tOAH0 IDAHO TRANSPORTATION DEPARTMENT
F? ,Box 8028 (208) 334-8300
Boise, ID 83707-2028 Itd.Icfah€�.00
October 20, 2014
April Cabello
City of Caldwell Planning and Zoning Department
621 East Cleveland Boulevard
Caldwell, ID 83605
VIA EMAIL
RE: SUP-08-14 CAR LOT AT 410 S. 1ST AVE.
The Idaho Transportation Department(ITD) has reviewed the referenced special use
application for Fast Lane Auto Sales at 410 S. 1st Ave south of Hwy 19. ITD has the following
comments:
1. ITD has no objection to this application and requires no mitigation.
2. No new access to Hwy 19 is requested and none is granted with this application.
3. ITD has comprehensive rules governing outdoor advertising (IDAPA 39.03.60).
IDAPA 39.04.32 also requires that signs not"dazzle or blind" drivers. The current
trend toward high intensity signs has caused an increasing number of driver complaints
on urban segments of the State Highway System. This applicant should be aware of the
issue and plan the site's signing and lighting strategies accordingly.
If you have any questions, you may contact Shona Tonkin at 334-8341 or me at 332-7191.
Sincerely,
0 . ,- '41 *4.4.,0-------
James K. Morrison
Development Services Manager
jim.morrison gitd.idaho.gov
.A. , I
Jarom Wagoner
From: Sylvia Bahem
Sent: Friday, October 17, 2014 1:43 PM
To: Jarom Wagoner
Cc: Dave Wright
Subject: RE: Public Agency Memo -SUP-08-14 Nordberg Special Use
We would ask that a requirement of granting this SUP is that he be required to maintain the property, i.e.,weeds and
goatheads. This property was written up numerous times between 09/14/2005 and 08/15/2012 by the Police Department
and they were always very slow to clean up the property.
Thanks,
Syz &h.=z #167
Caldwell Police Department
Operations Division
110 S. 5th St.
Caldwell, Idaho
208-455-4592
From: Dave Wright
Sent: Friday, October 17, 2014 10:32 AM
To: Sylvia Bahem
Subject: FW: Public Agency Memo - SUP-08-14 Nordberg Special Use
Dave Wright
Lieutenant
Caldwell City Police Department
Office :208-455-4514
Fax: 208-455-3123
email:dwright @cityofcaldwell.org
This email for Law Enforcement use only
PRIVILEGED/CONFIDENTIAL INFORMATION may be contained in this message. The information in this e-
mail correspondence is intended for the use of the individual or entity to whom it is addressed.
If you are not the intended recipient, you are hereby notified that any disclosure, duplication,
distribution, or the taking of any action in reliance of this correspondence is strictly
prohibited. If you received this correspondence in error, please notify the sender by reply e-
mail or phone and destroy any and all copies of the correspondence. Thank You
From: April Cabello
Sent: Friday, October 17, 2014 10:30 AM
To: Robb MacDonald; Andy Cater; Jody Brazelton; Dave Wright; mark.wasdahl @itd.idaho.gov
Subject: Public Agency Memo - SUP-08-14 Nordberg Special Use
Hello,
Please see the attached public agency memo.
Jarom Wagoner
From: Robb MacDonald
Sent: Monday, November 03,2014 4:38 PM
To: Jarom Wagoner
Subject: FW: Public Agency Memo-SUP-08-14 Nordberg Special Use
Attachments: PUBLIC AGENCY MEMO-SUP-08-14.pdf
Jarom,
As per the letter dated Jan 15, 2004 from Scott Woods to Mr. Nordberg, there were several engineering requirements that
were either never completed or not addressed in their entirety.These requirements must be addressed before the
engineering department can sign off on this project. those requirements are outlined and attached to that letter.
thanks
Robb MacDonald, P.E.
Assistant City Engineer
City of Caldwell
Engineering Department
Ph: (208)455-3006
Fx: (208)455-3012
From: April Cabello
Sent: Friday, October 17, 2014 10:30 AM
To: Robb MacDonald; Andy Cater; Jody Brazelton; Dave Wright; mark.wasdahl @itd.idaho.gov
Subject: Public Agency Memo - SUP-08-14 Nordberg Special Use
Hello,
Please see the attached public agency memo.
