Loading...
HomeMy WebLinkAbout05 Hearing Examiner PLANNING AND ZONING pea ri k ITEM DATE SUBMIT"1`BD BY PUBLIC HEARING COMMENT SHEET (PLEASE PRINT CLEARLY) NAME: STREET ADDRESS: C - 37-1-/ • c✓/ �� CITY/STATE/ZIP: Ai /VA (/9 NAME OF CASE BEING HEARD: 4(-(p- 220 ' O eaea *****A A A A A AA AAA**************AAAAAA****************************************:F*************** Check the appropriate line: Applicant or Representative I Neutral/ wish to speak do not wish to speak In favor/. I Opposed/ wish to speak I wish to speak do not wish to speak I do not wish to speak Written comments may be attached to this form or you may write them in below. PUBLIC HEARING COMMEN T SHEET (PLEASE PRINT CLEARLY) NAME: kAAA-- ,.J E 1���"(_ /��t� 0YoAe Cod- ft( STREET ADDRESS: i 2 Al CITY/STATE/ZIP: C _` �,,� ; i �3 C d NAME OF CASE BEING HEARD: U -- *****AAA A A kAAAA AAAA:.AAA*******I. A.A**********AA AAA***i:*AAAAAAA AAA A******AAAA*A Al.AA******* Check the appropriate line: • •pficant of Representative ! 1 Neutral/ wish to speak 1 do not wish to speak In favor/. I Opposed/ wish to speak 1 wish to speak do not wish to speak I do not wish to speak Written comments may be attached to this form or you may write them in below. • CANYON COUNTY CRIME LAB ADDITION CASE NUMBER SUP- 228-04 Order of Decision BEFORE THE HEARING EXAMINER CITY OF CALDWELL, IDAHO NOVEMBER 23 2004 The applicant is advised that the City of Caldwell is obliged to conduct a regulatory takings analysis whenever requested by a property owner whose real property is subject to a government action, in the instance where the applicant's proposal is denied or they disagree with a condition of approval; the property owner must make a written request for the analysis within 28 days of the final decision of the government entity. For information regarding the takings analysis - see Regulatory Takings Act, Title 67 Chapter 80, Idaho Code A SPECIAL USE PERMIT FOR CANYON COUNTY TO EXPAND ITS LAW AND JUSTICE CAPABILITIES BY BUILDING AN ADDITION ONTO ITS CRIME LAB BUILDING A SPECIAL USE PERMIT TO PLACE A PROFESSIONAL OFFICE IN AN R-3 ZONE TABLE OF CONTENTS: I COURSE OF PROCEEDINGS, II GENERAL FACTS, III TESTIMONY, IV APPLICABLE LEGAL STANDARDS, V COMPREHENSIVE PLAN ANALYSIS ON SUP-228-04, VI FINDINGS OF FACT ON SUP-228-04, VII CONCLUSIONS OF LAW ON SUP-228-04, VIII ORDER OF DECISION ON SUP-228-04. I COURSE OF PROCEEDINGS: 1.1 On November 5, 2004, the Caldwell Community Development Department issued a notice of public hearing on Case Number SUP-228-04 to all property owners within 300 feet of the project site and to all to all political subdivisions providing services to the City of Caldwell; on November 8, 2004 notice was published in the Idaho Press Tribune, and, on November 15, 2004, notice was posted on the site, thus satisfying the public notice requirements set forth in Idaho Code, Chapter 65, Local Planning Act. The public hearing will be held before the Caldwell Hearing Examiner on November 23, 2004. 1.2 Files and exhibits relative to this application will be available for review in the Community Development Department, Caldwell City Hall, as well as all public hearings. II GENERAL FACTS 2.1 OWNER: Canyon County Board of Commissioners, 1115 Albany Street, Caldwell, Idaho 83605 2.2 APPLICANT: Andy Eveland, Canyon County Maintenance Supervisor, 1115 Albany Street Caldwell, Idaho 83605. 2.3 APPLICANT'S REPRESENTATIVE: Rick Bugatsch, Huston-Bugatsch Architects, Chartered, 217 W. Georgia, Suite 120, Nampa, ID 83686. Page 1 of 7 Public Hearing of November 23,2004 " D q/1 ' 2.4 REQUEST: A request-by Canyon County to expand their law and justice capabilities by adding an addition onto the existing crime lab. (See A-2 — Narrative) Land use action: Any time a government enterprise creates a new or expanded land use it is subject to a special use under the land use table category "public" which requires a special use in every land use zone. The County is intending to expand their crime lab operation by the installation of a new building adjoining the old one. Therefore they will need a special use permit to accomplish that task. The new crime lab building will be built on land that has two zones (R-3 and C-2). A crime lab falls under the land use category of professional office. This type of land use is allowed in an R- 3 zone by way of a special use permit. Accordingly, this land use application will require the approval of a second land use permit. (See A-3 — Site Plan) Overview: Canyon County owns considerable property around the Courthouse that it has acquired as part of a long-term development strategy to address the need to provide an ever- increasing array of public services. Among the property the County owns is a land parcel (RO5021) located directly west of the Canyon County Courthouse and generally bounded