Loading...
HomeMy WebLinkAbout03 Public Agency PUBLIC AGENCY ITEM DATE SUBMITTED BY r1��, t\,- 1A-0y en vJe -y. Memorandum To: Steve Hasson , D � C� C� CIrt� -, From: Ben Weymouth,Assistant City Engineer t/V ,�; Tim King Engineering Tech II NOV 2 4 20fl4 f Re: Case No. SUP-230-04 Zy By Date: November-1-8., 2004 The Engineering Department provides the following comments concerning a Special Use Permit request by Calvary Chapel for a church. The subject property is located at 626 Dearborn. 1. The applicant will be required to replace the existing pedestrian ramp on the southeast corner of the property with one that meets ADA standards, refer to City of Caldwell Supplemental Specifications to the 2003 ISPWC (standard drawing C-712A). 2. All traffic control for the project shall meet the requirements of the Manual on Uniform Traffic Control Devices (M.U.T.C.D.) and the City Engineer. The contractor shall provide a traffic control plan to the City Engineer for review prior to any construction within the right-of-way. 3. The applicant will be required to comply with A.C.H.D. (Ada County Highway District) access spacing and alignment requirements at a minimum. All spacing and alignment will be reviewed with the building permit application. 4. Prior to commencement of construction in any dedicated right-of-way, the City Engineer staff is to be notified. Appropriate City personnel are to be notified in advance of all required inspections. 5. Provision is to be made for the disposal of stormwater drainage that may occur from the addition of impervious surfaces in accordance with the City Stormwater Management Policy. A copy of this policy is available upon request. 6. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation District sources. City municipal water may be used if the criteria specified in the City Code Section 10-07-12 are met. 7. Appropriately licensed public works contractors shall perform all construction of public facilities. 1