Memorandum
To: Anne Marie Skinner, Senior Planner
From: Larry Osgood, City Engineer
Tim King, Engineering Tech II
Re: SUP 315-08 (Caldwell Urban Renewal Agency)
Date: August 8, 2008
The Engineering Department provides the following comments on a request by Caldwell Urban
Renewal Agency, Norfleet Developments LLC, and Treasure Valley Community College for special
use permit approval for a community college in a C-2 Community Commercial zone. The site is
located on the south side of Thomas Jefferson Street approximately 240 east of Smeed Parkway.
Rights-of-Way
1. Adam Smith Street is a non-classified street. A twenty-eight (28) foot one-half width right-of-
way exists along the subject properties Adam Smith Street frontage. Additional right-of-way will
not be required at this time.
2. Thomas Jefferson Street is a non-classified street. A twenty-eight (28) foot one-half width right-
of-way exists along the subject properties Thomas Jefferson Street frontage. Additional right-of-
way will not be required at this time.
Street
1. The existing frontage improvements along Adam Smith Street and Thomas Jefferson Street
meet city standards. Additional improvements will not be required at this time.
Water
1. The applicant shall be required to connect to the City of Caldwell Municipal Water System.
Water is available from an 8" line in both Adam Smith Street and Thomas Jefferson Street.
2. The location of water service, including sizing of mains, providing of easements, frontage
construction, and offsite construction are to be decided during review of improvement plans.
Sewer
1. The applicant shall be required to connect to city services.Sewer is available from mainlines
in both Adam Smith Street and Thomas Jefferson Street.
Page 1 of 3
2. Any easements for sewer lines not in the right-of-way should be at a width sufficient to
construct same and not less than 20 feet in width. Easements for adjacent sewer and water
lines not in the right-of-way shall be at a width sufficient to construct the same and shall be
no less than 30 feet in width.
3. The location of sewer service, including sizing of mains, providing of easements, frontage
construction, and offsite construction are to be decided during review of improvement plans.
Traffic Mitigation
1. The applicant shall be required to participate in a traffic study commissioned by the City of
Caldwell to determine what if any, traffic impacts may result from the additional daily
transportation on the adjoining streets and intersections requiring transportation mitigation. The
applicant will be required to share a proportionate cost of the required improvements (if
applicable).
Storm Drain
1. Provision is to be made for the disposal of stormwater drainage in accordance with the City
Stormwater Management Manual and any updates adopted subsequent to this application. A
copy of this policy is available upon request. The engineer of record is to provide calculations,
which indicate that the assumptions in his stormwater drainage plan comply with the
requirements of the Stormwater Manual.
Irrigation
1. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation
District sources.
General
1. Construction of facilities to be dedicated and/or within public right-of-way shall be performed by
an appropriately licensed public works contractor and constructed to City of Caldwell
specifications.
2. Prior to commencement of construction in any dedicated right-of-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified. This preferably will take place in a pre-construction
conference scheduled by the engineer of record in which all appropriate personnel and utilities
are present. Appropriate City personnel are to be notified in advance of all testing (including
compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of
the testing. The engineer of record or his designated representative is to witness all tests and a
log of inspection visits and testing results is to be kept by the engineer of record or his
representative.
3. The developer is to employ a responsible design professional, preferably the engineer of
record, to oversee and inspect construction, to perform and/or observe all requisite testing of
Page 2 of 3
completed facilities, and to certify that improvements have been constructed according to
approved plans and in compliance with applicable City, State, and Federal standards.
4. The engineer of record shall be held responsible to ensure that the developments
improvements are in substantial compliance with said engineer's design. Following the
construction of the developments improvements, the developers engineer shall provide the City
of Caldwell Engineering Department with electronic and reproducible Mylar As-built plans
suitable for blue-line reproduction for future reference and to establish that the engineer of
record has caused construction to occur in substantial compliance with the design of said
engineer of record.
5. Any note, item or drawing element on the plats, construction drawings, engineering drawings
and/or design drawings related to the property inconsistent with City Codes, Policies and/or
Ordinances shall not be construed as approved unless specifically addressed and granted by
City Council as a variance.
Page 3 of 3
08/12/2008 14:47 FAX 2084594491 PIONEER IRRIGATION - CALDVVELL P Z 2001/002
Pioneer Irrigation District
,Ce)
•
JEFF SCOTT P.O. BOX 426 • CALDWELL, IDAHO 83606
Superintendent (208)459-3617
MARK ZIRSCHKY NAIDA KELLEHER •
Asst.Superintendent Secretary-Treasurer
August 12, 2008
City of Caldwell Community Development Department
Fax: 455-3050
Attn: Anne Marie Skinner
Re: Case No. SUP-315-08 (Treasure Valley Community College) Special Use Permit
TO WHOM IT MAY CONCERN:
All existing easements, right-of-ways, and other means used to honor the water rights to downstream waterusers'
must be maintained and allowed to continue to exist. It is imperative that no one disrupt the delivery of water to a
downstream water user.