by Belmont street to the north, 11th avenue to the east, parcel RO5030 to the west and the public alleyway that lies between Belmont and Albany Street on the south. Effectively, the County owns Lots 13-22, Block 63 or the northwest corner of 11th & Belmont (minus the two lots where the Sinsations business enterprise is located). The land parcel is .69 of an acre in size (120'x 250') and contains a crime lab building that is 40' x 40' (1600 square feet). The proposal is to add a new addition to this existing building that is 40'x 60' in size to increase the County's crime lab capabilities. The addition will enjoin approximately half of the County's land area on this block. The portion of the block that the County owns (RO5021) is comprised of 10 individual lots each one being 25' x 120' in size. The 3 parcels closest to 11th Avenue (Lots 13, 14, 15) are zoned R- 3 (multifamily residential) and the remaining 7 lots (Lots 16-22) are C-2 (community commercial). Additionally, the County plans to acquire (Lots 23 & 24) (the Sinsation's property) at some future date to accommodate further expansion plans. This special use permit will apply to all 10 lots within RO5021; however, the conditions of approval will specifically apply to the first 5 lots adjoining 11th Avenue. Accordingly, a condition of approval will be added to this special use qualifying the need for another special use permit when and if the remaining portion of the land is developed. 2.5 LOCATION: The Crime lab expansion is located on property generally bounded by Belmont street to the north, 11th Avenue to the east, parcel RO5030 to the west and the public alleyway that lies between Belmont and Albany Street on the south (Lots 13-22, Block 63) 2.6 COMPREHENSIVE PLAN COMPONENTS APPLICABLE TO THE REQUEST: 2.6.1 Property Rights: The five checklist criteria set forth by the Attorney General in the "Idaho Regulatory Takings Act Guidelines" were reviewed by planning staff. The criteria is as follows: 1. Does the regulation or action result in a permanent or temporary physical occupation of the land? No 2. Does the regulation or action require a property owner to dedicate a portion of property or to grant an easement? No 3. Does the regulation deprive the owner of all economically viable uses of the property? No Page 2 of 7 Public Hearing of November 23, 2004 4. Does the regulation have a significant impact on the landowner s economic interest? No 5. Does the regulation deny a fundamental attribute of ownership? No 2.6.2 School Facilities and Transportation: The Caldwell School District was notified of the request through mailing of the public hearing notice on November 5, 2004. 2.6.3 Land Use: The crime lab expansion will require a special use because it is a "public type" use. Additionally, the building is being built on land zoned R-3. That type of land use requires a special use permit in this zone. 2.6.4 Public Services, Utilities and Facilities: In a memo dated November 10, 2004, the Engineering Department submitted the following comments: 1. The applicant will be required to replace the existing pedestrian ramp on the northeast corner of the property with one that meets ADA standards, refer to City of Caldwell Supplemental Specifications to the 2003 ISPWC (standard drawing C-712A). 2. The applicant will be required to remove the abandoned driveway approach on the north side of the property and replace with standard curb and gutter as shown on the submitted site plan. The curb and gutter will need to meet the City of Caldwell Supplemental Specifications to the 2003 ISPWC (standard drawing C-715). 3. The applicant will be required to patch the section of asphalt adjacent to the existing driveway approach on the north side of the property. The asphalt repair will need to meet the City of Caldwell Supplemental Specifications to the 2003 ISPWC (standard drawing R-810). 4. The existing paved alley on the south side of the property is in disrepair. The applicant will be required to repair as necessary. The asphalt repair will need to meet the City of Caldwell Supplemental Specifications to the 2003 ISPWC (standard drawing R-803). 5. Both domestic water and sanitary sewer are available to the site. The applicant will be required to connect to City services. Connection fees will be assessed with the Building Permit Application as applicable. 6. All traffic control for the project shall meet the requirements of the Manual on Uniform Traffic Control Devices (M.U.T.C.D.) and the City Engineer. The contractor shall provide a traffic control plan to the City Engineer for review prior to any construction within the right-of-way. 7. The applicant will be required to comply with A.C.H.D. (Ada County Highway District) access spacing and alignment requirements at a minimum. All spacing and alignment will be reviewed with the building permit application. 