, Rock& Fields via fax 38$-5384
. 0.11. 14- u e/. y.-e4 eta...Ate«. #i 4.,.'• ,r.r.. 4,rt , g6 rz
3
DATE: January 9, 2004
id JAN _ _..1
TO: Steve Hasson, Community Development Directo
_;-yam
FROM: Douglas Brown,Assistant Chief/Fire Marshal
SUBJECT: Comments for Caldwell Hearing Examiner
January 28,2004 Meeting
The Caldwell Fire Department (CFD) offers the following comments regarding the following case to
come before the Caldwell Hearing Examiner on January 28, 2004:
Case No: SUP-204-03
Applicant: I.D.A.H.O./Fred Comforth
Project: Charmae Springs Subdivision
Location: N. of Laster Street and War Eagle
The Caldwell Fire Department has already conditionally approved the Charmae Springs
Subdivision on its plan review dated April 24, 2003. It does not appear that this action will
impact that upon which we have already commented.
We would like to point out that prior to construction of Phase II of the Charmae Springs project
that Laster Street will have to be improved from War Eagle Road, westerly to Ann Marie Avenue
in order to provide approved secondary access to Phase II. We would also take advantage of this
improvement to effect a name change for that portion of Laster Lane to Laster Street, from
Cleveland Blvd. westerly to War Eagle. That roadway was legitimately named Laster Lane as a
county roadway, however, since that roadway is now within the Caldwell city limits, this would
be a good opportunity to make the changeover.
1
Memorandum
To: Debbie Geyer
From: Ben Weymouth,Assistant City Engineer
Re: Case No. SUP-204-03
Date: January 15, 2004
The Engineering Department offers no comment regarding the Special Use Permit request by
Fred Cornforth for approval of the residential homes (SFR) on a C-3 stranded portion of the Wiley
property. Engineering staff has provided comments associated with the Preliminary Plat for this
property and ask that those comments remain in-place as applicable. A copy of the comments is
attached.
PA-3
Memorandum
To: Steven Hasson
From: Ben Weymouth, Assistant City Engineer ki(1/
Re: SUB-86P-03, Charmae Springs Subdivision
Date: March 20, 2003
The Engineering Department provides the following comments on the above referenced
preliminary plat(additional comments have been made on attached copy of preliminary plat):
1. Development Plans— Prior to commencing construction. plans must be prepared by the
developer's engineer and approved by the City Engineering Department which include the
following items:
a. Street section and alignment (including curb and gutter);
b. Sidewalk (5-foot width on border streets (collector/arterial) and 4-foot width on interior
streets);
c. Sanitary sewer(per City and DEQ requirements);
d. Potable water(per City and DEQ requirements);
e. Stormwater facilities (per City Policy);
f. Street lighting (at intersections and maximum spacing of 350 feet and must meet Idaho
Power design standards plus conform identically to the lamp, ballast, and sensor switching
equipment used by Idaho Power);
g. Street signage (per City and MUTCD requirements);
h. Irrigation system (per applicable Irrigation District requirements).
2. The developer is to employ a responsible design professional, preferably the engineer of
record, to oversee and inspect construction, to perform and/or observe all requisite testing of
completed facilities, and to certify that improvements have been constructed according to
approved plans and in compliance with applicable City, State, and Federal standards.
3. Prior to commencement of construction in any dedicated right-of-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified. This preferably will take place in a pre-construction
conference scheduled by the engineer of record in which all appropriate personnel and utilities
are present. Appropriate City personnel are to be notified in advance of all testing (including
compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of
the testing. The engineer of record or his designated representative is to witness all tests and a
Page 1 of 5
log of inspection visits and testing results is to be kept by the engineer of record or his
representative.
4. As noted previously, provision is to be made for the disposal of stormwater drainage in
accordance with the City Stormwater Management Policy. A copy of this policy is available
upon request. The engineer of record is to provide calculations, which indicate that the
assumptions in his stormwater drainage plan comply with the requirements of the stormwater
policy. For any off-site discharge, written approval from the agency responsible for the receiving
water body is required before final plat approval.
