Memorandum
To: Community Development
From: Gordon Law, City Engineer ��
Tim King, Engineering Tech II
Re: SUP 288-07/ANN-152-07 Florida Ave Self Storage
Date: April 2, 2007
The Engineering Department provides the following comments on a request by Rodney Deide for
the annexation of 4.22 acres of land into the city with C-2 (Community Commercial) zoning, a
Special Use Permit for a self storage facility and a comprehensive plan map amendment. The site
is located at 5401 S. Florida Ave.
This annexation is subject to a development agreement.
Rights-of-Way
1. Florida Ave is classified as a Collector. The applicant shall be required to dedicate as public
right-of-way a thirty-three (33) foot one half width right-of-way along the Florida Ave frontage
(minus existing)to meet City of Caldwell requirements.
Street
1. The applicant shall improve Florida Ave to include a 20.5 foot half-width street section center-
line to back of curb and 5 foot sidewalk. The street shall feature standard vertical curb and
gutter, 5 foot sidewalks, sub-base and asphalt paving, required storm water drainage facilities
and streetlights. These improvements are to extend the entire length of the subject property.
2. Any approaches on Florida Ave will be required to comply with ACHD intersection and
driveway spacing and alignment standards as adopted by the City of Caldwell at a minimum.
3. The secondary access point to the north shall align with McLaughlin Drive within the Aspens
Subdivision No.4.
Development Plans
1. Development Plans— Prior to commencing construction, plans must be prepared by the
developer's engineer and approved by the City Engineering Department which shall include the
following items:
a. Street section and alignment (including curb and gutter);
Page 1 of 4
b. Sidewalk (5 foot minimum on Florida Ave);
c. Sanitary sewer(per City and DEQ requirements);
d. Potable water(per City and DEQ requirements);
e. Stormwater facilities (per City Policy);
f. Street lighting (at intersections and maximum spacing of 350 feet and must meet Idaho
Power design standards plus conform identically to the lamp, ballast, and sensor switching
equipment used by Idaho Power or City Engineer approved alternative);
g. Street signage (per City and MUTCD requirements);
h. Vertical Datum based on NAVD 88 Datum.
General
1. Appropriate easements for drains, canals or supply ditches, transmission lines, and other
utilities shall be clearly indicated on the proposed construction drawings.
2. All street, sewer, water, fire protection, and street light facilities must be dedicated to the City.
Some conveyance facilities for stormwater drainage may be eligible for dedication to the City.
3. Construction of dedicated facilities is to be performed by an appropriately licensed public works
contractor and constructed to City of Caldwell specifications.
4. Prior to commencement of construction in any dedicated right-of-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified. This preferably will take place in a pre-construction
conference scheduled by the engineer of record in which all appropriate personnel and utilities
are present. Appropriate City personnel are to be notified in advance of all testing (including
compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of
the testing. The engineer of record or his designated representative is to witness all tests and a
log of inspection visits and testing results is to be kept by the engineer of record or his
representative.
5. The developer is to employ a responsible design professional, preferably the engineer of
record, to oversee and inspect construction, to perform and/or observe all requisite testing of
completed facilities, and to certify that improvements have been constructed according to
approved plans and in compliance with applicable City, State, and Federal standards.
6. The engineer of record shall be held responsible to ensure that subdivision improvements are
in substantial compliance with said engineer's design. Following the construction of the
subdivision improvements, the developers engineer shall provide the City of Caldwell
Engineering Department with an electronic copy and reproducible Mylar As-built plans suitable
for blue-line reproduction for future reference and to establish that the engineer of record has
caused construction to occur in substantial compliance with the design of said engineer of
record.
Page 2 of 4
7. Any note, item or drawing element on the plats, construction drawings, engineering drawings
and/or design drawings related to the property inconsistent with City Codes, Policies and/or
Ordinances shall not be constructed as approved unless it has been specifically addressed and
granted by City Council as a variance.
Water
1. All on site water mains will need to be looped into existing mains for fire flow and water quality
purposes. Internal main sizing and construction plan approval, will be dependent upon the
availability of fire flow.
2. The applicant will be required (where applicable) to extend all water mainlines to the center of
adjacent roadways for connectivity by future developments. Locations of said extensions will be
decided during the review of the improvement plans.
3. The location of water service, including sizing of mains, providing of easements, frontage
construction, and offsite construction are to be decided during review of improvement plans.
This development will be required to comply with the Water Master Study.
Irrigation
1. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation
District sources.
2. All landscape areas shall be equipped with an automatic pressurized irrigation system.
3. The developer shall maintain any existing upstream drainage rights and downstream
irrigation water supply rights across the property. During the design phase of this project,
the developer or his engineer is to contact the appropriate irrigation district to help ascertain
these rights. These rights shall be shown in full, topographically, and submitted for review
along with the developments proposed construction drawings. Appropriate facilities to
convey irrigation and drainage water across the property to take care of any offsite needs
shall be included. There is to be no discharge of gravity irrigation return water into the
subdivision storm water system.
4. Conveyance systems are subject to irrigation district and City of Caldwell design review and
approval.
Storm Drain
1. As noted previously, provision is to be made for the disposal of stormwater drainage in
accordance with the City Stormwater Management Manual and any updates adopted
subsequent to this application. It is to be noted that retention designs will be denied in most
instances. A copy of this policy is available upon request. The engineer of record is to provide
calculations, which indicate that the assumptions in his stormwater drainage plan comply with
the requirements of the stormwater manual. For any off-site discharge, approval for design of
the outfall from the agency responsible for the receiving water body is required before final plat
approval.
