Loading...
HomeMy WebLinkAbout03 Public Agency PUBLIC AGENCY ITFM�`,___ DATE SUBMITTED BY ry\t,t w3 B - 2.01-1 k,__17_1(4 _5:%1 .4\r\p„- T -3 E .D.itry_i_w_i_ge?,,I../3 r tOAH0 IDAHO TRANSPORTATION DEPARTMENT F? ,Box 8028 (208) 334-8300 Boise, ID 83707-2028 Itd.Icfah€�.00 October 20, 2014 April Cabello City of Caldwell Planning and Zoning Department 621 East Cleveland Boulevard Caldwell, ID 83605 VIA EMAIL RE: SUP-08-14 CAR LOT AT 410 S. 1ST AVE. The Idaho Transportation Department(ITD) has reviewed the referenced special use application for Fast Lane Auto Sales at 410 S. 1st Ave south of Hwy 19. ITD has the following comments: 1. ITD has no objection to this application and requires no mitigation. 2. No new access to Hwy 19 is requested and none is granted with this application. 3. ITD has comprehensive rules governing outdoor advertising (IDAPA 39.03.60). IDAPA 39.04.32 also requires that signs not"dazzle or blind" drivers. The current trend toward high intensity signs has caused an increasing number of driver complaints on urban segments of the State Highway System. This applicant should be aware of the issue and plan the site's signing and lighting strategies accordingly. If you have any questions, you may contact Shona Tonkin at 334-8341 or me at 332-7191. Sincerely, 0 . ,- '41 *4.4.,0------- James K. Morrison Development Services Manager jim.morrison gitd.idaho.gov .A. , I Jarom Wagoner From: Sylvia Bahem Sent: Friday, October 17, 2014 1:43 PM To: Jarom Wagoner Cc: Dave Wright Subject: RE: Public Agency Memo -SUP-08-14 Nordberg Special Use We would ask that a requirement of granting this SUP is that he be required to maintain the property, i.e.,weeds and goatheads. This property was written up numerous times between 09/14/2005 and 08/15/2012 by the Police Department and they were always very slow to clean up the property. Thanks, Syz &h.=z #167 Caldwell Police Department Operations Division 110 S. 5th St. Caldwell, Idaho 208-455-4592 From: Dave Wright Sent: Friday, October 17, 2014 10:32 AM To: Sylvia Bahem Subject: FW: Public Agency Memo - SUP-08-14 Nordberg Special Use Dave Wright Lieutenant Caldwell City Police Department Office :208-455-4514 Fax: 208-455-3123 email:dwright @cityofcaldwell.org This email for Law Enforcement use only PRIVILEGED/CONFIDENTIAL INFORMATION may be contained in this message. The information in this e- mail correspondence is intended for the use of the individual or entity to whom it is addressed. If you are not the intended recipient, you are hereby notified that any disclosure, duplication, distribution, or the taking of any action in reliance of this correspondence is strictly prohibited. If you received this correspondence in error, please notify the sender by reply e- mail or phone and destroy any and all copies of the correspondence. Thank You From: April Cabello Sent: Friday, October 17, 2014 10:30 AM To: Robb MacDonald; Andy Cater; Jody Brazelton; Dave Wright; mark.wasdahl @itd.idaho.gov Subject: Public Agency Memo - SUP-08-14 Nordberg Special Use Hello, Please see the attached public agency memo. Jarom Wagoner From: Robb MacDonald Sent: Monday, November 03,2014 4:38 PM To: Jarom Wagoner Subject: FW: Public Agency Memo-SUP-08-14 Nordberg Special Use Attachments: PUBLIC AGENCY MEMO-SUP-08-14.pdf Jarom, As per the letter dated Jan 15, 2004 from Scott Woods to Mr. Nordberg, there were several engineering requirements that were either never completed or not addressed in their entirety.These requirements must be addressed before the engineering department can sign off on this project. those requirements are outlined and attached to that letter. thanks Robb MacDonald, P.E. Assistant City Engineer City of Caldwell Engineering Department Ph: (208)455-3006 Fx: (208)455-3012 From: April Cabello Sent: Friday, October 17, 2014 10:30 AM To: Robb MacDonald; Andy Cater; Jody Brazelton; Dave Wright; mark.wasdahl @itd.idaho.gov Subject: Public Agency Memo - SUP-08-14 Nordberg Special Use Hello, Please see the attached public agency memo. Please direct all responses or questions directly to Jarom Wagoner via email: jwagoner @cityofcaldwell.org Thank you, April Cabello Planning Technician City of Caldwell (208)455-4667 phone (208)455-3050 fax acabello@cityofcaldwell.org 1 '4,73 GNI.DW f< ®fce II# Tfty ngixmPer 04 C, lll��� 1. " I 1i rii j �{.lubIir li�: 1rr 4+r . 