HomeMy WebLinkAbout03 Public Agency PUBLIC AGENCY
ITEM DATE SUBMITTED BY
eta Z✓✓ -1-10,1
?A-I ef>rn or i-s icn-31-05' Mai IC 2�/ ehK�
Canyoh 1-40,1 ''c{
?A _Z Menlo
( ( - 7-oS- 1,rrnohis/F-nciiAceriA5 Depi-•
r^(1e,mo k- 1€-o5" Cordon Lou)) Breve' Crkon
$re.44 Or tor,
1- 3i-���. n^
:� 11'1 �,�v 1 J 0`f
10/31/2005 14:46 FAX 2084594491 PIONEER IRRIGATION 4 CALDWELL P Z fj001
Pioneer ][nigation District
'-�-- M �'`.�
JEFF SCOTT P.O.BOX 426 r CALDWELL, IDAHO 83606
Superintendent (208)459-3617
MARK ZIRSCHKY NA DA KELLEHER
Asst.Superintendent Secretary-Treasurer
:/4 E
OCT 3
October 31, 2005 C L . I 005
City of Caldwell Community Development Department
Fax: 455-3050
Attn: Jacqueline Hernandez
Re: Case No. SUP-255-05 (City Well Site #19)
TO WHOM IT MAY CONCERN:
Please be advised there is a delivery point in place for the property being proposed for development.
Pioneer Irrigation District's main concern is that all water rights within the D strict be honored, and that
access to irrigation water be provided to every parcel of land. Delivery point for said property is
gate 6 & 7 -300 Lateral.
All existing easements, right-of-ways, and other means used to honor the water rights to
downstream waterusers must be maintained and allowed to continue to exist. It is imperative that no
one disrupt the delivery of water to a downstream water user.
Any discharge or run-off into a federal drain must meet the approval o.f Mr. John Caywood of the
Bureau of Reclamation. Pioneer Irrigation District does not assume any responsibility for such an
approval. His telephone number is 334-1463. Attention: Solomon Drain (110 foot easement —55
ft from center)
NOTE: This letter does not authorize any construction to commence until all the necessary
agreements with Pioneer Irrigation District have been executed and recorded.
If you have any questions, please feel free to call.
Sincere) .
i
Mark F. Zirschky
Assistant Superintendent
PA-
p CAN ')N HIGHWAY DISTRICT NO. 4
.1. cy 15435 HIGHWAY 44
c, 7 CALDWELL, IDAHO 83607
CanyonH4 @AOL.COM
DISTRICT TELEPHONE 208/454-8135
FAX 208/454-2008
fi�1a ti
NOV
f
2005
November 3,2005 _ �
Community Development Dept
City of Caldwell
P.O. Box 1177
Caldwell,ID 83605
RE: City Well Site#19—Case No. SUP-255-05 (City of Caldwell)
Canyon Highway District No. 4 has reviewed the above referenced special use permit and provides the
following comments:
1. KCID Road Frontage Improvements. A 40' right-of-way dedication along KCID Road and
improvement of this frontage to the City of Caldwell's minor arterial street standard is
recommended.
2. Street Cuts. If any utilities are required to cross KCID Road for this project,the utilities need to
be bored. This road was reconstructed this year as part of a sewer extension project.
Thank you for the opportunity to comment on this request. Please call me or Casey Bequeath, Director at
454-8135 if you have questions.
Sincerely,
Timothy Ri ard,P.E.
Engineer
Cc: Casey Bequeath,Director CHD4
TA/v
Memorandum
To: Gian Paolo Mammone
From: Gordon Law, City 4)7"-----
Brent Orton, Associate Engineer
Re: Case No. SUP-255-05 (City Well Site #19)
Date: November 15, 2005
The Engineering Department provides the following comments concerning a Special Use
Permit request by City of Caldwell for Municipal Well Site #19.
Street
1. in accordance with the City of Caldwell's Infrastructure Improvement Policy, the
Urban Collector status of KCID Road, and consistency with surrounding
development, the applicant will be required to construct a roadway half width of
24.5 feet to top-back-of-curb and an attached 5' sidewalk along the entire KCID
Road frontage. Refer to City of Caldwell Supplemental Specifications to the 2005
ISPWC.
2. Any approaches on KCID Road are required to comply with ACHD intersection
spacing and alignment standards at a minimum. Approach width shall be a
minimum of 25-feet and shall be constructed to City Standards, refer to City of
Caldwell Supplemental Specifications to the 2005 ISPWC (standard drawing C-
710).
3. The applicant shall comply with Idaho State Statute 49-221 regarding clear sight
at intersections and driveways.
Sewer &Water
1. Both domestic water and sanitary sewer are available to the site. The applicant
will be required to connect to City water services only as sewer will not be
required at the site. Additional connection fees (if applicable) will be assessed
with the Special Use Permit Application.
