Loading...
HomeMy WebLinkAbout03 Public Agency I PUBLIC AGENCY ITEM DATE SUBMITTED BY I) - i°Alli-le-r-N:16r44-- (0- I r 2_0,c F:re fibb Pr)- - 2- memo - 22- 45 --uft) 5 April Cabello From: Andy Cater Sent: Friday, June 12, 2015 3:29 PM To: April Cabello Subject: RE: Public Agency Memo-SUP-15-09 REQUIEM LLC The Caldwell Fire Department has reviewed Michael and Krista Woods request and through my review, specific Fire code requirements shall be met to operate this special amusement center. The Woods have agreed to meet all adopted fire codes per the 2012 International Fire Codes. The Woods at this time have secured permits to completely protect the structure with fire sprinklers that are specific to their request. The Woods have shown through their efforts of code compliance and building remodel they are very much in support of the City of Caldwell's requirements. The Fire Department has no opposition to their request and support their approval. M.D Ett in am mr- s FIRE 'ry RESCUE Andrew Cater Deputy Chief/ Fire Marshal 208-250-4945 From: April Cabello Sent: Thursday, June 11, 2015 4:54 PM To: Robb MacDonald; Andy Cater; Brett Clark; Dave Wright Subject: Public Agency Memo -SUP-15-09 REQUIEM LLC Hello, Please see the attached public agency memo. Please direct all responses or questions directly to Jarom Wagoner via email: jwagoner @cityofcaldwell.org Thank you, 1 \? I Memorandum To: Jarom Wagner, Senior Planner From: Robb MacDonald, Assistant City Engineer Tim King, Engineering Department Re: SUP-15-09 Requiem LLC Date: June 22, 2015 The Engineering Department provides the following comments on a request by Michael & Krista Wood for a special use permit to operate an amusement center within the C-C (City Center)zone. The subject property is located at 810 Main Street in Caldwell, Idaho. Street Improvements 1. Any curb, gutter and sidewalk along the subject properties Main Street frontage deemed by the City to be non city standard or in disrepair or a safety hazard shall be removed and/or replaced to city standards. 2. All sidewalks, pedestrian ramps and driveway approaches, new or existing, within the public right-of-way shall be improved to meet the downtown decorative sidewalk frontage improvement plan and those requirements specified in the United States Access Board's Proposed Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way, I.S.P.W.C. (2015 edition)and City of Caldwell Supplemental Specifications to the 2015 I.S.P.W.C.. When in conflict the more restrictive specifications shall apply. 3. The applicant is eligible to be included in the City's concrete L.I.D. to construct said frontage improvements. Sewer 1. Additional connection fees if any shall be required at the time of building permit application. Water 1. Additional connection fees if any shall be required at the time of building permit application. General 1. Work within the right-of-way shall be performed by an appropriately public works licensed contractor. 2. Prior to commencement of construction in any dedicated right-of-way, the City Engineer staff is to be notified. Appropriate City personnel are to be notified in advance of all required inspections. Page 1 of 2 3. All traffic control for the project shall meet the requirements of the 2009 Manual on Uniform Traffic Control Devices (M.U.T.C.D.) and the City Engineer. The contractor shall provide a traffic control plan to the City Engineer for review prior to any construction within the right-of- way. Page 2 of 2 �r