To: Anne Marie Skinner
Senior Planner
Date: 02/16/2009
Re: SUP-323-09
Grace Community Church
Dba: Living Water Worship Center
The Caldwell Fire Department has no specific concerns regarding this SUP. Fire sprinklers will
be required with at least two on-site fire hydrants. A remoted PIV might be in order due to the
limited access situation. The fire lane will need to extend from 10th Avenue to the church, extend
northward around the corner to the northwest corner of the building. The fire lane will be 20'
wide and completely unobstructed, and have a vertical clearance of 13'-6". Other issues will
become apparent with the submittal of the construction documents and plot plan; they will be
addressed at that time.
Respectfully submitted,
Dennis C. Wilson
Plans Examiner
and
Doug Brown
Deputy Chief/Fire Marshal
Caldwell Rural FPD
310 S. 7th Ave.
Caldwell, ID 83605
208-455-3032
dbrown(a�ci.caldwell.id.us <mailto:dbrown(a ci.caldwell.id.us>
1
Memorandum
To: Community Development
From: Gordon Law, City Engineer
Tim King, Engineering Tech II
Re: SUP 323-09 Living Water Worship Center
Date: February 27, 2009
The Engineering Department provides the following comments on a request by Grace Community
Church dba Living Water Worship Center and Eldorado Development for a Special Use Permit to
allow a church in an R-1 Single Family Residential zone. The site is located on the west side of
South 10Th Avenue approximately 180 feet north of Pat Lane.
Development Plans
1. Development Plans— Prior to commencing construction, plans must be prepared by the
developer's engineer and approved by the City Engineering Department which shall include the
following items:
a. Street section and alignment (including curb and gutter);
b. Sidewalk (5 foot on South 10th Avenue);
c. Sanitary sewer(per City and DEQ requirements);
d. Potable water (per City and DEQ requirements);
e. Stormwater facilities (per City Policy);
f. Street lighting (per City& Idaho Power requirements);
g. Street signage (per City and MUTCD requirements);
h. Irrigation system (per Caldwell Municipal Irrigation District requirements);
i. Vertical Datum based on NAVD 88 Datum.
Irrigation
1. The development is to include a non-potable water pressure irrigation system. The design of
this pressure irrigation system is to be reviewed and approved by the Caldwell Municipal
Irrigation District prior to construction plan approval. It shall be required that the system will be
operated and maintained by the Caldwell Municipal Irrigation District.
Page 1 of 4
16 3,\\
2. Pump stations shall be located within a recorded perpetual easement sufficient for convenient
access and maintenance of said pump station.
3. Supplying irrigation district shall approve the location of the delivery point and the design of
any structure intended for construction within their facilities. Said construction shall occur
within the districts seasonal time parameters.
4. The applicant shall ensure that an adequate continuous irrigation supply flow is available to
meet the pressure irrigation system requirements.
5. Irrigation facilities shall be located outside the public-right-of-way and shall be moved, adjusted
and/or improved as necessary to facilitate required street improvements.
6. The developer shall maintain any existing upstream drainage rights and downstream
irrigation water supply rights across the property. During the design phase of this project,
the developer or his engineer is to contact the appropriate irrigation district to help ascertain
these rights. These rights shall be shown in full, topographically, and submitted for review
along with the developments proposed construction drawings. Appropriate facilities to
convey irrigation and drainage water across the property to take care of any offsite needs
shall be included. Existing irrigation facilities shall be relocated out side the public right-of-
way. There is to be no discharge of gravity irrigation return water into the storm water
system.
7. Letter(s) are to be obtained from the appropriate irrigation district(s) indicating their
concurrence with the design and facilities that preserve any upstream drainage rights and
downstream irrigation water supply rights crossing the property.
Storm Drain
1. As noted previously, provision is to be made for the disposal of stormwater drainage in
accordance with the City Stormwater Management Manual and any updates adopted
subsequent to this application. It is to be noted that retention designs will be denied in most
instances. A copy of this policy is available upon request. The engineer of record is to provide
calculations, which indicate that the assumptions in his stormwater drainage plan comply with
the requirements of the stormwater manual
Rights-of-Way
1. South 10th Avenue is classified as a Minor Arterial. The applicant shall be required to dedicate
as public right-of-way a forty (40) foot one half width right-of-way along the South1 Oth Avenue
frontage (minus existing)to meet City of Caldwell requirements.
Street
1. The applicant shall improve South 10th Avenue to include a 26.0 foot half- width street section
center-line to back of curb and 5 foot sidewalk. The street shall feature standard vertical curb
and gutter, 5 foot sidewalks, sub-base and asphalt paving, required storm water drainage
Page 2 of 4
facilities and streetlights. These improvements are to extend the entire length of the subject
property.
2. Any approaches on South 10th Avenue will be required to comply with ACHD intersection and
driveway spacing and alignment standards as adopted by the City of Caldwell at a minimum.
The proposed access points do not meet these requirements.
Sanitary Sewer
1. The site will be required to comply with the Dixie Master Plan as updated which requires a 10"
trunk line to be constructed along the 10th Ave frontage. The location of sewer service,
including sizing of mains, providing of easements, frontage construction, and offsite
construction are to be decided during review of improvement plans.
Water
2. Water is available from a 12" waterline adjacent to the subject properties easterly boundary in
South 10th Ave.
1. All on site water mains may need to be looped into existing mains for fire flow and water
quality purposes. Internal main sizing and construction plan approval, will be dependent upon
the availability of fire flow.
2. The location of water service and providing of easements are to be decided during review of
improvement plans.
General
1. Construction of dedicated facilities or construction within any dedicated right-of-way is to be
performed by an appropriately licensed public works contractor and shall comply with
applicable City, State, and Federal standards.
2. Prior to commencement of construction in any dedicated right-of-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified.
3. All traffic control for the project shall meet the requirements of the Manual on Uniform Traffic
Control Devices (M.U.T.C.D.) and the City Engineer. The contractor shall provide a traffic
control plan to the City Engineer for review prior to any construction within the right-of-way.
4. Prior to commencement of construction in any dedicated right-of-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified. This preferably will take place in a pre-construction
conference scheduled by the engineer of record in which all appropriate personnel and utilities
are present. Appropriate City personnel are to be notified in advance of all testing (including
compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of
the testing. The engineer of record or his designated representative is to witness all tests and a
Page 3 of 4
log of inspection visits and testing results is to be kept by the engineer of record or his
representative.
5. Appropriate easements for drains, canals or supply ditches, transmission lines, and other
utilities shall be clearly indicated on the submitted construction drawings.
6. No structures shall be placed within easements.
7. Any note, item or drawing element on the plats, construction drawings, engineering drawings
and/or design drawings related to the property inconsistent with City Codes, Policies and/or
Ordinances shall not be constructed as approved unless it has been specifically addressed and
granted by City Council as a variance