11111 top, •4l s AIoe nOw GORDON N. LAW, P.E. CITY OF CALDWELL City of Caldwell 621 Cleveland Blvd. P.O.Box 1177 Caldwell,Idaho 83605 Caldwell,Idaho 83606-1177 - January 15, 2004 PHONE(208)455-3000 BUS. 208/455-3006 FAX(208)455-3012 Richard A.Nordberg 410 S. 1st Ave. Caldwell,ID 83605 Re: Bird Dog Auto Sales Inc.at 410 S.1s`Avg. Dear Mr.Nordberg, The purpose of this letter is to let you know that the City of Caldwell has noticed you are occupying the Bird Dog Auto Sales Inc. at 410 S. 1' Ave. without a certificate of occupancy. After reviewing our files we still do not have a bond for the remaining improvements, and you still have not completed the requirements for a temporary certificate of occupancy. In order for the City of Caldwell Engineering Department to sign off on the certificate of occupancy we need the sidewalk and pedestrian ramps repaired or replaced. I have attached the engineering requirements dated June 17, 2003 which were attached to the building permit, letter dated July 1, 2003 stating what was needed for a temporary certificate of occupancy,and a copy of the section of city code 12-01-17 explaining why you need a certificate of occupancy. If you fail to comply with engineering requirements by the 16th of February 2004, we will have no alternative but to forward this issue to Darrell Mayes, the Building Official, and the City of Caldwell Attorney. Please do not hesitate to contact Darrin Hibbs or myself should you have any further questions or concerns. We can be reached during normal business hours at 455-3006. Sincerely, f--\ 4. U■.J`"/, Scott A. Woods Engineering Director of New Development, Cc: Darrell Mayes,Building Official Steve Hasson,Community Development Director Gordon Law,City Engineer Ben Weymouth,Assistant City Engineer Garret Nancolas,Mayor CR X•12") Gptow f,,, (I ffire of ( itg littgiiteer 24110■10„. &- co Vi- .0 A, ._ public Ic II m105 PirEttor II -tom. dl-....,700 ff` GORDON N. LAW, P.E. CITY OF CALDWELL City of Caldwell 621 Cleveland Blvd. P.O.Box 1177 Caldwell,Idaho 83605 Caldwell.Idaho 83606-1177 PHONE(208)455-3000 BUS. 208/455-3006 FAX(208)455-3003 ENGINEERING DEPARTMENT REQUIREMENTS June 17,2003 PROJECT: Bird Dog Auto Sales,Inc. LOCATION: 4105 S. 1st Ave. OWNER: Richard A.Nordberg ARCHITECT: Thomas R.Ensley and Assoc. ENGINEER: N/A The following requirements shall be met during construction and prior to the issuance of a Certificate of Occupancy: 1. The site plan that was done by Thomas R.Ensley and Associates for Mr.Nordberg and submitted with Mr.Nordbergs building permit application details the construction of an asphalt parking surface being placed in all areas of the site with the exclusion of the landscaped areas and the on- site office space. *Facilities for storm water management for the project site shall be designed by a licensed engineer per the City of Caldwell Storm Water Management Policy and constructed per the approved plans. Please provide a detailed storm water design,including site grading.that provides all required information and calculations for sizing and design of the facility.The City of Caldwell Engineering Department shall be notified for inspection of all stormwater facilities being constructed. Contractors shall give the City a minimum of 24 hours advance notice of any required inspections. 2. The Applicant will be required to provide the City with a site plan that accurately and correctly depicts the existing site conditions in order for a complete review and approval of the building permit application. The submitted site plan does not show existing structures, i.e.irrigation boxes, power poles,and trees. The site plan also incorrectly depicts the location of the driveway that takes approach onto lu Ave. 3. **The applicant will be required to construct frontage improvements in accordance with the City of Caldwell standards and specifications. Frontage improvements are required to be done in the best interest of the health,safety and welfare of the citizens of Caldwell. The following is a detailed list of site frontage improvements that will be required by the City prior to the issuance of a certificate of occupancy: 1 of 3 1. All sections of the sidewalk along Cleveland Blvd.that are in a state of disrepair will need to be repaireeL'replaced to meet City of Caldwell standards. 