Please direct all responses or questions directly to Jarom Wagoner via email:
jwagoner @cityofcaldwell.org
Thank you,
April Cabello
Planning Technician
City of Caldwell
(208)455-4667 phone
(208)455-3050 fax
acabello@cityofcaldwell.org
1 '4,73
GNI.DW f< ®fce II# Tfty ngixmPer
04 C, lll���
1.
" I 1i rii j �{.lubIir li�: 1rr 4+r .
11111
top, •4l
s
AIoe nOw
GORDON N. LAW, P.E. CITY OF CALDWELL
City of Caldwell 621 Cleveland Blvd.
P.O.Box 1177 Caldwell,Idaho 83605
Caldwell,Idaho 83606-1177 - January 15, 2004 PHONE(208)455-3000
BUS. 208/455-3006 FAX(208)455-3012
Richard A.Nordberg
410 S. 1st Ave.
Caldwell,ID 83605
Re: Bird Dog Auto Sales Inc.at 410 S.1s`Avg.
Dear Mr.Nordberg,
The purpose of this letter is to let you know that the City of Caldwell has noticed you are
occupying the Bird Dog Auto Sales Inc. at 410 S. 1' Ave. without a certificate of occupancy.
After reviewing our files we still do not have a bond for the remaining improvements, and you
still have not completed the requirements for a temporary certificate of occupancy. In order for
the City of Caldwell Engineering Department to sign off on the certificate of occupancy we need
the sidewalk and pedestrian ramps repaired or replaced.
I have attached the engineering requirements dated June 17, 2003 which were attached to the
building permit, letter dated July 1, 2003 stating what was needed for a temporary certificate of
occupancy,and a copy of the section of city code 12-01-17 explaining why you need a certificate
of occupancy. If you fail to comply with engineering requirements by the 16th of February 2004,
we will have no alternative but to forward this issue to Darrell Mayes, the Building Official, and
the City of Caldwell Attorney.
Please do not hesitate to contact Darrin Hibbs or myself should you have any further questions or
concerns. We can be reached during normal business hours at 455-3006.
Sincerely,
f--\
4. U■.J`"/,
Scott A. Woods
Engineering Director of New Development,
Cc: Darrell Mayes,Building Official
Steve Hasson,Community Development Director
Gordon Law,City Engineer
Ben Weymouth,Assistant City Engineer
Garret Nancolas,Mayor
CR X•12")
Gptow f,,, (I ffire of ( itg littgiiteer
24110■10„. &-
co Vi- .0 A, ._ public Ic II m105 PirEttor
II -tom.
dl-....,700
ff`
GORDON N. LAW, P.E. CITY OF CALDWELL
City of Caldwell 621 Cleveland Blvd.
P.O.Box 1177 Caldwell,Idaho 83605
Caldwell.Idaho 83606-1177 PHONE(208)455-3000
BUS. 208/455-3006 FAX(208)455-3003
ENGINEERING DEPARTMENT
REQUIREMENTS
June 17,2003
PROJECT: Bird Dog Auto Sales,Inc.
LOCATION: 4105 S. 1st Ave.
OWNER: Richard A.Nordberg
ARCHITECT: Thomas R.Ensley and Assoc.
ENGINEER: N/A
The following requirements shall be met during construction and prior to the issuance of a Certificate of
Occupancy:
1. The site plan that was done by Thomas R.Ensley and Associates for Mr.Nordberg and submitted
with Mr.Nordbergs building permit application details the construction of an asphalt parking
surface being placed in all areas of the site with the exclusion of the landscaped areas and the on-
site office space. *Facilities for storm water management for the project site shall be designed by
a licensed engineer per the City of Caldwell Storm Water Management Policy and constructed per
the approved plans. Please provide a detailed storm water design,including site grading.that
provides all required information and calculations for sizing and design of the facility.The City of
Caldwell Engineering Department shall be notified for inspection of all stormwater facilities being
constructed. Contractors shall give the City a minimum of 24 hours advance notice of any
required inspections.
