Loading...
HomeMy WebLinkAbout03 Public Agency PUBLIC AGENCY �TM ITEM TM DATE SUBMITTED BY kgi-1aN1F `i�eex- MQuy)0 (1-10-6i 6,0 WQ-tyabt)(41\- -(1)-a \memo Memorandum To: Steve Hasson From: Ben Weymouth, Assistant City Engineer Tim King Engineering Tech II Re: Case No. SUP-228-04 Date: November 10, 2004 The Engineering Department provides the following comments concerning a Special Use Permit request by Rick Bugatsch for a crime lab and related site work. The subject property is located at 1024 E. Belmont Street. 1. The applicant will be required to replace the existing pedestrian ramp on the northeast corner of the property with one that meets ADA standards, refer to City of Caldwell Supplemental Specifications to the 2003 ISPWC (standard drawing C-712A). 2. The applicant will be required to remove the abandoned driveway approach on the north side of the property and replace with standard curb and gutter as shown on the submitted site plan. The curb and gutter will need to meet the City of Caldwell Supplemental Specifications to the 2003 ISPWC (standard drawing C-715). 3. The applicant will be required to patch the section of asphalt adjacent to the existing driveway approach on the north side of the property. The asphalt repair will need to meet the City of Caldwell Supplemental Specifications to the 2003 ISPWC (standard drawing R-810). 4. The existing paved alley on the south side of the property is in disrepair. The applicant will be required to repair as necessary. The asphalt repair will need to meet the City of Caldwell Supplemental Specifications to the 2003 ISPWC (standard drawing R-803). 5. Both domestic water and sanitary sewer are available to the site. The applicant will be required to connect to City services. Connection fees will be assessed with the Building Permit Application as applicable. 6. All traffic control for the project shall meet the requirements of the Manual on Uniform Traffic Control Devices (M.U.T.C.D.) and the City Engineer. The contractor shall provide a traffic control plan to the City Engineer for review prior to any construction within the right-of-way. 7. The applicant will be required to comply with A.C.H.D. (Ada County Highway District) access spacing and alignment requirements at a minimum. All spacing and alignment will be reviewed with the building permit application. 8. Prior to commencement of construction in any dedicated right-of-way, the City Engineer staff is to be notified. Appropriate City personnel are to be notified in advance of all required inspections. 9. Provision is to be made for the disposal of stormwater drainage that may occur from the addition of impervious surfaces in accordance with the City Stormwater Management Policy. A copy of this policy is available upon request. 1 10. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation District sources. City municipal water may be used if the criteria specified in the City Code Section 10-07-12 are met. 11. Appropriately licensed public works contractors shall perform all construction of public facilities. 2 Message Page 1 of 1 Debbie Geyer From: Doug Brown Sent: Thursday, December 16, 2004 2:32 PM To: Darrell Mayes; Debbie Geyer; Joan Johnson; Wendy Kirkpatrick; Ben Weymouth Cc: Doug Brown Subject: SUP-228-04 1024 E. Belmont Friends, The CFD did not comment on this SUP for an addition onto the CCSO Narcotics / crime lab facility at 1024 E. Belmont. Instead we will be making any fire code requirements when we receive plans for review as part of our building permit plan review process. Thanks, Doug 12/17/2004