08/16/2005 .13:16 FAX 2084594491 PIONEER IRRIGATION 4 CALDWELL P Z 21001
•
Pioneer Irrigation District
JEFF SCOTT P,O.BOX 426 • CALDWELL,IDAHO 83606
Superintendent (208)459-3617
MARK ZIRSCHKY NAIDA KELLEHER
Asst,Superintendent Secretary-Treasurer
August 15, 2005 ' .
RUC
City of Caldwell Community Development Department ° 2005 r i
Fax: 455-3050 •
Attn: Jacqueline Hernandez
Re: Case No. SUP/PUD-252-05 (First Southern Baptist Church) 1
TO WHOM IT MAY CONCERN:
Please be advised there is a delivery point in place for the property being proposed for development.
Pioneer Irrigation District's main concern is that all water rights within the District be honored, and that
access to irrigation water be provided to every parcel of land. Delivery point for said property is gate
6 —Torbett Lateral.
All existing easements, right-of-ways, and other means used to honor the water rights to
downstream waterusers must be maintained and allowed to continue to exist. It is imperative that no
one disrupt the delivery of water to a downstream water user.
Any lateral, canal, drain or other means used to deliver water, along which there is a right-of-way or
easement, must have the same kept clear of all obstructions at all times. No fences, structures, or
other materials are allowed on any of the District's easements or right-of-ways AND they must be
recorded on the final plat. The Torbett Lateral has a 16 foot prescriptive use easement from top
of bank, both sides.
Any discharge or run-off into a federal drain must meet the approval of Mr. John Caywood of the
Bureau of Reclamation. Pioneer Irrigation District does not assume any responsibility for such an
approval. His telephone number is 334-1463. Attention: Parker Gulch Drain (110 foot easement
—55 ft from center)
Please be advised that in order to satisfy the City of Caldwell and Canyon County requirements and
IF it is the intent of the developer to put in a pressurized irrigation system and have Pioneer take over
said system once the development is completed, the following steps are necessary:
PA-I
08/1r/2005 13:16 FAX 2084594491 PIONEER IRRIGATION 4 CALDWELL P Z fJ002
1. Said system must be put in according to the current Standards and Specifications of
Pioneer Irrigation District.
2. A Construction, Operation and Maintenance Agreement must be written up and recorded
at the expense of the Developer and/or owner. All agreements must be reviewed by and
approved by the District's Attorney, Scott Campbell, of Moffatt Thomas in Boise. The
least expensive way to have an agreement drawn up which meets the needs of the District
is by having Mr. Campbell himself draw it up. Otherwise there will be two attorney fees for
said developer and/or owner to pay. Mr. Campbell may be contacted at 345-2000. A
deposit of $1000.00 must be paid to Moffatt Thomas to cover the attorney fees before the
work can begin. Any unexpended portion of the deposit will be refunded. Pioneer
Irrigation District will recommend disapproval of final plat approval until the necessary
agreement has been executed and recorded.
3. The engineering fees will be the responsibility of the developer and/or owner, and a
deposit must be paid in advance to Pioneer Irrigation District before the District will
authorize Earl Mason & Stanfield to review engineering plans. Plans must be received
by Pioneer Irrigation District by December 15th 2005. All construction which may
impact district facilities must be completed prior to the March 15th 2006 deadline.
The construction time-frame which Pioneer allows is November 1st of the current
year to March 15th of the following year Estimated costs for the District's engineering
fees are $500 plus $5.00 per lot. If that amount fails to cover the costs involved due to the
necessity to revise plat maps, etc., additional costs will
be billed out and paid prior to the District's signing off on the final plat.
4. If it is the developers plan to have Pioneer Irrigation District take over a pressurized
irrigation system for the subdivision, it will be necessary that the pump site be designed at
the District's current point of delivery. Service to the subdivision from the pump site must
have its own private delivery line from the delivery point to the subdivision.
5. The developer must contact the office of Earl Mason & Stanfield to make arrangements
for on-site inspections to be made at various points of construction. An engineer from
Earl Mason & Stanfield must be involved in the inspections as they are the engineers for
Pioneer Irrigation District and are familiar with the requirements of Pioneer.
6. Earl Mason and Stanfield must walk through the site and develop a punch list to be
completed prior to recommending that Pioneer Irrigation District take over the pressurized
irrigation system.
