HomeMy WebLinkAbout03 Public Agency [ PUBLIC AGENCY ,
- ITEM DATE SUBMITTED BY
Win- 2 iv-lo c nL) lc)- g- 04 -
y a�. CLk Y
Memorandum
To: Steve Hasson
From: Ben Weymouth, Assistant City Engineer a'
Re: Case No. SUP-216-04
Date: May 25, 2004
The Engineering Department provides the following comments concerning a Special Use Permit
request by Thomas Jefferson Charter School for approval to allow four(4) temporary modular
class rooms.
1. The applicant will be required to bring all existing frontage improvements up to current
City standards. Frontage improvements are to include sidewalk along all public right-of-
way adjacent to the applicant's property.
2. Both domestic water and sanitary sewer are available to the site. The applicant will be
required to connect to City services. Fees will be assessed with the Building Permit
Application.
3. All traffic control for the project shall meet the requirements of the Manual on Uniform
Traffic Control Devices (M.U.T.C.D.) and the City Engineer. The contractor shall provide
a traffic control plan to the City Engineer for review prior to any construction within the
right-of-way.
4. The applicant will be required to comply with A.C.H.D. (Ada County Highway District)
access spacing and alignment requirements at a minimum. All spacing and alignment will
be reviewed with the building permit application.
5. Prior to commencement of construction in any dedicated right-of-way, the City Engineer
staff is to be notified. Appropriate City personnel are to be notified in advance of all
required inspections.
6. Provision is to be made for the disposal of stormwater drainage that may occur from the
addition of impervious surfaces in accordance with the City Stormwater Management
Policy. A copy of this policy is available upon request.
7. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation
District sources. City municipal water may be used if the criteria specified in the
Landscape Ordinance Section 10-07-12 are met.
8. Appropriately licensed public works contractors shall perform all construction of dedicated
facilities.
Message Page 1 of 1
Debbie Geyer
From: Doug Brown
Sent: Tuesday, June 08, 2004 7:18 AM
To: Debbie Geyer
Cc: Dave Marston; Darrell Mayes; Ben Weymouth; Scott Woods; Tim King; Pat Cook; Doug Brown
Subject: RE: Written Comments - SUP-216-04 -- Thomas Jefferson Charter School
Debbie - I met with the principles at an impromptu "roundtable" session last week to go over TJCS. CFD
concerns are as follows:
1. Access. Public roadway on north side is good. We need to ensure the N-S driveway on the west side will be
built and that turnaround space and corner radii in the parking lot meet CFD standards (20'wide, all-weather
surface, 28' inside, 48' outside).
2. Water system upgrades and hydrant locations will be addressed at plan review. In addition to the already
plotted hydrants on Adam-Smith Way, we will require at least one new hydrant on the SW side of the facility
(probably along the N-S driveway). Exact location TBD on building plan review.
3. Dave Marston will be able to produce an address for this facility. It will be located on Adam-Smith Street.
4. It is pretty much a known factor that this facility will be equipped with built-in fire protection including an
automatic fire sprinkler system and a full fire alarm system.
5. Fire protection concerns will be specifically called out and conditioned during the building permit plan review
process. (Since this is a school it will be subject to State DBS plan review, too.)
6. I still have some reservations about this facility being the same name as another school in Caldwell (Thomas
Jefferson Charter School vs. Jefferson Junior High School). However, this pretty much looks like its is a done
deal from the folks involved. We'll just have to hope for the best.
Thanks. Doug
Original Message
From: Debbie Geyer
Sent: Monday, June 07, 2004 3:56 PM
To: Pat Cook; Doug Brown
Subject: Written Comments - SUP-216-04 -- Thomas Jefferson Charter School
Importance: High
Pat or Doug:
I am missing comments on this case. Docket goes out on Wednesday a.m.
Thanks!
Debbie
6/18/2004 Z___