Loading...
HomeMy WebLinkAbout03 Public Agency PUBLIC AGENCY ITEM DATE SUBMITTED BY I) ,(,-,, - k ff\-1--7t, cb ' k ' D8 , 1 V' ø-i4 ---- 2 ,'S C ' i % V - , � . C -- 014La 'CP- 90 4) kjb 1 1 Memorandum To: Anne Marie Skinner, Senior Planner From: Larry Osgood, City Engineer Tim King, Engineering Tech II Re: SUP 315-08 (Caldwell Urban Renewal Agency) Date: August 8, 2008 The Engineering Department provides the following comments on a request by Caldwell Urban Renewal Agency, Norfleet Developments LLC, and Treasure Valley Community College for special use permit approval for a community college in a C-2 Community Commercial zone. The site is located on the south side of Thomas Jefferson Street approximately 240 east of Smeed Parkway. Rights-of-Way 1. Adam Smith Street is a non-classified street. A twenty-eight (28) foot one-half width right-of- way exists along the subject properties Adam Smith Street frontage. Additional right-of-way will not be required at this time. 2. Thomas Jefferson Street is a non-classified street. A twenty-eight (28) foot one-half width right- of-way exists along the subject properties Thomas Jefferson Street frontage. Additional right-of- way will not be required at this time. Street 1. The existing frontage improvements along Adam Smith Street and Thomas Jefferson Street meet city standards. Additional improvements will not be required at this time. Water 1. The applicant shall be required to connect to the City of Caldwell Municipal Water System. Water is available from an 8" line in both Adam Smith Street and Thomas Jefferson Street. 2. The location of water service, including sizing of mains, providing of easements, frontage construction, and offsite construction are to be decided during review of improvement plans. Sewer 1. The applicant shall be required to connect to city services.Sewer is available from mainlines in both Adam Smith Street and Thomas Jefferson Street. Page 1 of 3 2. Any easements for sewer lines not in the right-of-way should be at a width sufficient to construct same and not less than 20 feet in width. Easements for adjacent sewer and water lines not in the right-of-way shall be at a width sufficient to construct the same and shall be no less than 30 feet in width. 3. The location of sewer service, including sizing of mains, providing of easements, frontage construction, and offsite construction are to be decided during review of improvement plans. Traffic Mitigation 1. The applicant shall be required to participate in a traffic study commissioned by the City of Caldwell to determine what if any, traffic impacts may result from the additional daily transportation on the adjoining streets and intersections requiring transportation mitigation. The applicant will be required to share a proportionate cost of the required improvements (if applicable). Storm Drain 1. Provision is to be made for the disposal of stormwater drainage in accordance with the City Stormwater Management Manual and any updates adopted subsequent to this application. A copy of this policy is available upon request. The engineer of record is to provide calculations, which indicate that the assumptions in his stormwater drainage plan comply with the requirements of the Stormwater Manual. Irrigation 1. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation District sources. General 1. Construction of facilities to be dedicated and/or within public right-of-way shall be performed by an appropriately licensed public works contractor and constructed to City of Caldwell specifications. 2. Prior to commencement of construction in any dedicated right-of-way, or construction of any improvement intended for dedication to the City or connected to a City facility, the City Engineering staff is to be notified. This preferably will take place in a pre-construction conference scheduled by the engineer of record in which all appropriate personnel and utilities are present. Appropriate City personnel are to be notified in advance of all testing (including compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of the testing. The engineer of record or his designated representative is to witness all tests and a log of inspection visits and testing results is to be kept by the engineer of record or his representative. 3. The developer is to employ a responsible design professional, preferably the engineer of record, to oversee and inspect construction, to perform and/or observe all requisite testing of Page 2 of 3 completed facilities, and to certify that improvements have been constructed according to approved plans and in compliance with applicable City, State, and Federal standards. 4. The engineer of record shall be held responsible to ensure that the developments improvements are in substantial compliance with said engineer's design. Following the construction of the developments improvements, the developers engineer shall provide the City of Caldwell Engineering Department with electronic and reproducible Mylar As-built plans suitable for blue-line reproduction for future reference and to establish that the engineer of record has caused construction to occur in substantial compliance with the design of said engineer of record. 