2. The Applicant will be required to provide the City with a site plan that accurately and correctly
depicts the existing site conditions in order for a complete review and approval of the building
permit application. The submitted site plan does not show existing structures, i.e.irrigation boxes,
power poles,and trees. The site plan also incorrectly depicts the location of the driveway that
takes approach onto lu Ave.
3. **The applicant will be required to construct frontage improvements in accordance with the City
of Caldwell standards and specifications. Frontage improvements are required to be done in the
best interest of the health,safety and welfare of the citizens of Caldwell. The following is a
detailed list of site frontage improvements that will be required by the City prior to the issuance of
a certificate of occupancy:
1 of 3
1. All sections of the sidewalk along Cleveland Blvd.that are in a state of disrepair will
need to be repaireeL'replaced to meet City of Caldwell standards.
2. The addition of a pedestrian ramp will be required to be constructed per City standards at
the northwest corner of Cleveland Blvd.And 151 Ave.
3. A section of curb and gutter beginning at the southwest side of the existing catch basin on
Cleveland Blvd.and extending approximately 6-foot to the southwest will need to be
repairedireplaced.
4. Approximately 150-feet of 5-foot sidewalk will be required to be constructed along the
frontage of 15'Ave.per City of Caldwell standards.
5. The existing driveway approach that fronts onto 1ST Ave.will need approximately 5-foot
of curb replaced on the northwest radius,a functioning gutter plate that allows for
unimpeded flow of storm water and the southwest edge of the driveway will need to be
perpendicular to i5'Ave.and winged per City of Caldwell standards.
6. Approximately 8-foot of curb and gutter will need to be replaced starting from the point
of curvature on the northwest radius of the existing approach on 1z1 Ave.heading to the
northeast.
7. The City will require that the applicant construct approximately 135-feet of 5-foot
sidewalk along the frontage of Paynter Ave.per City of Caldwell standards. The
construction of this sidewalk will need to terminate at the right-of-way boundary for the
railroad at the northwest end of the property and at the existing approach to the alley at
the southeast boundary of the site on Paynter Ave.
8. City records indicate the alley that is adjacent to the applicant's southeast property
boundary is owned by the City of Caldwell. **The applicant will be required to construct
road improvements along this frontage to include the alley being brought up to City of
Caldwell standards for alley improvements. Improvements,at a minimum,will require
that the applicant,if using the alley as a primary access,to construct a standard pavement
cross-section the entire width of the alley from 1St Ave.to Paynter Ave.
4. There is currently sewer and water available to service the site. Water is available to the
development in Cleveland Blvd.and sanitary sewer is available to the development by a sewer line
that bisects the applicant's property at the southeast corner. **The applicant will be required to
connect to these services as a condition precedent to obtaining a building permit.
5. •__ should he that there easement that bisects the southeasterly corner of
J. Applicant$uvwu .,aware, u.. ..........o,...... °,:Se:^..... ._ CS e .., ..
the property. This easement is subject to certain construction requirements and restraints per the
City of Caldwell Zoning Ordinance. This easement needs to be shown and labeled on the revised
site plan.
6. A required one-half width street right-of-way of 33-foot along Paynter Ave.(Minor Arterial)will
be required to be dedicated to the City by the applicant prior to any Certificate of Occupancy
being issued. Cleveland Blvd. is under Idaho Transportation Department(ITD)jurisdiction and
should be solicited for comment regarding this development.
7. Appropriately licensed public works contractors shall perform all construction w^''n right-of-
way.
8. Inspections of all work done in the right-of-way,including curb,gutter,driveway approach,
sidewalk concrete forms,gravel placement and compaction, is required prior to pouring any
concrete.
9. Contractors shall give the City a minimum of 24 hours advance notice of any required inspections.
10. All traffic control for this project shall meet the requirements of the Manual on Uniform Traffic
Control Devices(M.U.T.C.D.)and the city engineer. The contractor shall provide a traffic control
plan to the City Engineer for review prior to any construction within the right-of-way.
