ei of Caldwell Community Development Department
455-3050
Case No SUP-234-06 (Verizon Wireless Monopole)
IT MAY CONCERN:
l• ese, edvised that ,f it the intent to erect the above referenced monopole eithA t area cf the
I liteh t,):e•rt, please note the following.
Elljat Drain has a 110 feet Federal Right of Way, 55 feet from center of drain on each side.
Io o b.e no obsleuctions, fences, buildings, walk paths, etc. within said right of way. John
f Rec amation can be contacted at 383-22";9.
f,...'onsiructicn -.hat impacts Waters of the United States may require obtain.ng a 404 permit from
,2etre of Engineers. C3reg Martinez of the Corp of Engineers can be contacted 3t 7:452154.
le, I-elle:310n of any Agreements with Pioneer Irrigation District. Pioneer irrig3tier fl t
• !:-:idvce cupy f a 404 pen-nit that has been properly executed. If it is deterner,e: by tha CCrp of
,,: reeEee=, that a 404 permit is not required, Pioneer irrigation District must be nattier] in ,,eriting by the
Eigineers that said 404 permit is not required.
,-1)7.E: This letter does not authorize any construction to commence until all lIcess,lry
;irtiernents1,14.41-1 Pioneer irrigation District have been e);k:?ciateld. and reco;rcileit
have any questons, please feel free to call.
,/
,' C--1 , ';(
rSChkY
[$tiant Superintendent
Memorandum
To: Community Development
From: Gordon Law, City Engineer
Tim King, Engineering Tech II
Re: SUP 284-06 Verizon Wireless
Date: November 21, 2006
The Engineering Department provides the following comments on a request by Verizon Wireless
for special use permit approval to locate a new, wireless communication facility on leased land
owned by Alice P.Estrada. The site is located at the northeast corner of Lake Ave and Ustick Road.
14-Od-■‘
Rights-of-Way
1. Ustick Road is classified as a Principal Arterial, The owner shall be required to dedicate as
public right-of-way a forty-five (45) foot one-half width right-of-way along the Ustick Road
frontage (minus existing) to meet City of Caldwell requirements.
2. Lake Avenue is classified as a Minor Arterial. The owner shall be required to dedicate as public
right-of-way a forty (40) foot one-half width right-of-way along the Lake Avenue frontage (minus
existing) to meet City of Caldwell requirements.
Street
1. The applicant shall improve Ustick Road to include a 33.0-foot one- half width street section
from centerline to back of curb. The street shall feature standard vertical curb and gutter,
minimum 5 foot sidewalks, sub-base and asphalt paving, required storm water drainage
facilities and streetlights.
2. The applicant shall improve Lake Avenue to include a 24.5-foot one- half width street section
from centerline to back of curb. The street shall feature standard vertical curb and gutter,
minimum 5 foot sidewalks, sub-base and asphalt paving, required storm water drainage
facilities and streetlights.
3. Any approaches on Ustick Road or Lake Avenue will be required to comply with ACHD
intersection and driveway spacing and alignment standards as adopted by the City of Caldwell
at a minimum.
Page 1 of 3
*r_
Development Plans
1. Development Plans—Prior to commencing construction, plans must be prepared by the
developer's engineer and approved by the City Engineering Department which shall include the
following items:
a. Street section and alignment (including curb and gutter);
b. Sidewalk (5 foot minimum on Ustick Road and Lake Avenue);
c. Sanitary sewer(per City and DEQ requirements);
d. Potable water(per City and DEQ requirements);
e. Stormwater facilities (per City Policy);
f. Street lighting (at intersections and maximum spacing of 350 feet and must meet Idaho
Power design standards plus conform identically to the lamp, ballast, and sensor switching
equipment used by Idaho Power or City Engineer approved alternative);
g. Street signage (per City and MUTCD requirements);
h. Vertical Datum based on NAVD 88 Datum.
General
1. Appropriate easements for drains, canals or supply ditches, transmission lines, and other
utilities shall be clearly indicated on the proposed construction drawings.
2. All street, sewer, water, fire protection, and street light facilities must be dedicated to the City.
Some conveyance facilities for stormwater drainage may be eligible for dedication to the City.
3. Construction of dedicated facilities is to be performed by an appropriately licensed public works
contractor and constructed to City of Caldwell specifications.
4. Prior to commencement of construction in any dedicated right-of-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified. This preferably will take place in a pre-construction
conference scheduled by the engineer of record in which all appropriate personnel and utilities
are present. Appropriate City personnel are to be notified in advance of all testing (including
compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of
the testing. The engineer of record or his designated representative is to witness all tests and a
log of inspection visits and testing results is to be kept by the engineer of record or his
representative.
5. The developer is to employ a responsible design professional, preferably the engineer of
record, to oversee and inspect construction, to perform and/or observe all requisite testing of
Page 2 of 3
completed facilities, and to certify that improvements have been constructed according to
approved plans and in compliance with applicable City, State, and Federal standards.
6. The engineer of record shall be held responsible to ensure that the developments
improvements are in substantial compliance with said engineer's design. Following the
construction of the developments improvements, the developers engineer shall provide the City
of Caldwell Engineering Department with reproducible Mylar As-built plans suitable for blue-line
reproduction for future reference and to allow establish that the engineer of record has caused
construction to occur in substantial compliance with the design of said engineer of record.
Irrigation
1. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation
District sources.
2. The developer shall maintain any existing upstream drainage rights and downstream
irrigation rights across the property. During the design phase of this project, the developer
or his engineer is to contact the appropriate irrigation district to help ascertain these rights.
These rights shall be shown in full, topographically, and submitted for review along with the
developments proposed construction drawings. Appropriate facilities to convey irrigation and
drainage water across the property to take care of any offsite needs shall be included. A
letter is to be obtained from the appropriate irrigation district indicating their concurrence
with the design and facilities that preserve these existing rights, if any.
Storm Drain
1. As noted previously, provision is to be made for the disposal of stormwater drainage in
accordance with the City Stormwater Management Manual and any updates adopted
subsequent to this application. It is to be noted that retention designs will be denied in most
instances. A copy of this policy is available upon request. The engineer of record is to provide
calculations, which indicate that the assumptions in his stormwater drainage plan comply with
the requirements of the stormwater policy. For any off-site discharge, approval for design of the
outfall from the agency responsible for the receiving water body is required before final plat
approval.
Sewer&Water
1. Sewer and Water are available to the subject property from mainlines adjacent to the property
in Ustick Road and Lake Avenue.
2. All on site water mains will need to be looped into existing mains for fire flow and water quality
purposes (if applicable). Internal main sizing and construction plan approval, will be dependent
upon the availability of fire flow.
Page 3 of 3