2. The addition of a pedestrian ramp will be required to be constructed per City standards at the northwest corner of Cleveland Blvd.And 151 Ave. 3. A section of curb and gutter beginning at the southwest side of the existing catch basin on Cleveland Blvd.and extending approximately 6-foot to the southwest will need to be repairedireplaced. 4. Approximately 150-feet of 5-foot sidewalk will be required to be constructed along the frontage of 15'Ave.per City of Caldwell standards. 5. The existing driveway approach that fronts onto 1ST Ave.will need approximately 5-foot of curb replaced on the northwest radius,a functioning gutter plate that allows for unimpeded flow of storm water and the southwest edge of the driveway will need to be perpendicular to i5'Ave.and winged per City of Caldwell standards. 6. Approximately 8-foot of curb and gutter will need to be replaced starting from the point of curvature on the northwest radius of the existing approach on 1z1 Ave.heading to the northeast. 7. The City will require that the applicant construct approximately 135-feet of 5-foot sidewalk along the frontage of Paynter Ave.per City of Caldwell standards. The construction of this sidewalk will need to terminate at the right-of-way boundary for the railroad at the northwest end of the property and at the existing approach to the alley at the southeast boundary of the site on Paynter Ave. 8. City records indicate the alley that is adjacent to the applicant's southeast property boundary is owned by the City of Caldwell. **The applicant will be required to construct road improvements along this frontage to include the alley being brought up to City of Caldwell standards for alley improvements. Improvements,at a minimum,will require that the applicant,if using the alley as a primary access,to construct a standard pavement cross-section the entire width of the alley from 1St Ave.to Paynter Ave. 4. There is currently sewer and water available to service the site. Water is available to the development in Cleveland Blvd.and sanitary sewer is available to the development by a sewer line that bisects the applicant's property at the southeast corner. **The applicant will be required to connect to these services as a condition precedent to obtaining a building permit. 5. •__ should he that there easement that bisects the southeasterly corner of J. Applicant$uvwu .,aware, u.. ..........o,...... °,:Se:^..... ._ CS e .., .. the property. This easement is subject to certain construction requirements and restraints per the City of Caldwell Zoning Ordinance. This easement needs to be shown and labeled on the revised site plan. 6. A required one-half width street right-of-way of 33-foot along Paynter Ave.(Minor Arterial)will be required to be dedicated to the City by the applicant prior to any Certificate of Occupancy being issued. Cleveland Blvd. is under Idaho Transportation Department(ITD)jurisdiction and should be solicited for comment regarding this development. 7. Appropriately licensed public works contractors shall perform all construction w^''n right-of- way. 8. Inspections of all work done in the right-of-way,including curb,gutter,driveway approach, sidewalk concrete forms,gravel placement and compaction, is required prior to pouring any concrete. 9. Contractors shall give the City a minimum of 24 hours advance notice of any required inspections. 