2of3
I I. Irrigation water for all proposed landscape shall be obtained from applicable Irrigation District
sources.
The before mentioned items are compiled from a general review of the proposed site development. This is
not an all-inclusive list. Additional information and/or changes may be required upon resubmittal of
required information and a revised site plan.
Scott Woods—Engineering Department
*City of Caldwell Stormwater Management Interim Policy dated 1998
Section 101.1.6
`Infrastructure Improvement Policy(Bill No.24 R 8.Ordinance No.1960,'`1944)
3 o f 3
(4C(1 )
,. r
,0,Ett ®ffire of (1Lity irteE rtgr
• &
o 11Jublir IN oats!irth1r
1".:F' 7
,,,,
MOp'mu ohs
GORDON N. LAW, P.E. CITY OF CALDWELL
621 Cleveland Blvd.
City P.O.
Box 11 Caldwell Caldwell.Idaho 83605
P.O. PHONE(208)455-3000
Caldwell.Idaho 83606-1177 F
BUS.208/455-3006 FAX(208)455-3W3
ENGINEERING DEPARTMENT
REQUIREMENTS
July 1,2003
PROJECT: Bird Dog Auto Sales,Inc.
LOCATION: 4105 S. 1'Ave.
OWNER: Richard A.Nordberg
ARCHITECT: Thomas R.Ensley and Assoc.
ENGINEER: N/A
Per a request by Richard Nordberg and in conjunction with the requirements letter submitted to Richard
Nordberg in regards to building permit No.31350 on June 17,2003,the Engineering Department is issuing
this letter by way of approval of Mr.Ben Weymouth,Assistant City Engineer.
A time extension of one(1)year will be given to Mr.Nordberg to complete the requirements listed in the
before mentioned letter with the following conditions attached: .
1. All public safety items listed in the before mentioned requirements letter must be
completed before a temporary Certificate of Occupancy will be issued. These items
consist of all sidewalk and pedestrian ramp repair or installation in the public right-of-
way that present a safety hazard to the public as determined by the City Engineer.
2. The Temporary Certificate of Occupancy will only be issued after Mr.Nordberg has
presented the City with a bond for all items remaining to be constructed within the one
(1)year time extension. The bond must be in the form of a Cashiers Check,Letter of
Credit,or a Surety. The amount of the bond and the form of the bond must be approved
by the City Engineer.
41W---
on Woods—Engineering Department
1 of 1
(-. . lci.b
12-01-15 12-01-17
or as restricted in the zoning regulations', shall not be commenced
until after the issuance of a written permit by the Building Official.
(2) Permit to be Displayed: The person receiving such permit shall
display the official permit card in front of the affected building so that
the same may be seen from the street, and it shall be incumbent
upon any law enforcement officer of the City to stop such building
operations until such permit has been secured and displayed.
(3) Plans to be Filed: No permit for construction or alteration shall be
issued unless there is filed with the Building Inspector a plan for
such construction or alteration which shows all buildings as now
erected together with the intended improvement. (Ord. 1771, 2-2-88)--'
12-01-17: CERTIFICATE OF OCCUPANCY AND COMPLIANCE;
CHANGE IN USE OF BUILDING:
(1) Certificate of Occupancy and Compliance Required: No building
erected or altered shall be occupied, used or changed in use or
occupancy until a certificate of occupancy and compliance has been
issued by the Building Inspector, stating that the building or
proposed use of a building or premises complies with all the building
and health laws and regulations and with the provisions of the
zoning regulations of this Code.
No premises shall be used or occupied or changed in the use or
occupancy until a certificate of occupancy shall have been issued by
the Building Inspector, stating that the proposed use of the premises
complies with the zoning regulations and with the provisions of this _
-..r Code relating thereto.
Before issuing such certificate, the Building Inspector may, if he
desires, submit the application and all papers connected therewith to
the planning and zoning commission or may submit the same directly
to the City Council.
