Loading...
HomeMy WebLinkAbout03 Public Agency PUBLIC AGENCY SUBMITTED BY DATE 111,10111111 III Anne Marie Skinner Senior Planner and Project Coordinator 06/01/2010 Re. SUP-334-10 :nd SUP-335-10 Anne Marie, This office has no objections or concerns to SUP-334 and/or SUP-335. © Thank you, Dennis. )9Ji Memorandum To: Community Development From: Ricardo Calderon, Associate Engine r Tim King, Engineering Tech II Re: SUP 334-10 Clearwire, Storage West and Jason Evans Date: May 28, 2010 The Engineering Department provides the following comments on a request by Storage West, Clearwire and Jason Evans for special use permit approval to locate a new, wireless communication facility on leased land owned by Storage West. The site is located at the southwest corner of 4224 Dearborn Street. Rights-of-Way 1. Dearborn Street is non-classified. The owner shall be required to dedicate as public right-of- way a forty (40) foot one-half width right-of-way along the Dearborn Street frontage (minus existing) to meet City of Caldwell requirements. 2. Everett Street is non-classified. The owner shall be required to dedicate as public right-of-way a forty (40) foot one-half width right-of-way along the Everett Street frontage (minus existing) to meet City of Caldwell requirements. Water 1. Water is available from 6" lines in both Dearborn Street and an 8" line in Everett Street. Sewer 1. Sewer is available from a 21" line in Everett Street. Irrigation 1. Irrigation water for any and all landscaping shall be obtained from applicable Irrigation District sources. City municipal water may be used only if the criteria specified in the Landscape Ordinance Section 10-07-12 are met. General Page 1 of 2 1. Prior to commencement of construction in any dedicated right-of-way, or construction of any improvement intended for dedication to the City or connected to a City facility, the City Engineering staff is to be notified. This preferably will take place in a pre-construction conference scheduled by the engineer of record in which all appropriate personnel and utilities Appropriate City personnel are to be notified in advance of all required inspections. 2. Appropriately licensed public works contractors shall perform all construction within public right-of-way. 3. All traffic control for the project shall meet the requirements of the Manual on Uniform Traffic Control Devices (M.U.T.C.D.) and the City Engineer. The contractor shall provide a traffic control plan to the City Engineer for review and secure an appropriate right-of-way permit prior to any construction within the right-of-way. Page 2 of 2