5. Any note, item or drawing element on the plats, construction drawings, engineering drawings and/or design drawings related to the property inconsistent with City Codes, Policies and/or Ordinances shall not be construed as approved unless specifically addressed and granted by City Council as a variance. Page 3 of 3 08/12/2008 14:47 FAX 2084594491 PIONEER IRRIGATION - CALDVVELL P Z 2001/002 Pioneer Irrigation District ,Ce) • JEFF SCOTT P.O. BOX 426 • CALDWELL, IDAHO 83606 Superintendent (208)459-3617 MARK ZIRSCHKY NAIDA KELLEHER • Asst.Superintendent Secretary-Treasurer August 12, 2008 City of Caldwell Community Development Department Fax: 455-3050 Attn: Anne Marie Skinner Re: Case No. SUP-315-08 (Treasure Valley Community College) Special Use Permit TO WHOM IT MAY CONCERN: All existing easements, right-of-ways, and other means used to honor the water rights to downstream waterusers' must be maintained and allowed to continue to exist. It is imperative that no one disrupt the delivery of water to a downstream water user. Any lateral, canal, drain or other means used to deliver water, along which there is a right-of-way or easement, must have the same kept clear of all obstructions at all times. No fences, structures, or other materials are allowed on any of the District's easements or right-of-ways AND they must be recorded on the final plat. The Horton (400) Lateral has a 16 foot from top of bank prescriptive use easement along both sides of the Lateral. There are to be no pathways within Pioneer lrrltlation District easements. Any discharge or run-off into a federal drain must meet the approval of Lupe Rodriguez of the Bureau of Reclamation. Pioneer Irrigation District does not assume any responsibility for such an approval. Her telephone number is 383-2221. The A Drain (Pioneer Irrigtion District Drain) has a 110 foot Right of Way, 55 feet from centerline of drain. There is to be no obstructions, fences, buildings, walk paths, etc. within said right of way. There is to be no storm water discharge into the A Drain. Please be advised that NO change to or crossing of a District facility can take place unless a License Agreement or Crossing Agreement between the District and the owner/developer of the property has been signed and recorded. Please contact the District's Attorney, Scott L. Campbell, in writing if you need to obtain such an agreement. His contact information is: Scott L. Campbell, Moffatt Thomas Barrett Rock & Fields, Chtd., 101 S. Capitol Blvd., 10th Floor, Boise, Idaho 83702, phone: (208) 3452000, fax: (208) 385-5384. A License Agreement or Crossing Agreement must be written up and recorded at the expense of the Developer and/or owner, All agreements must be reviewed by and approved by Mr. Campbell. The least expensive way to have an agreement drawn up which meets the need of the District is by having Mr. Campbell himself draw it up. Otherwise there will be two attorney fees for said developer and/or owner to pay. A deposit of $1000,00 must be paid to Moffatt, Thomas to cover the attorney fees before the work can begin. Any unexpended portion of the deposit will be refunded. Pioneer Irrigation District will recommend disapproval of the final plat approval,•until the agreement has been executed and recorded, If construction begins without the required agreement, Pioneer't Irrigation District will pursue judicial relief to stop the construction. • . p -2.-- 08/12/2008 14:47 FAX 2084594491 PIONEER IRRIGATION CALDWELL P Z 19002/002 Plans must be received by Pioneer Irrigation District by December 15th, 2008. All construction which may impact District facilities must be completed prior to the March 15th, 2009 deadline. The construction time- frame which Pioneer Irrigation District allows is November 1st of the current year to March 15th of the following year. Ten percent(10%) of the P1D project costs, as determined by Pioneer Irrigation Districts engineer, shall be deposited with Pioneer, in the form of a cashier's check, payable to Pioneer irrigation District, at the time of execution of the agreement by the Developer/Land Owner. Pioneer shall refund this deposit if the construction is completed by March 15th, and in accordance with the terms of the agreement, otherwise the deposit shall be forfeited to Pioneer Irrigation District. If construction is not completed by March 151h in a manner which allows for adequate delivery of water, Pioneer will 6 intervene and perform whatever work is necessary to allow adequate delivery of water to patrons. This work will be performed at the convenience and discretion of Pioneer Irrigation District. The Developer/Land Owner shall pay the costs of this remedial work. Any proposed development which will have downstream waterusers using gravity flow irrigation must develop their irrigation system in a manner which will insure the downstream waterusers the ability to acquire at least as much irrigation water for gravity flow irrigation as what they received prior to any development or construction taking place. The gravity flow irrigation system must be totally separate from the proposed pressurized irrigation system within a subdivision. Please be advised, the developer shall submit detailed drawings of any proposed relocations of Pioneer Irrigation District's facilities, prior to preliminary plat approval. Any said relocations are subject to approval from the Superintendent and/or the Board of Directors of Pioneer Irrigation District Any construction that impacts Waters of the United States may require obtaining a 404 permit from the Corp of Engineers. Greg Martinez of the Corp of Engineers can be contacted at 3452154, Prior to finalization of any Agreements with Pioneer Irrigation District, Pioneer Irrigation District must receive a copy of a 404 permit that has been properly executed. If it is determined by the Corp of Engineers that a 404 permit is not required, Pioneer Irrigation District must be notified in writing by the Corp of Engineers that said 404 permit is not required. NOTE: This letter does not authorize any construction to commence until all the necessary agreements ' with Pioneer Irrigation District have been executed and recorded. If you have any question or comments, please do not hesitate to call. Sinc rel . AV./ Mark F. Zirschky Assistant Superintendent cc: Gordon Law—City of Caldwell Engineering via fax 455-3012 SUP-315-08 Norfleet Developments Page 1 of 1 Anne Marie. Skinner From: Larry Strough [Larry.Strough @itd.idaho.gov] Sent: Wednesday, August 20, 2008 10:13 AM To: Anne Marie. Skinner Cc: Pam Golden Subject: SUP-315-08 Norfleet Developments We have no comment on the enclosed notice. Thank You. «SKMBT_C25008082010060.pdf» 8/20/2008