(2) Record of Certificate: A record of all certificates shall be kept on file
in the office of the Building Inspector, and copies shall be furnished
on request to any person having a proprietary or tenancy interest in
the building affected. No fee shall be charged for an original
1. See chapter 10 of this code.
City of Caldwell
(n 2)
12-01-17 12-01-21
certificate, but for copies of any original or subsequent certificates,
there shall be a charge of one dollar ($1.00) each.
(3) Change In Use Of Building: The use of a building shall not be
changed from one class of use to another unless and until an
application has been made to the building inspector of the city in due
form, stating:
A. The use of the premises at the time of application or, if vacant, its
last use;
B. The use it shall be put to;
C. Parking requirements for proposed use; and
D. Whether the proposed use of the building or premises will
increase fire hazard to the premises or adjacent property. The
evaluation by the chief of the fire department stating whether the
proposed change will or will not increase the fire hazard must be on
the application. (Ord. 1771, 2-2-1988)
12-01-19: BUILDINGS ON INDIAN CREEK; REQUIREMENTS: All
buildings erected along or adjacent to Indian Creek shall be of
suitable and endurable material, and the walls along the banks of said
Indian Creek supporting said buildings shall be of reinforced concrete or
like permanent material and shall be supported by proper footing and
foundations to.comply with the building code of the city and be satisfactory
to the engineer and the building inspector of the city. All such bases shall
reach at least five feet (5') below the scour line of said Indian Creek.
The throat of said creek, between the said walls of such building or
structures, shall be at least thirty-three (33) clear lateral feet and shall be at
least eight feet (8') above the bed of the stream. (Ord. 1771, 2-2-1988)
12-01-21: AMENDMENTS TO THE INTERNATIONAL BUILDING
CODE AND INTERNATIONAL RESIDENTIAL CODE:
1) IBC Section 101.1, "Title" These regulations shall be known as the
Building Code of the City of Caldwell, hereinafter referred to as "this
Code".
2) IRC Section 101.1, "Title". These provisions shall be known as the
Residential Code for One- and Two-family Dwellings of the City of
February 2003
Cit'. of Caid:Lell
c�GpLnw£tt (Office rtf Trig' n$t r
4' 'It R
Z
°p, r± ° ubIir is I LTrits Pirrrt.or
vett
GORDON N. LAW, P.E. CITY OF CALDWELL
City of Caldwell 621 Cleveland 833605
P.O.Idaho 1177 PHONE(208)455-3000
Caldwell,Idaho 83606-1 1 77
BUS. 208/455-3006 FAX(208)455-3003
ENGINEERING DEPARTMENT
REQUIREMENTS
June 17,2003
PROJECT: Bird Dog Auto Sales,Inc.
LOCATION: 4105 S. 15f Ave.
OWNER: Richard A.Nordberg
ARCHITECT: Thomas R.Ensley and Assoc.
ENGINEER: N/A
The following requirements shall be met during construction and prior to the issuance of a Certificate of
Occupancy:
1. The site plan that was done by Thomas R.Ensley and Associates for Mr.Nordberg and submitted
with Mr.Nordbergs building permit application details the construction of an asphalt parking
surface being placed in all areas of the site with the exclusion of the landscaped areas and the on-
site office space. *Facilities for storm water management for the project site shall be designed by
a licensed engineer per the City of Caldwell Storm Water Management Policy and constructed per
the approved plans. Please provide a detailed storm water design,including site grading,that
provides all required information and calculations for sizing and design of the facility.The City of
Caldwell Engineering Department shall be notified for inspection of all stormwater facilities being
constructed. Contractors shall give the City a minimum of 24 hours advance notice of any
required inspections.
2. The Applicant will be required to provide the City with a site plan that accurately and correctly
depicts the existing site conditions in order for a complete review and approval of the building
permit application. The submitted site plan does not show existing structures,i.e.irrigation boxes,
power poles,and trees. The site plan also incorrectly depicts the location of the driveway that
takes approach onto 1'Ave.