10. All traffic control for this project shall meet the requirements of the Manual on Uniform Traffic Control Devices(M.U.T.C.D.)and the city engineer. The contractor shall provide a traffic control plan to the City Engineer for review prior to any construction within the right-of-way. 2of3 I I. Irrigation water for all proposed landscape shall be obtained from applicable Irrigation District sources. The before mentioned items are compiled from a general review of the proposed site development. This is not an all-inclusive list. Additional information and/or changes may be required upon resubmittal of required information and a revised site plan. Scott Woods—Engineering Department *City of Caldwell Stormwater Management Interim Policy dated 1998 Section 101.1.6 `Infrastructure Improvement Policy(Bill No.24 R 8.Ordinance No.1960,'`1944) 3 o f 3 (4C(1 ) ,. r ,0,Ett ®ffire of (1Lity irteE rtgr • & o 11Jublir IN oats!irth1r 1".:F' 7 ,,,, MOp'mu ohs GORDON N. LAW, P.E. CITY OF CALDWELL 621 Cleveland Blvd. City P.O. Box 11 Caldwell Caldwell.Idaho 83605 P.O. PHONE(208)455-3000 Caldwell.Idaho 83606-1177 F BUS.208/455-3006 FAX(208)455-3W3 ENGINEERING DEPARTMENT REQUIREMENTS July 1,2003 PROJECT: Bird Dog Auto Sales,Inc. LOCATION: 4105 S. 1'Ave. OWNER: Richard A.Nordberg ARCHITECT: Thomas R.Ensley and Assoc. ENGINEER: N/A Per a request by Richard Nordberg and in conjunction with the requirements letter submitted to Richard Nordberg in regards to building permit No.31350 on June 17,2003,the Engineering Department is issuing this letter by way of approval of Mr.Ben Weymouth,Assistant City Engineer. A time extension of one(1)year will be given to Mr.Nordberg to complete the requirements listed in the before mentioned letter with the following conditions attached: . 1. All public safety items listed in the before mentioned requirements letter must be completed before a temporary Certificate of Occupancy will be issued. These items consist of all sidewalk and pedestrian ramp repair or installation in the public right-of- way that present a safety hazard to the public as determined by the City Engineer. 2. The Temporary Certificate of Occupancy will only be issued after Mr.Nordberg has presented the City with a bond for all items remaining to be constructed within the one (1)year time extension. The bond must be in the form of a Cashiers Check,Letter of Credit,or a Surety. The amount of the bond and the form of the bond must be approved by the City Engineer. 41W--- on Woods—Engineering Department 1 of 1 (-. . lci.b 12-01-15 12-01-17 or as restricted in the zoning regulations', shall not be commenced until after the issuance of a written permit by the Building Official. (2) Permit to be Displayed: The person receiving such permit shall display the official permit card in front of the affected building so that the same may be seen from the street, and it shall be incumbent upon any law enforcement officer of the City to stop such building operations until such permit has been secured and displayed. (3) Plans to be Filed: No permit for construction or alteration shall be issued unless there is filed with the Building Inspector a plan for such construction or alteration which shows all buildings as now erected together with the intended improvement. (Ord. 1771, 2-2-88)--' 12-01-17: CERTIFICATE OF OCCUPANCY AND COMPLIANCE; CHANGE IN USE OF BUILDING: (1) Certificate of Occupancy and Compliance Required: No building erected or altered shall be occupied, used or changed in use or occupancy until a certificate of occupancy and compliance has been issued by the Building Inspector, stating that the building or proposed use of a building or premises complies with all the building and health laws and regulations and with the provisions of the zoning regulations of this Code. No premises shall be used or occupied or changed in the use or occupancy until a certificate of occupancy shall have been issued by the Building Inspector, stating that the proposed use of the premises complies with the zoning regulations and with the provisions of this _ -..r Code relating thereto. Before issuing such certificate, the Building Inspector may, if he desires, submit the application and all papers connected therewith to the planning and zoning commission or may submit the same directly to the City Council. (2) Record of Certificate: A record of all certificates shall be kept on file in the office of the Building Inspector, and copies shall be furnished on request to any person having a proprietary or tenancy interest in the building affected. No fee shall be charged for an original 1. See chapter 10 of this code. City of Caldwell (n 2) 12-01-17 12-01-21 certificate, but for copies of any original or subsequent certificates, there shall be a charge of one dollar ($1.00) each. (3) Change In Use Of Building: The use of a building