8. Prior to commencement of construction in any dedicated right-of-way, the City Engineer staff is to be notified. Appropriate City personnel are to be notified in advance of all required inspections. 9. Provision is to be made for the disposal of stormwater drainage that may occur from the addition of impervious surfaces in accordance with the City Stormwater Management Policy. A copy of this policy is available upon request. 10. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation District sources. City municipal water may be used if the criteria specified in the City Code Section 10- 07-12 are met. Page 3 of 7 Public Hearing of November 23, 2004 11. Appropriately licensed public works contractors shall perform all construction of public facilities. 2.6.5. Transportation: The new addition will generate a minimal amount of traffic. The addition is bounded by local streets that carry low volumes of traffic at low speeds. The building will be accessed by way of Belmont Street and possibly through the alleyway to the rear of the building. The existing curb cut on Belmont will be closed and a new one installed in the center of the block. The new driveway location appears sufficient to accommodate the traffic generated at this location with minimal traffic conflict. The parking area will be paved and appears adequate to accommodate the amount of vehicles that this type of land use will generate. 2.6.6 Fire Protection: The Fire Department will present their comments at the public hearing. 2.6.7 Irrigation: The Caldwell Lateral Irrigation District was notified of the request through mailing of the public hearing notice on November 5, 2004. 2.6.8 Landscape: The Applicant is subject to the City's landscape ordinance. 2.6.9 Legal Description: A legal description is attached and incorporated by reference. III TESTIMONY 3.1 Steve Hasson, Community Development Director, presented the staff report. 3.2 Rick Buglatsch, Applicant's Representative, testified in favor and indicated he was there to answer any questions from the Commissioners. Buglatsch indicated the applicant would meet current landscaping and parking ordinance requirements. 3.3 Andy Loveland, Applicant's Representative, testified in favor. IV APPLICABLE LEGAL STANDARDS 4.1 City of Caldwell Zoning Ordinance No. 1451, as amended 4.2 City of Caldwell Comprehensive Plan, as amended 4.3 Idaho Code, Title 67, Chapter 65, Local Planning Act V COMPREHENSIVE PLAN ANALYSIS ON SUP-228-04—The Hearing Examiner accepted the Comprehensive Plan Analysis as written: 5.1 Property Rights - GOAL: To ensure that land use policies, restrictions, conditions and fees do not violate property rights, adversely impact property values or create unnecessary technical limitations on the use of the property. OBJECTIVE B: To identify potential takings of private property prior to a regulatory or administrative action on specific property. POLICY 1: Require staff to follow the Attorney General's Checklist Criteria outlined in the Idaho Regulatory Takings Act Guidelines prior to any proposed regulatory or administrative action on specific property, and to request legal counsel's review if any one of the criteria is answered in the affirmative. 5.2 School Facilities and Transportation - Page 4 of 7 Public Hearing of November 23, 2004 GOAL: To provide the—on-going opportunity for school representatives of Caldwell and Vallivue School Districts to participate in the community planning process. POLICY 1: Include the school districts in the review process when considering land-use proposals. At a minimum, notice of the hearing for each proposal should be provided to the districts and any additional information that the districts might subsequently request. 5.3 Economic Development— GOAL: To continue to work toward providing the residents of Caldwell with adequate levels of all of the components of economic development, such as housing, business, jobs, schools, recreational opportunities, infrastructure systems, public utilities and facilities, and public services. 5.4 Land Use — GOAL: To establish land-use management policies that protect property rights and the environment, maintain a high quality of life, provide adequate land for all types of development and adequately buffer non-compatible uses. OBJECTIVES APPLICABLE TO ALL LAND USES: OBJECTIVE A: To guide the growth and development of land uses in such a way that the hearth, safety, and general welfare of residents will be protected. OBJECTIVE C: To promote growth in areas where public facilities and services are readily available. 