3. **The applicant will be required to construct frontage improvements in accordance with the City
of Caldwell standards and specifications. Frontage improvements are required to be done in the
best interest of the health,safety and welfare of the citizens of Caldwell. The following is a
detailed list of site frontage improvements that will be required by the City prior to the issuance of
a certificate of occupancy:
1 of 3
?f)2—
1. All sections of the sidewalk along Cleveland Blvd.that are in a state of disrepair will
need to be repaired/replaced to meet City of Caldwell standards.
2. The addition of a pedestrian ramp will be required to be constructed per City standards at
the northwest corner of Cleveland Blvd.And 15'Ave.
3. A section of curb and gutter beginning at the southwest side of the existing catch basin on
Cleveland Blvd.and extending approximately 6-foot to the southwest will need to be
repaired/replaced.
4. Approximately 150-feet of 5-foot sidewalk will be required to be constructed along the
frontage of 151 Ave.per City of Caldwell standards.
5. The existing driveway approach that fronts onto lS1 Ave.will need approximately 5-foot
of curb replaced on the northwest radius,a functioning gutter plate that allows for
unimpeded flow of storm water and the southwest edge of the driveway will need to be
perpendicular to 151 Ave.and winged per City of Caldwell standards.
6. Approximately 8-foot of curb and gutter will need to be replaced starting from the point
of curvature on the northwest radius of the existing approach on 15'Ave.heading to the
northeast.
7. The City will require that the applicant construct approximately 135-feet of 5-foot
sidewalk along the frontage of Paynter Ave.per City of Caldwell standards. The
construction of this sidewalk will need to terminate at the right-of-way boundary for the
railroad at the northwest end of the property and at the existing approach to the alley at
the southeast boundary of the site on Paynter Ave.
8. City records indicate the alley that is adjacent to the applicant's southeast property
boundary is owned by the City of Caldwell. **The applicant will be required to construct
road improvements along this frontage to include the alley being brought up to City of
Caldwell standards for alley improvements. Improvements,at a minimum,will require
that the applicant,if using the alley as a primary access,to construct a standard pavement
cross-section the entire width of the alley from 151 Ave.to Paynter Ave.
4. There is currently sewer and water available to service the site. Water is available to the
development in Cleveland Blvd.and sanitary sewer is available to the development by a sewer line
that bisects the applicant's property at the southeast corner. **The applicant will be required to
connect to these services as a condition precedent to obtaining a building permit.
5. Applicant should be aware that there is a sewer easement that bisects the southeasterly corner of
the property. This easement is subject to certain construction requirements and restraints per the
City of Caldwell Zoning Ordinance. This easement needs to be shown and labeled on the revised
site plan.
6. A required one-half width street right-of-way of 33-foot along Paynter Ave.(Minor Arterial)will
be required to be dedicated to the City by the applicant prior to any Certificate of Occupancy
being issued. Cleveland Blvd. is under Idaho Transportation Department(ITD)jurisdiction and
should be solicited for comment regarding this development.
7. Appropriately licensed public works contractors shall perform all construction within right-of-
way.
8. Inspections of all work done in the right-of-way,including curb,gutter,driveway approach,
sidewalk concrete forms,gravel placement and compaction,is required prior to pouring any
concrete.
9. Contractors shall give the City a minimum of 24 hours advance notice of any required inspections.
10. All traffic control for this project shall meet the requirements of the Manual on Uniform Traffic
Control Devices(M.U.T.C.D.)and the city engineer. The contractor shall provide a traffic control
plan to the City Engineer for review prior to any construction within the right-of-way.
2 of 3
�i�
• I I. Irrigation water for all proposed landscape shall be obtained from applicable Irrigation District
sources.
The before mentioned items are compiled from a general review of the proposed site development. This is
not an all-inclusive list. Additional information and/or changes may be required upon resubmittal of
required information and a revised site plan.
•
Scott Woods—Engineering Department
'City of Caldwell Stormwater Manaeement Interim Policy dated 1998
Section 101.1.6
**Infrastructure Improvement Policy(Bill No.24&8.Ordinance No.1960&1944)
3 of 3