shall not be changed from one class of use to another unless and until an application has been made to the building inspector of the city in due form, stating: A. The use of the premises at the time of application or, if vacant, its last use; B. The use it shall be put to; C. Parking requirements for proposed use; and D. Whether the proposed use of the building or premises will increase fire hazard to the premises or adjacent property. The evaluation by the chief of the fire department stating whether the proposed change will or will not increase the fire hazard must be on the application. (Ord. 1771, 2-2-1988) 12-01-19: BUILDINGS ON INDIAN CREEK; REQUIREMENTS: All buildings erected along or adjacent to Indian Creek shall be of suitable and endurable material, and the walls along the banks of said Indian Creek supporting said buildings shall be of reinforced concrete or like permanent material and shall be supported by proper footing and foundations to.comply with the building code of the city and be satisfactory to the engineer and the building inspector of the city. All such bases shall reach at least five feet (5') below the scour line of said Indian Creek. The throat of said creek, between the said walls of such building or structures, shall be at least thirty-three (33) clear lateral feet and shall be at least eight feet (8') above the bed of the stream. (Ord. 1771, 2-2-1988) 12-01-21: AMENDMENTS TO THE INTERNATIONAL BUILDING CODE AND INTERNATIONAL RESIDENTIAL CODE: 1) IBC Section 101.1, "Title" These regulations shall be known as the Building Code of the City of Caldwell, hereinafter referred to as "this Code". 2) IRC Section 101.1, "Title". These provisions shall be known as the Residential Code for One- and Two-family Dwellings of the City of February 2003 Cit'. of Caid:Lell c�GpLnw£tt (Office rtf Trig' n$t r 4' 'It R Z °p, r± ° ubIir is I LTrits Pirrrt.or vett GORDON N. LAW, P.E. CITY OF CALDWELL City of Caldwell 621 Cleveland 833605 P.O.Idaho 1177 PHONE(208)455-3000 Caldwell,Idaho 83606-1 1 77 BUS. 208/455-3006 FAX(208)455-3003 ENGINEERING DEPARTMENT REQUIREMENTS June 17,2003 PROJECT: Bird Dog Auto Sales,Inc. LOCATION: 4105 S. 15f Ave. OWNER: Richard A.Nordberg ARCHITECT: Thomas R.Ensley and Assoc. ENGINEER: N/A The following requirements shall be met during construction and prior to the issuance of a Certificate of Occupancy: 1. The site plan that was done by Thomas R.Ensley and Associates for Mr.Nordberg and submitted with Mr.Nordbergs building permit application details the construction of an asphalt parking surface being placed in all areas of the site with the exclusion of the landscaped areas and the on- site office space. *Facilities for storm water management for the project site shall be designed by a licensed engineer per the City of Caldwell Storm Water Management Policy and constructed per the approved plans. Please provide a detailed storm water design,including site grading,that provides all required information and calculations for sizing and design of the facility.The City of Caldwell Engineering Department shall be notified for inspection of all stormwater facilities being constructed. Contractors shall give the City a minimum of 24 hours advance notice of any required inspections. 2. The Applicant will be required to provide the City with a site plan that accurately and correctly depicts the existing site conditions in order for a complete review and approval of the building permit application. The submitted site plan does not show existing structures,i.e.irrigation boxes, power poles,and trees. The site plan also incorrectly depicts the location of the driveway that takes approach onto 1'Ave. 3. **The applicant will be required to construct frontage improvements in accordance with the City of Caldwell standards and specifications. Frontage improvements are required to be done in the best interest of the health,safety and welfare of the citizens of Caldwell. The following is a detailed list of site frontage improvements that will be required by the City prior to the issuance of a certificate of occupancy: 1 of 3 ?f)2— 1. All sections of the sidewalk along Cleveland Blvd.that are in a state of disrepair will need to be repaired/replaced to meet City of Caldwell standards. 