Loading...
HomeMy WebLinkAbout03 Public Agency PUBLIC AGENCY ITEM DATE SUBMITTED BY PiPt Debbie Geyer From: Doug Brown Sent: Friday, June 11, 2004 2:37 PM To: Joan Johnson Cc: Jeremy Elliott; Mark Wendelsdorf; Ben Weymouth; Darrell Mayes; Jacqueline Hernandez; Debbie Geyer; Steve Hasson; Doug Brown Subject: RE: staff reports for your review Joan - 1.) I don't think we need to comment on Sallie Palleria's apartments on Ohio Ave. until the building permit plan review process. However, as a head's up, by the end of the year Darrell and I will be adopting the 2003 International Building and Fire Codes. Those codes will require automatic residential fire sprinkler systems in all residential occupancies with three of more units (we are presently at six or more). That will have a direct impact on future 3 and 4 plexes. Incidentally, the staff report shows a date of November 7, 2004 for our comments on this place -that hasn't quite happened yet. Watch out Sallie! 2.) Our comments for Ponderosa Subdivision are already included in the staff report-so unless they've changed a bunch of stuff, we should be good on that one. Thanks, Doug Original Message From: Joan Johnson Sent: Friday,June 11, 2004 12:56 PM To: Ben Weymouth; Scott Woods; Doug Brown Subject: staff reports for your review from SH- enjoy- (drafts only, awaiting the old wise ones comments, of course) :-) J « File: SUP21704.DOC » « File: SUB105PO4 &ANN9004.doc » ALSO FYI- oasis worship center- church, food dispensary, shelter formally withdrew their application for special use permit today, do not prepare any comments for them in addition - Montecito Park#1 final plat requested to be moved from the 7/6 date originally scheduled and will be on the council agenda for 7/19 this gives 2 additional weeks for your comments please note that on your memo request from jackie thanks old wise ones J :-) 1 Memorandum °� f To: Steve Hasson + ... From: Ben Weymouth, Assistant City Engineer JUN 17 2004 1.E Re: Case No. SUP-217-04 Date: June 15, 2004 The Engineering Department provides the following comments concerning a Special Use Permit request by Craig Bradshaw to enlarge a duplex to a 4-plex. The subject property is located at 3119 Ohio Ave. 1. Existing frontage improvements along Ohio Ave are in compliance with current City of Caldwell standards. 2. Both domestic water and sanitary sewer are available to the site. The applicant will be required to connect to City services if not already connected. Additional connection fees (if applicable)will be assessed with the Building Permit Application. 3. The applicant will be required to comply with A.C.H.D. (Ada County Highway District) access spacing and alignment requirements at a minimum. 4. All traffic control for the project shall meet the requirements of the Manual on Uniform Traffic Control Devices (M.U.T.C.D.) and the City Engineer. The contractor shall provide a traffic control plan to the City Engineer for review prior to any construction within the right-of-way. 5. Prior to commencement of construction in any dedicated right-of-way, the City Engineer staff is to be notified. Appropriate City personnel are to be notified in advance of all required inspections. 6. Provision is to be made for the disposal of stormwater drainage that may occur from the addition of impervious surfaces in accordance with the City Stormwater Management Policy. A copy of this policy is available upon request. 7. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation District sources. City municipal water may be used if the criteria specified in the Landscape Ordinance Section 10-07-12 are met. 8. Appropriately licensed public works contractors shall perform all construction of dedicated facilities. 9. A pre-construction conference shall be held a minimum of three (3) working days prior to the start of construction. The applicants Engineer shall coordinate the pre-construction conference and all applicable parties involved shall be invited. The applicants Engineer shall provide"approved for construction" plans to all parties at the time of the pre- construction conference.