5. During the design phase of this project, the developer or his engineer is to contact Pioneer
Irrigation District, Black Canyon Irrigation District and Bureau of Reclamation to ascertain all
existing upstream drainage rights and downstream irrigation rights that need to be maintained
across the property. Appropriate facilities shall be provided to convey irrigation and drainage
water across the property to take care of these offsite needs. There is to be no discharge of
irrigation return water into the subdivision storm water system. A letter is to be obtained from
applicable Irrigation District indicating their concurrence with the design and facilities that
preserve these existing rights.
6. The development is to include a non-potable water pressure irrigation system. The design of
this pressure irrigation system is to be reviewed and approved by Pioneer Irrigation District and
a letter obtained indicating their approval of the design. This letter of approval must be
completed and submitted to the City before final plat approval. This requirement presumes that
the system will be operated and maintained by Pioneer Irrigation District.
7. The Preliminary Plat shows the Notus Canal adjacent to the northern boundary of the proposed
development, the High Line Canal bisecting the property in an east to west direction and the
Moses Drain adjacent to Caldwell Blvd. The appropriate easements and/or right-of-ways for
the drain, lateral and any other irrigation facility shall be determined and clearly indicated on the
construction plans and on the final plat. Construction across or re-routing of these facilities is
subject to approval by all applicable Irrigation Districts.
8. Rights-of-way for the interior streets shown on the Preliminary Plat are consistent with City
Standards that apply for Planned Unit Developments, which is a minimum 51-foot full width
right-of-way. Laster Lane (major collector) should have a minimum one-half right-of-way width
of 30- feet. A note shall be placed on the Final Plat indicating that all rights-of-way are to be
dedicated to the public.
9. Any portions of adjacent street right-of-way not in the proposed subdivision and owned by the
developer shall be deeded to the City.
10. The easements listed on the preliminary plat appear to comply with the subdivision ordinance.
There are some additional easements that will be required before final plat approval.
1) All common lots need to show easements.
2) The city will require a 30-foot utility easement for utilities located in Sagewood
Lane.
3) There will need to be an easement shown for any off-site utilities to be
constructed or that have already been constructed.
4) An easement will need to be shown for the Moses Drain.
Page 2 of 5
11. If not already complete, the existing easement for the Low Line Canal will need to be vacated
and a new easement will need to be provided for the re-alignment of the canal adjacent to
Laster Lane.
12. All street, sewer, water, fire protection, and street light facilities must be dedicated to the City.
Some conveyance facilities for stormwater drainage may be eligible for dedication to the City.
13. Construction of dedicated facilities is to be performed by an appropriately licensed public works
contractor.
14. Prior to approval of the final plat, subdivision facilities must be completed or an appropriate
construction security provided. There may be temporary restrictions to the obtaining of building
permits, even with acceptable construction security, depending on fire protection, emergency
service requirements, and City approval of the sanitary sewer system. All facility construction
must be complete before occupancy will be allowed in any residence.
15. Upon recordation of the plat, the Engineering Department is to be provided with a reproducible
Mylar copy of said document, suitable for blue line reproduction.
16. In accordance with the City requirements, a note is to be placed on the Final Plat indicating that
no residential lot within the subdivision is to take direct access to Laster Lane.
17. The location of sewer and water service, including sizing of mains, providing of easements,
frontage construction, and offsite construction are to be decided during review of improvement
plans. The site will be required to comply with the Southeast Trunk Sewer Study and the Water
Master Study. Existing water and sewer facilities are adjacent to the site in Caldwell Blvd.
18. The preliminary plat drawing indicates that stormwater detention/retention basins are to be
placed in common lots in accordance with the referenced Stormwater policy. A note should be
placed on the final plat indicating that all areas designated as common areas are to be
operated and maintained by the homeowners association.
19. In accordance with City Code, street side improvements are required in any public right-of-way
adjacent to the subject property including Laster Lane. Improvements are to include curb and
gutter, sidewalk, paving (half width plus 7.5-feet), streetlights (if not already present) and sewer
and water mains.