Any lateral, canal, drain or other means used to deliver water, along which there is a right-of-way or easement,
must have the same kept clear of all obstructions at all times. No fences, structures, or other materials are allowed
on any of the District's easements or right-of-ways AND they must be recorded on the final plat. The Horton (400)
Lateral has a 16 foot from top of bank prescriptive use easement along both sides of the Lateral.
There are to be no pathways within Pioneer lrrltlation District easements.
Any discharge or run-off into a federal drain must meet the approval of Lupe Rodriguez of the Bureau of
Reclamation. Pioneer Irrigation District does not assume any responsibility for such an approval. Her telephone
number is 383-2221. The A Drain (Pioneer Irrigtion District Drain) has a 110 foot Right of Way, 55 feet from
centerline of drain. There is to be no obstructions, fences, buildings, walk paths, etc. within said right of way. There
is to be no storm water discharge into the A Drain.
Please be advised that NO change to or crossing of a District facility can take place unless a License Agreement or
Crossing Agreement between the District and the owner/developer of the property has been signed and recorded.
Please contact the District's Attorney, Scott L. Campbell, in writing if you need to obtain such an agreement. His
contact information is: Scott L. Campbell, Moffatt Thomas
Barrett Rock & Fields, Chtd., 101 S. Capitol Blvd., 10th Floor, Boise, Idaho 83702, phone: (208) 3452000, fax:
(208) 385-5384.
A License Agreement or Crossing Agreement must be written up and recorded at the expense of the Developer
and/or owner, All agreements must be reviewed by and approved by Mr. Campbell. The least expensive way to
have an agreement drawn up which meets the need of the District is by having Mr. Campbell himself draw it up.
Otherwise there will be two attorney fees for said developer and/or owner to pay. A deposit of $1000,00 must be
paid to Moffatt, Thomas to cover the attorney fees before the work can begin. Any unexpended portion of the
deposit will be refunded. Pioneer Irrigation District will recommend disapproval of the final plat approval,•until the
agreement has been executed and recorded, If construction begins without the required agreement, Pioneer't
Irrigation District will pursue judicial relief to stop the construction.
•
. p -2.--
08/12/2008 14:47 FAX 2084594491 PIONEER IRRIGATION CALDWELL P Z 19002/002
Plans must be received by Pioneer Irrigation District by December 15th, 2008. All construction which may
impact District facilities must be completed prior to the March 15th, 2009 deadline. The construction time-
frame which Pioneer Irrigation District allows is November 1st of the current year to March 15th of the
following year.
Ten percent(10%) of the P1D project costs, as determined by Pioneer Irrigation Districts engineer, shall be
deposited with Pioneer, in the form of a cashier's check, payable to Pioneer irrigation District, at the time of
execution of the agreement by the Developer/Land Owner. Pioneer shall refund this deposit if the construction is
completed by March 15th, and in accordance with the terms of the agreement, otherwise the deposit shall be
forfeited to Pioneer Irrigation District.
If construction is not completed by March 151h in a manner which allows for adequate delivery of water, Pioneer will 6
intervene and perform whatever work is necessary to allow adequate delivery of water to patrons. This work will be
performed at the convenience and discretion of Pioneer Irrigation District. The Developer/Land Owner shall pay the
costs of this remedial work.
Any proposed development which will have downstream waterusers using gravity flow irrigation must develop their
irrigation system in a manner which will insure the downstream waterusers the ability to acquire at least as much
irrigation water for gravity flow irrigation as what they received prior to any development or construction taking place.
The gravity flow irrigation system must be totally separate from the proposed pressurized irrigation system within a
subdivision.
Please be advised, the developer shall submit detailed drawings of any proposed relocations of Pioneer Irrigation
District's facilities, prior to preliminary plat approval. Any said relocations are subject to approval from the
Superintendent and/or the Board of Directors of Pioneer Irrigation District
Any construction that impacts Waters of the United States may require obtaining a 404 permit from the Corp of
Engineers. Greg Martinez of the Corp of Engineers can be contacted at 3452154,
Prior to finalization of any Agreements with Pioneer Irrigation District, Pioneer Irrigation District must receive a copy
of a 404 permit that has been properly executed. If it is determined by the Corp of Engineers that a 404 permit is
not required, Pioneer Irrigation District must be notified in writing by the Corp of Engineers that said 404 permit is
not required.
NOTE: This letter does not authorize any construction to commence until all the necessary agreements '
with Pioneer Irrigation District have been executed and recorded.
If you have any question or comments, please do not hesitate to call.
Sinc rel .
AV./
Mark F. Zirschky
Assistant Superintendent
cc: Gordon Law—City of Caldwell Engineering via fax 455-3012
SUP-315-08 Norfleet Developments Page 1 of 1
Anne Marie. Skinner
From: Larry Strough [Larry.Strough @itd.idaho.gov]
Sent: Wednesday, August 20, 2008 10:13 AM
To: Anne Marie. Skinner
Cc: Pam Golden
Subject: SUP-315-08 Norfleet Developments
We have no comment on the enclosed notice. Thank You. «SKMBT_C25008082010060.pdf»
8/20/2008