Pioneer Irrigation District
JEFF SCOTT P,O, BOX 426 • CALDWELL, IDAHO 53606
Superintendent (208)459-3617
MARK ZIRSCHKY NAIDA KELLEHER
Asst. Superintendent Secretary-'treasurer
May 1, 2007
City of Caldwell Community Development Department
Fax: 455-3050
Attn: Anne Marie Skinner
Re: Case No. SUP-291-07 (Vision Charter School) Special Use Permit
TO WHOM IT MAY CONCERN:
Please be advised there is a delivery point in place for the property being proposed for development.
Pioneer Irrigation District's main concern is that all water rights within the District be honored, and that
access to irrigation water be provided to every parcel of land.
All existing easements, right-of-ways, and other means used to honor the water rights to
downstream waterusers must be maintained and allowed to continue to exist. It is imperative that no
one disrupt the delivery of water to a downstream water user.
Any lateral, canal, drain or other means used to deliver water, along which there is a right-of-way or
easement, must have the same kept clear of all obstructions at all times. No fences, structures, or
other materials are allowed on any of the District's easements or right-of-ways AND they must be
recorded on the final plat. 400 (Horton) Lateral has a 16 foot prescriptive use easement from top
of bank along both sides of the lateral.
There are to be no pathways within Pioneer Irrigation District easements.
Any discharge or run-off into a federal drain must meet the approval of Lupe Rodriguez of the Bureau
of Reclamation. Pioneer Irrigation District does not assume any responsibility for such an approval_
Her telephone number is 383-2221. "A" Drain — 110 foot Federal Right of Way, 55 feet from
centerline of drain_ There is to be no obstructions, fences, buildings, walk paths, etc. within right of
way.
Please be advised that NO change to or crossing of a District facility can take place unless a License
Agreement or Crossing Agreement between the District and the owner/developer of the property has
been signed and recorded. Please contact the District's Attorney, Scott L. Campbell, in writing if you
need to obtain such an agreement. His contact information is: Scott L. Campbell, Moffatt Thomas
05i01-2007 11:29 FAl 03459449] PIONEER IRRIGATION 4LDWELL P Z 211002
Barrett Rock & Fields, Chtd., 101 S. Capitol Blvd., 10th Floor, Boise, Idaho 83702, phone: (208) 345-
2000, fax: (208) 385-5384.
A License Agreement or Crossing Agreement must be written up and recorded at the expense of the
Developer and/or owner. All agreements must be reviewed by and approved by Mr. Campbell. The
least expensive way to have an agreement drawn up which meets the need of the District is by
having Mr. Campbell himself draw it up. Otherwise there will be two attorney fees for said developer
torney
and/or owner to pay- A deposit of $1000.00 must be paid to Mott,t, T oml// to
reover the t Pioneer e
fees before the work can begin. Any unexpended portion of the
Irrigation District will recommend disapproval of the final plat approval, until the agreement has been
executed and recorded_ If construction begins without the required agreement, Pioneer Irrigation
District will pursue judicial relief to stop the construction_
Plans must be received by Pioneer Irrigation District by December 15th, 2007. All construction
which may impact District facilities must be completed prior to the March 15th, 2008 deadline.
The construction time-frame which Pioneer Irrigation District allows is November 1st of the
current year to March 15th of the following year.
Any proposed development which will have downstream waterusers using gravity flow irrigation must
develop their irrigation system in a manner which will insure the downstream waterusers the ability to
acquire at least as much irrigation water for gravity flow irrigation as what they received prior to any
development or construction taking place_ The gravity flow irrigation system must be totally separate
from the
ra osed pressurized irrigation system within a subdivision.
p p p
Please be advised, the developer shall submit detailed drawings of any proposed relocations of
Pioneer Irrigation District's facilities, prior to preliminary plat approval. Any said relocations are
subject to approval from the Superintendent and/or the Board of Directors of Pioneer Irrigation District
Any construction that impacts Waters of the United States may require obtaining a 404 permit from
the Corp of Engineers. Greg Martinez of the Corp of Engineers can be contacted at 345-2154.
Prior to finalization of any Agreements with Pioneer Irrigation District, Pioneer Irrigation District must
receive a copy of a 404 permit that has been properly executed. If it is determined by the Corp of
Engineers that a 404 permit is not required, Pioneer Irrigation District must be notified in writing by the
Corp of Engineers that said 404 permit is not required.
NOTE: This letter does not authorize any construction to commence until all the necessary
agreements with Pioneer Irrigation District have been executed and recorded.
If you have any questions or comments, please do not hesitate to call_
Sincerely,
&/*/4-6—Mark F. Zirschky
Assistant Superintendent
Memorandum
To: Community Development
From: Gordon Law, City Engineer
Tim King, Engineering Tech II -7,
Re: SUP 291-07 Vision Charter School
Date: May 4, 2007
The Engineering Department does not appose a request by Jonathan Motte, Timothy Cobb and
Vision Charter School for a Special Use Permit to allow a charter school on Lot 1 Block 3 of
Skyway Bussiness Park which is located at Skyway Street and Freedom Avenue.