Storm Drain
1. Provision is to be made for the disposal of stormwater drainage that may occur
from the addition of impervious surfaces in accordance with the City Stormwater
Management Policy. A copy of this policy is available upon request.
Page 1 of 2
PA-3
Irrigation
1. Irrigation water for any and all landscaping shall be obtained from applicable
Government Irrigation District sources. City municipal water may be used only if
the criteria specified in the Landscape Ordinance Section 10-07-12 are met.
General
1. Prior to commencement of construction in any dedicated right-of-way, the City
Engineer staff is to be notified. Appropriate City personnel are to be notified in
advance of all required inspections.
2. All traffic control for the project shall meet the requirements of the Manual on
Uniform Traffic Control Devices (M.U.T.C.D.) and the City Engineer. The
contractor shall provide a traffic control plan to the City Engineer for review prior
to any construction within the right-of-way.
3. The applicant shall comply with the City Landscape Ordinance (City Code
Section 10-07) and the City Tree Ordinance (City Code Section 10-08).
4. The 10-foot utility easement along the frontage should be kept free of trees.
5. Appropriately licensed public works contractors shall perform all construction of
dedicated facilities.
Page 2 of 2
Melodie Halstead
From: Brent Orton
Sent: Tuesday, January 31, 2006 3:54 PM
To: Melodie Halstead
Subject: City Well # 19 Site
Good Afternoon Melodie:
I hope the following items will clarify what the City desires to do with respect to Municipal Well # 19 located on KCID road
between the Delaware Park and Pheasant Run Subdivisions.
The need for several of these changes came after counseling with our well consultant, Ed Squires.
1. The question was raised at the first hearing about what type of fencing was desired around the facility and whether
barbed-wire strands should be installed.
The answer to this question is: a 6-foot chain link fence with no barbed wire strands is desired and will be
shown on the site plan we submit with the packet.
2. What Changes have we made to the site plan?
Two major changes have been made to the site plan.
A. The approach has been moved to the north in order to reduce the paved area and parking lot
size with respect to the required location of the well house.
B. The detention pond has been eliminated. Storm water facilities are not necessary or required
considering the size of the impervious area. The reason for the pond was to detain start up flush waters -these are
essentially drinking water and will be wasted to the drain.
3. There is one other possible change.
C. The building may be rotated slightly to facilitate covering a second future well on the site.
Please feel free to contact me with any questions or further items for clarifications
Sincerely,
Brent Orton
Brent L. Orton, EIT
Associate Engineer
City of Caldwell, Idaho
borton @ci.caldwell.id.us
208 455 3006
208 455 3012 (fax)
1
Memorandum
To: Melodie Halstead, Planner; Brian Billingsley, Senior Planner
From: Brent Orton, Associate Engineer
Re: Case No. SUP-255-05 City Well Site #19 Special Use Permit Application
Date: February 24, 2006
The City of Caldwell Engineering Department has reviewed past proceedings and information
exchange regarding the referenced case. This memo is intended to clarify all points of question
and establish the intentions with respect to this case.
Fencing Desired: The fencing desired for the project is a 6-foot chain-link fence surrounding the
paved area only on the site. We do not generally put barbed wire around our well houses.
Consistent with our standard approach, barbed wire is not desired for this project.
Site Plan: Changes to the site plan have occurred as input from our hydrologic engineer,the
water department,and the public works director were orchestrated into a design layout meeting as
many design considerations and constraints as possible.
Storm Drainage: Storm drainage will be captured in surrounding grassed area. The size
of the impervious and configuration of the impervious area do not warrant additional drainage
facilities. The pond shown on the original site plan was to detain start-up flush waters. Flush
water is essentially drinking water and will be wasted directly to the nearby drain.
Pavement: The paved area has been reduced to minimize cost,provide an efficient
layout, and maximize the capability to add an additional well within the allowed zone (shown on
the site plan as a dashed line). Paving will completely surround the building and fencing
completely surround the paved are to reduce the potential for vandalism, prevent the growth of
weeds inside the fence, and simplify maintenance of the grounds. All area outside the fence will
be grassed and landscaped as indicated on the plans.
Landscaping: Sidewalk, Landscaping, and the utility easement will be arranged so as to
compliment and match the existing and planned surrounding residential development.
Landscaping will be consistent with the City of Caldwell Landscape Ordinance.
Access: The access point is 10 feet away from the property line meeting the 5-foot
property line offset requirement.
Emergency Services Communication Tower: There is presently no intention to install an
emergency services tower. There will be a small antennae mounted on the well house for which
no SUP is necessary. Guidance is sought as to the placement of an emergency services tower as
described in the application if it should become necessary in the future.
Please feel free to contact me with any questions on 350 9422.
Thank you.
Brent Orton
Associate Engineer
-PIA