5.6 Public Services, Utilities and Facilities — GOAL: To ensure that there are adequate police, fire, emergency services, and public utilities to meet the needs of the public. OBJECTIVE B: To provide for the orderly expansion of public services to meet the needs of population growth. POLICY 1: Require adequate water supply for fire flow when approving development. POLICY 5: Ensure that there are adequate water/sewer systems by planning for short- and long-term water and sewer expansion projects. POLICY 6: Include the appropriate irrigation district in the review process when reviewing new developments. Protect the City's domestic water supply by requiring new developments to provide pressurized irrigation systems that are connected to the applicable irrigation district's system. POLICY 7: Require new developments to meet design standard policies, as adopted by the City, and any other applicable public entity's adopted policies for public infrastructure improvements. 5.7 Transportation GOAL: To provide for the efficient, safe, and cost effective movement of people and goods. OBJECTIVE A: To protect public safety and the environment. Page 5 of 7 Public Hearing of November 23, 2004 5.9 Community Design — GOAL: Foster growth in a manner than will enhance and improve the visual image of the city. OBJECTIVE A: To promote, encourage and maintain an aesthetically pleasing city. OBJECTIVE E: To ensure that new development enhances rather than distracts from the visual image of surrounding areas. POLICY 2: Encourage the installation of landscaped entrances to new developments. VI HEARING EXAMINER'S FINDINGS OF FACT ON CASE NUMBER SUP-228-04 6.1 The Caldwell Hearing Examiner accepted the facts outlined in the staff report; public testimony; the evidence list as well as any pertinent facts brought forward under public testimony VII HEARING EXAMINER'S CONCLUSIONS OF LAW ON CASE NUMBER SUP-228-04 7.1 The Caldwell Hearing Examiner has the authority to hear this request and approve or deny it. The hearing was legally noticed and posted and was held under the requirements of Idaho Code and City ordinances. VIII HEARING EXAMINER'S ORDER OF DECISION ON SUP-228-04 8.1 Based on the findings of fact and conclusions of law, the Caldwell Hearing Examiner orders that Case Number SUP-228-04, a request by Canyon County for approval of a special use permit for development of a public use and another special use to afford the placement of a professional office building in an R-3 zone is approved with the following conditions: 8.2 The specific terms and conditions placed on the Special Use Permits shall run with the land and remain valid upon a change of ownership, or until such time that the Permit(s) may be revoked, become invalid, amended, or replaced with another approved use. 8.3 The Applicant, or future assigns having an interest in the subject property, shall fully comply with all conditions placed upon the Special Use Permits. 8.4 No changes in the conditions and terms of the Special Use Permits, as approved, shall be undertaken by the Applicant, or future assigns having an interest in the subject property, until the Community Development Director has reviewed the proposed changes. If the Director determines that the proposed change(s) is significant, an amendment for change shall only be approved through the public hearing process. 8.5 Any violation of the terms and conditions of the Special Use Permits by the Applicant, or future assigns having an interest in the subject property, will be deemed a misdemeanor and subject to the provisions set forth in Idaho Code, 18-113. Each day's continued violation will be deemed a separate offense. 8.6 Any sign erected at the site shall be in accordance with Section 10-02-06 of Zoning Ordinance No. 1451 and shall require approval of a sign permit prior to installation. 8.7 All of the conditions necessary for receiving a Certificate of Occupancy shall be acquired within twelve months of acquiring the Special Use Permits. Page 6 of 7 Public Hearing of November 23, 2004 8.9 All of the requiremerms placed on the permits by the Builamg Official, Fire Marshall, City Engineer, City Forester, Community Development Director, and any other agencies having approval authority, shall be met. Prior to any construction or use commencing on the site, the Applicant, or future assigns having an interest in the subject property, shall apply for and obtain any applicable permits. 8.10. No residential land uses shall occur on the property. 8.11 The Applicant shall acquire another special use permit when any of the remaining five (5) lots associated with R05021 are developed. CASE NO. SUP-228-04 WAS HEARD BY THE HEARING EXAMINER AT A PUBLIC HEARING HELD NOVEMBER 23, 2004. WRITTEN FINDINGS OF FACT, CONCLUSIONS OF LAW, AND ORDER OF DECISION WAS ADMINISTRAI1UELY,APPROVED AND SIGNED. Ali /2 Jerome Map--, Hearing Ex_. iner Dat ATTEST: W-P—o t'I o (or: )a/r7`t Community Development Director Page 7 of 7 Public Hearing of November 23,2004