Loading...
HomeMy WebLinkAbout03 Public Agency I PUBLIC AGENCY ITEM DATE SUBMITTED BY 4Pfq- I pv,`. � €HCy Memorandum To: Gian Paolo Mammone From: Gordon Law, City Engineer Tim King, Engineering Tech II Re: Case No. SUP-271-06 Lisa Itano Date: June, 27 2006 The Engineering Department provides the following comments concerning a Special Use Permit by Lisa Itano for a preschool. The site is located at 1305 Fillmore Street. Rights-of-Way 1. The existing forty (40) foot one half width right-of-way along the South 13th Street frontage meets minimum city requirements. The dedication of additional right-of- way will not be required at this time. 2. The existing forty (40) foot one half width right-of-way along the Fillmore Street frontage meets minimum city requirements. The dedication of additional right-of- way will not be required at this time. Street 1. The applicant will be required to close the existing driveway approach along the Fillmore Street frontage. 2. The existing curb & gutter along the Fillmore Street frontage does not meet city standards. The applicant will be required to replace the existing curb & gutter along the Fillmore Street frontage, which includes the modification of the existing catch basin, to meet City standards, refer to City of Caldwell Supplemental Specifications to the 2005 ISPWC (standard drawing C-701). 3. The existing curb & gutter along the South 13th Street frontage does not meet city standards. The applicant will be required to replace the existing curb & gutter along the South 13th Street frontage to meet City standards, refer to City of Caldwell Supplemental Specifications to the 2005 ISPWC (standard drawing C- 701). 4. The applicant will be required to pave the existing alley adjacent to the northeasterly boundary and which shall extend the full length of said frontage, refer to City of Caldwell Supplemental Specifications to the 2005 ISPWC (standard drawing R-803). Page 1 of 2 Sewer &Water 1. The subject property is currently connected to both domestic water and sanitary sewer. Additional connection fees (if applicable) will be assessed with the Change of Use Application for these City services. Irrigation 1. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation District sources. City municipal water may be used only if the criteria specified in the Landscape Ordinance Section 10-07-12 are met. Storm Drain 1. Provision is to be made for the disposal of stormwater drainage that may occur from the addition of impervious surfaces in accordance with the City Stormwater Management Policy. A copy of this policy is available upon request. General 1. Prior to commencement of construction in any dedicated right-of-way, the City Engineer staff is to be notified. Appropriate City personnel are to be notified in advance of all required inspections. 2. Appropriately licensed public works contractors shall perform all construction of public facilities. 3. All traffic control for the project shall meet the requirements of the Manual on Uniform Traffic Control Devices (M.U.T.C.D.) and the City Engineer. The contractor shall provide a traffic control plan to the City Engineer for review prior to any construction within the right-of-way. Page 2 of 2