2. The addition of a pedestrian ramp will be required to be constructed per City standards at the northwest corner of Cleveland Blvd.And 15'Ave. 3. A section of curb and gutter beginning at the southwest side of the existing catch basin on Cleveland Blvd.and extending approximately 6-foot to the southwest will need to be repaired/replaced. 4. Approximately 150-feet of 5-foot sidewalk will be required to be constructed along the frontage of 151 Ave.per City of Caldwell standards. 5. The existing driveway approach that fronts onto lS1 Ave.will need approximately 5-foot of curb replaced on the northwest radius,a functioning gutter plate that allows for unimpeded flow of storm water and the southwest edge of the driveway will need to be perpendicular to 151 Ave.and winged per City of Caldwell standards. 6. Approximately 8-foot of curb and gutter will need to be replaced starting from the point of curvature on the northwest radius of the existing approach on 15'Ave.heading to the northeast. 7. The City will require that the applicant construct approximately 135-feet of 5-foot sidewalk along the frontage of Paynter Ave.per City of Caldwell standards. The construction of this sidewalk will need to terminate at the right-of-way boundary for the railroad at the northwest end of the property and at the existing approach to the alley at the southeast boundary of the site on Paynter Ave. 8. City records indicate the alley that is adjacent to the applicant's southeast property boundary is owned by the City of Caldwell. **The applicant will be required to construct road improvements along this frontage to include the alley being brought up to City of Caldwell standards for alley improvements. Improvements,at a minimum,will require that the applicant,if using the alley as a primary access,to construct a standard pavement cross-section the entire width of the alley from 151 Ave.to Paynter Ave. 4. There is currently sewer and water available to service the site. Water is available to the development in Cleveland Blvd.and sanitary sewer is available to the development by a sewer line that bisects the applicant's property at the southeast corner. **The applicant will be required to connect to these services as a condition precedent to obtaining a building permit. 5. Applicant should be aware that there is a sewer easement that bisects the southeasterly corner of the property. This easement is subject to certain construction requirements and restraints per the City of Caldwell Zoning Ordinance. This easement needs to be shown and labeled on the revised site plan. 6. A required one-half width street right-of-way of 33-foot along Paynter Ave.(Minor Arterial)will be required to be dedicated to the City by the applicant prior to any Certificate of Occupancy being issued. Cleveland Blvd. is under Idaho Transportation Department(ITD)jurisdiction and should be solicited for comment regarding this development. 7. Appropriately licensed public works contractors shall perform all construction within right-of- way. 8. Inspections of all work done in the right-of-way,including curb,gutter,driveway approach, sidewalk concrete forms,gravel placement and compaction,is required prior to pouring any concrete. 9. Contractors shall give the City a minimum of 24 hours advance notice of any required inspections. 10. All traffic control for this project shall meet the requirements of the Manual on Uniform Traffic Control Devices(M.U.T.C.D.)and the city engineer. The contractor shall provide a traffic control plan to the City Engineer for review prior to any construction within the right-of-way. 2 of 3 �i� • I I. Irrigation water for all proposed landscape shall be obtained from applicable Irrigation District sources. The before mentioned items are compiled from a general review of the proposed site development. This is not an all-inclusive list. Additional information and/or changes may be required upon resubmittal of required information and a revised site plan. • Scott Woods—Engineering Department 'City of Caldwell Stormwater Manaeement Interim Policy dated 1998 Section 101.1.6 **Infrastructure Improvement Policy(Bill No.24&8.Ordinance No.1960&1944) 3 of 3