Memorandum
To: Debbie Geyer
From: Ben Weymouth, Assistant City Engineer
Tim King, Engineering Tech II
Re: Case No. SUP-252-05 Legacy Wireless Services
Date: August 11, 2005
The Engineering Department does not object to a Special Use Permit request by Legacy Wireless
Services to place (4) four antennas and (2) two microwave dishes on an existing abandoned
boiler stack on a building (old Sears Building) within a C-2 (Community Commercial) zone located
at 524 E. Cleveland Blvd
Page 1 of 1
pA
G�AAL BUILDING HEIGHTS AND AREAS
'N..'
SECTION 504 Exception:The aggregate area of mezzanines in buildings
HEIGHT MODIFICATIONS and structures of Type I or II construction for special indus-
504.1 General.The heights permitted by Table 503 shall only trial occupancies in accordance with Section 503.1.2 shall
be increased in accordance with this section. not exceed two-thirds of the area of the room.
Exception: The height of one-story aircraft hangars, air- 505.3 Egress. Each occupant of a mezzanine shall have ac-
craft paint hangars and buildings used for the manufacturing cess to at least two independent means of egress where the
of aircraft shall not be limited if the building is provided common path of egress travel exceeds the limitations of Sec-
with an automatic fire-extinguishing system in accordance tion 1013.3.Where a stairway provides a means of exit access
with Chapter 9 and is entirely surrounded by public ways or from a mezzanine,the maximum travel distance includes the
yards not less in width than one and one-half times the distance traveled on the stairway measured in the plane of the
height of the building. tread nosing.
! Exce504.2 Automatic sprinkler system increase.Where a build-
ptions:
ing is equipped throughout with an approved automatic sprin -
kler system in accordance with Section 903.3.1.1, the value dance with Section 1014.1.
specified in Table 503 for maximum height is increased by 20
I
feet (6096 mm) and the maximum number of stories is in- 2. Accessible means of egress shall be provided in ac
creased by one story.These increases are permitted in addition cordance with Section 1007.
to the area increase in accordance with Sections 506.2 and 505.4 Openness.A mezzanine shall be open and unobstructed
1 506.3.For Group R buildings equipped throughout with an ap- to the room in which such mezzanine is located except for walls
proved automatic sprinkler system in accordance with Section not more than 42 inches(1067 mm)high,columns and posts.
903.3.1.2,the value specified in Table 503 for maximum height Exceptions:
is increased by 20 feet(6096 mm)and the maximum number of
stories is increased by one story,but shall not exceed four sto- 1. Mezzanines or portions thereof are not required to be
ries or 60 feet(18 288 mm),respectively. open to the room in which the mezzanines are located,
Exceptions: provided that the occupant load of the aggregate area
of the enclosed space does not exceed 10.
1. Group I-2 of Type IIB,III,IV or V construction. 2. A mezzanine having two or more means of egress is
2. Group H-1,H-2,H-3 or H-5. not required to be open to the room in which the mez-
I 3. Fire-resistance rating substitution in accordance with zanine is located,if at least one of the means of egress
Table 601,Note d. provides direct access to an exit from the mezzanine
504.3 Roof structures.Towers,spires,steeples and other roof level.
structures shall be constructed of materials consistent with the 3. Mezzanines or portions thereof are not required to be
required type of construction of the building except where open to the room in which the mezzanines are located,
other construction is permitted by Section 1509.2.1. Such provided that the aggregate floor area of the enclosed
structures shall not be used for habitation or storage.The struc- space does not exceed 10 percent of the mezzanine
tures shall be unlimited in height if of noncombustible materi- area.
als and shall not extend more than 20 feet(6096 mm)above the 4. In industrial facilities, mezzanines used for control
allowable height if of combustible materials (see Chapter 15 equipment are permitted to be glazed on all sides.
for additional requirements). 5. In Group F occupancies of unlimited area, meeting
the requirements of Section 507.2 or 507.3, mezza-
nines 505 nines or portions thereof are not required to be open to
SECTION the room in which the mezzanines are located, pro-
MEZZANINES that an approved fire alarm system is installed
505.1 General. A mezzanine or mezzanines in compliance throughout the entire building or structure and notifi-
with this section shall be considered a portion of the floor be- cation appliances are installed throughout the mezza-
low.Such mezzanines shall not contribute to either the building nines in accordance with the provisions of NFPA 72.
area or number of stories as regulated by Section 503.1. The In addition,the fire alarm system shall be initiated by
area of the mezzanine shall be included in determining the fire automatic sprinkler water flow.
area defined in Section 702.The clear height above and below 505.5 Industrial equipment platforms.Industrial equipment
the mezzanine floor construction shall not be less than 7 feet platforms in buildings shall not be considered as a portion of
(2134 mm). the floor below.Such equipment platforms shall not contribute
505.2 Area limitation.The aggregate area of a mezzanine or to either the building area or the number of stories as regulated
mezzanines within a room shall not exceed one-third of the area by Section 503.1.The area of the industrial equipment platform
of that room or space in which they are located.The enclosed shall not be included in determining the fire area. Industrial
portions of rooms shall not be included in a determination of equipment platforms shall not be a part of any mezzanine,and
the size of the room in which the mezzanine is located.In deter- such platforms and the walkways,stairs and ladders providing
mining the allowable mezzanine area, the area of the mezza- access to an equipment platform shall not serve as a part of the
nine shall not be included in the area of the room. means of egress from the building.
2003 INTERNATIONAL BUILDING CODE® 75
PA 2--