Page 3 of 4
Sewer
1. The site will be required to comply with the Dixie Master Plan as updated which includes the
installation of a 27" trunk line along the Florida Ave alignment. The location of sewer service,
including sizing of mains, providing of easements, frontage construction, and offsite
construction are to be decided during review of improvement plans. All weather surfaces may
be required adjacent to mainlines that fall outside public right-of-way.
2. Any easements for sewer lines not in the right-of-way shall be at least 20 feet in width.
Easements for adjacent sewer and water lines not in the right-of-way shall be no less than 30
feet in width. An all weather surface shall be installed on said easements to facilitate access
and maintenance of said utilities.
Page 4 of 4
04/10/2007 15:08 FAX 2084594491 PIONEER IRRIGATION 4 CALDWELL P Z Z 001/002
; Pioneer Irrigation District
JEFF SCOTT P.O.BOX 426 • CALDWELL, IDAHO 83606
Superintendent (208)459-3617
MARK ZIRSCHKY NAIDA KELLEHER
Asst. Superintendent Secretary-Treasurer
April 10, 2007
City of Caldwell Community Development Department
Fax: 455-3050
Attn: Anne Marie Skinner
Re: Case No. SUP-288-07 & ANN-152-07 (Florida Avenue Self Storage)
TO WHOM IT MAY CONCERN:
Please be advised there is a delivery point in place for the property being proposed for development.
Pioneer Irrigation District's main concern is that all water rights within the District be honored, and that
access to irrigation water be provided to every parcel of land. Delivery point for said property is
gate 15 and 16—25.1 Lateral.
All existing easements, right-of-ways, and other means used to honor the water rights to
downstream waterusers must be maintained and allowed to continue to exist. It is imperative that no
one disrupt the delivery of water to a downstream water user,
Any lateral, canal, drain or other means used to deliver water, along which there is a right-of-way or
easement, must have the same kept clear of all obstructions at all times. No fences, structures, or
other materials are allowed on any of the District's easements or right-of-ways AND they must be
recorded on the final plat. 25.1 Lateral — 16 foot from top of bank prescriptive use easement
along both sides of the lateral.
There are to be no pathways within Pioneer Irrigation District easements.
Any discharge or run-off into a federal drain must meet the approval of Lupe Rodriguez of the Bureau
of Reclamation. Pioneer Irrigation District does not assume any responsibility for such an approval.
Her telephone number is 383-2221. Dixie Drain — 110 foot Federal Right of Way, 55 feet from
centerline of drain. There is to be no obstructions, fences, buildings, walk paths, etc. within right of
way.
Please be advised that NO change to or crossing of a District facility can take place unless a License
Agreement or Crossing Agreement between the District and the owner/developer of the property has
been signed and recorded. Please contact the District's Attorney, Scott L. Campbell, in writing if you
04;10/2007 15:08 FAX 2084594491 PIONEER IRRIGATION 3 CALDW'ELL P Z 2002.002
need to obtain such an agreement. His contact information is: Scott L. Campbell, Moffatt Thomas
Barrett Rock & Fields, Chtd., 101 S. Capitol Blvd., 10th Floor, Boise, Idaho 83702, phone: (208) 345-
2000, fax: (208) 385-5384.
A License Agreement or Crossing Agreement must be written up and recorded at the expense of the
Developer and/or owner. All agreements must be reviewed by and approved by Mr. Campbell. The
least expensive way to have an agreement drawn up which meets the need of the District is by
having Mr. Campbell himself draw it up. Otherwise there will be two attorney fees for said developer
and/or owner to pay. A deposit of $1000.00 must be paid to Moffatt, Thomas to cover the attorney
fees before the work can begin. Any unexpended portion of the deposit will be refunded. Pioneer
irrigation District will recommend disapproval of the final plat approval, until the agreement has been
executed and recorded. If construction begins without the required agreement, Pioneer Irrigation
District will pursue judicial relief to stop the construction.
Plans must be received by Pioneer Irrigation District by December 15th, 2007. All construction
which may impact District facilities must be completed prior to the March 15th, 2008 deadline.
The construction time-frame which Pioneer Irrigation District allows is November 1st of the
current year to March 15th of the following year.
Any proposed development which will have downstream waterusers using gravity flow irrigation must
develop their irrigation system in a manner which will insure the downstream waterusers the ability to
acquire at least as much irrigation water for gravity flow irrigation as what they received prior to any
development or construction taking place. The gravity flow irrigation system must be totally separate
from the proposed pressurized irrigation system within a subdivision.
Please be advised, the developer shall submit detailed drawings of any proposed relocations of
Pioneer Irrigation District's facilities, prior to preliminary plat approval. Any said relocations are
subject to approval from the Superintendent and/or the Board of Directors of Pioneer Irrigation District
Any construction that impacts Waters of the United States may require obtaining a 404 permit from
the Corp of Engineers. Greg Martinez of the Corp of Engineers can be contacted at 345-2154.
Prior to finalization of any Agreements with Pioneer Irrigation District, Pioneer Irrigation District must
receive a copy of a 404 permit that has been properly executed. If it is determined by the Corp of
Engineers that a 404 permit is not required, Pioneer Irrigation District must be notified in writing by the
Corp of Engineers that said 404 permit is not required.
NOTE: This letter does not authorize any construction to commence until all the necessary
agreements with Pioneer Irrigation District have been executed and recorded.
If you have any ques '•n or comments, please do not hesitate to call.
Sincere y, ;
Mark F. Zirschky
Assistant Superintendent