HomeMy WebLinkAbout03 Public Agency I PUBLIC AGENCY
ITEM DATE SUBMITTED BY
4Pfq- I
pv,`. � €HCy
Memorandum
To: Gian Paolo Mammone
From: Gordon Law, City Engineer
Tim King, Engineering Tech II
Re: Case No. SUP-271-06 Lisa Itano
Date: June, 27 2006
The Engineering Department provides the following comments concerning a Special Use
Permit by Lisa Itano for a preschool. The site is located at 1305 Fillmore Street.
Rights-of-Way
1. The existing forty (40) foot one half width right-of-way along the South 13th Street
frontage meets minimum city requirements. The dedication of additional right-of-
way will not be required at this time.
2. The existing forty (40) foot one half width right-of-way along the Fillmore Street
frontage meets minimum city requirements. The dedication of additional right-of-
way will not be required at this time.
Street
1. The applicant will be required to close the existing driveway approach along the
Fillmore Street frontage.
2. The existing curb & gutter along the Fillmore Street frontage does not meet city
standards. The applicant will be required to replace the existing curb & gutter
along the Fillmore Street frontage, which includes the modification of the existing
catch basin, to meet City standards, refer to City of Caldwell Supplemental
Specifications to the 2005 ISPWC (standard drawing C-701).
3. The existing curb & gutter along the South 13th Street frontage does not meet city
standards. The applicant will be required to replace the existing curb & gutter
along the South 13th Street frontage to meet City standards, refer to City of
Caldwell Supplemental Specifications to the 2005 ISPWC (standard drawing C-
701).
4. The applicant will be required to pave the existing alley adjacent to the
northeasterly boundary and which shall extend the full length of said frontage,
refer to City of Caldwell Supplemental Specifications to the 2005 ISPWC
(standard drawing R-803).
Page 1 of 2
Sewer &Water
1. The subject property is currently connected to both domestic water and sanitary
sewer. Additional connection fees (if applicable) will be assessed with the
Change of Use Application for these City services.
Irrigation
1. Irrigation water for any and all landscaping shall be obtained from applicable
Irrigation District sources. City municipal water may be used only if the criteria
specified in the Landscape Ordinance Section 10-07-12 are met.
Storm Drain
1. Provision is to be made for the disposal of stormwater drainage that may occur
from the addition of impervious surfaces in accordance with the City Stormwater
Management Policy. A copy of this policy is available upon request.
General
1. Prior to commencement of construction in any dedicated right-of-way, the City
Engineer staff is to be notified. Appropriate City personnel are to be notified in
advance of all required inspections.
2. Appropriately licensed public works contractors shall perform all construction of
public facilities.
3. All traffic control for the project shall meet the requirements of the Manual on
Uniform Traffic Control Devices (M.U.T.C.D.) and the City Engineer. The
contractor shall provide a traffic control plan to the City Engineer for review prior
to any construction within the right-of-way.
Page 2 of 2