20. All utilities that are to be constructed and dedicated to the City shall be placed within the
required right-of-way per City standards (i.e. sewer on centerline, water on the south or west of
the centerline).
21. All utilities not located in a public right-of-way shall be placed within an easement to be
dedicated to the City.
22. All angle points and sewer mainline dead ends will require a manhole to be constructed per
City standards.
23. Water mains need to be extended from Ann Marie Ave. & Leanne Ave. to Laster Lane. Exact
locations for water mains will be reviewed during the plan approval process.
Page 3 of 5
24. All water mainlines within public streets shall have fittings and valves to allow for isolation and
maintenance per City water standards.
25. Any streets intersecting Laster Lane will be required to comply with A.C.H.D. intersection
spacing standards at a minimum.
26. Preliminary Plat will need to show existing site conditions in the form of a topographical survey
that includes existing contour elevations.
27. Preliminary Plat needs to have all applicable line and curve data available for reference in the
form of a curve/line table or another acceptable form.
28. All lots shall be serviced with sanitary sewer and domestic water per city standards.
In addition to the comments listed above, the Engineering Department provides the following
supplemental comments on the above referenced preliminary plat in regards to the retrofit that is
required on the portion of this subdivision that was previously constructed as part of Windstone
Estates:
29. A right-of-way for existing access road from subdivision boundary to Caldwell Blvd shall be
provided.
30. All existing 4-inch sewer service lines not used in the new subdivision layout shall to be
removed from the site and capped at the main line.
31. New 4-inch sewer service lines to each lot will be required and shall be constructed in
accordance with City standards and the ISPWC.
32. All sewer mainlines will need to be tested and televised after reconstruction is complete.
33. All water mains will change from private to public and shall be dedicated to the City of Caldwell.
34. All existing water services will need to be removed and capped at the main line. All new
services will need to be installed per City Water Department standards and the ISPWC.
35. The City prior to backfilling must inspect all taps to the water main line. This is to allow
inspection of the main line.
36. Verify that all water mains at intersections have proper valving per City Water Department and
the ISPWC.
37. The existing 8-inch master meter, backflow preventer and concrete vaults will need to be
removed and a new continuous water main shall be constructed.
38. Install temporary or permanent blow-offs at the phase lines of all streets, dead end streets and
water stubs.
39. Re-testing, chlorinating, flushing and sampling of all water mains after reconstruction is
completed shall be required.
Page 4 of 5
40. All existing storm drain structures will need to be pumped out and cleaned after reconstruction
is completed.
41. Temporary storm water retention at phase lines for streets, where necessary, shall be required
during construction.
42. In accordance with City Code, street side improvements are required in any public right-of-way
adjacent to the subject property. Improvements are to include curb and gutter, sidewalk,
paving (to match existing), streetlights (if not already present) and sewer and water mains.
43. Ensure that all existing storm drain facilities are sized to handle flow in accordance with the City
Stormwater Management Policy.
44. All curb, gutter and sidewalk shall to be constructed in accordance with City standards and the
ISPWC.
45. All existing concrete that is in disrepair will need to be repaired or replaced before acceptance
by the City will take place.
46. Development shall construct Leanne Ave. to Laster Lane with the reconstruction of Phase 1 to
provide for secondary access to site.
47. All required frontage improvements should be done in accordance with City standards and the
ISPWC.
48. All existing streets shall meet City standards and the ISPWC. Compaction re-testing of both
the road base and asphalt will be required on all existing streets.
49. After the final plat is filed, developer shall warranty all new and existing facilities for a period of
one year.
50. The City, prior to any acceptance taking place, will require verification that all existing
streetlights are functional.
51. Applicant shall ensure that all existing irrigation facilities were constructed in accordance with
all applicable irrigation districts.
52. Prior to approval of the final plat, subdivision facilities must be completed or an appropriate
construction security provided. There may be temporary restrictions to the obtaining of building
permits, even with acceptable construction security, depending on fire protection, emergency
service requirements, and City approval of the sanitary sewer system. All facility construction
shall be complete before occupancy will be allowed in any residence.