If it is NOT the intent of the developer to request Pioneer Irrigation District to take over a pressurized
irrigation system within their completed development, then the above six steps do not apply to their
planned development
Any proposed development which will have downstream waterusers using gravity flow irrigation must
develop their irrigation system in a manner which will insure the downstream waterusers the ability to
acquire at least as much irrigation water for gravity flow irrigation as what they received prior to any
08/11/2005 13:16 FAX 2084594491 PIONEER IRRIGATION 4 CALDWELL P Z Z003
development or construction taking place. The gravity flow irrigation system must be totally separate
from the proposed pressurized irrigation system within a subdivision.
Please be advised, the developer shall submit detailed drawings of any proposed relocations of
Pioneer Irrigation District's facilities, prior to preliminary plat approval. Any said relocations are
subject to approval from the Superintendent and/or the Board of Directors of Pioneer Irrigation District
Any construction that impacts Waters of the United States may require obtaining a 404 permit from
the Corp of Engineers. Greg Martinez of the Corp of Engineers can be contacted at 345-2154.
Prior to finalization of any Agreements with Pioneer Irrigation District, Pioneer Irrigation District must
receive a copy of a 404 permit that has been properly executed. If it is determined by the Corp of
Engineers that a 404 permit is not required, Pioneer Irrigation District must be notified in writing by the
Corp of Engineers that said 404 permit is not required.
NOTE: This letter does not authorize any construction to commence until all the necessary
agreements with Pioneer Irrigation District have been executed and recorded.
If you have any questions, please feel free to call.
Sincere! ,
Mark F. Zirschky
Assistant Superintendent
Memorandum
To: Debbie Geyer
From: Ben Weymouth,Assistant City Engineer " 1/
Tim King Engineering Tech II
Re: Case No. SUP-252-05
Date: August 11, 2005
The Engineering Department provides the following comments concerning a Special Use Permit
request by First Southern Baptist Church for special use permit approval to allow a church within
an R-1 zone and a planned unit development request to allow the proposed church on the same
lot as a newly constructed structure on the same lot This property is located at 912 W Linden
Street..
1. The existing 25-foot one-half width right-of-way along W. Linden Street does not meet
current City standards. The applicant will be required to dedicate as public right-of-way
an additional eight(8) feet to meet City standards for a Minor Arterial Street.
2. The existing 28-foot one-half width right-of-way along Marshall Ave meets current City
standards for a Residential Street.
3. The applicant will be required to construct 6" vertical curb and gutter along the W Linden
Street and Marshall Ave frontages, refer to City of Caldwell Supplemental Specifications
to the 2005 ISPWC (standard drawing C-701).
4. The applicant will be required to construct five (5) foot sidewalk along the W. Linden
frontage, refer to City of Caldwell Supplemental Specifications to the 2005 ISPWC
(standard drawing C-709).
5. The applicant will be required to construct four (4) foot sidewalk along the Marshall Ave
frontage, refer to City of Caldwell Supplemental Specifications to the 2005 ISPWC
(standard drawing C-709).
6. The applicant will be required to construct a pedestrian ramp along the northwest corner
of the intersection of Marshall Ave and W Linden Street, refer to City of Caldwell
Supplemental Specifications to the 2005 ISPWC (standard drawing C-712A).
7. The applicant will be required to comply with A.C.H.D. (Ada County Highway District)
access spacing and alignment requirements at a minimum. The proposed access points
appear to meet these standards with the exception of the westerly approach on W Linden
Street, this approach may be restricted to right in and right out only if it creates traffic
conflicts. All spacing and alignment will be reviewed with the building permit application.
Approach width shall be a minimum of 25-feet and shall be constructed to City
Standards, refer to City of Caldwell Supplemental Specifications to the 2003 ISPWC
(standard drawing C-710).
8. Both domestic water and sanitary sewer are available to the site. The applicant will be
required to connect to City services if not already connected. Additional connection fees
(if applicable)will be assessed with the Building Permit Application.
Page 1 of 2
9. Provision is to be made for the disposal of stormwater drainage that may occur from the
addition of impervious surfaces in accordance with the City Stormwater Management
Policy. A copy of this policy is available upon request.
10. Prior to commencement of construction in any dedicated right-of-way, the City Engineer
staff is to be notified. Appropriate City personnel are to be notified in advance of all
required inspections.
11. All traffic control for the project shall meet the requirements of the Manual on Uniform
Traffic Control Devices (M.U.T.C.D.) and the City Engineer. The contractor shall provide
a traffic control plan to the City Engineer for review prior to any construction within the
right-of-way.
12. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation
District sources. City municipal water may be used only if the criteria specified in the
Landscape Ordinance Section 10-07-12 are met.