HomeMy WebLinkAbout03 Public Agency I PUBLIC AGENCY
ITEM DATE SUBMITTED BY
M"-\ Aah Pf302 a_
Memorandum
To: Jarom Wagner, Senior Planner
From: Robb MacDonald, City Engineer
Tim King, Engineering Department
Re: SUP-15-10 Endearment LLC
Date: August 17, 2015
The Engineering Department provides the following comments on a request by Ron Sargent/
Endearment LLC for a special use permit to operate an assisted living\memory care center within
the C-2 (Community Commercial) zone. The subject property is located at 1420 E. Ustick Rd. in
Caldwell, Idaho.
Development Plans
1. Development Plans— Prior to commencing construction, plans must be prepared by the
developer's engineer and approved by the City Engineering Department which shall include the
following items:
a. Street section and alignment(including curb and gutter);
b. Sidewalk (5 foot minimum on all streets);
c. Sanitary sewer(per City and DEQ requirements);
d. Potable water(per City and DEQ requirements);
e. Stormwater facilities (per City requirements/manual);
f. Street lighting (per City standards);
g. Street signage (per City and MUTCD requirements);
h. Vertical Datum based on NAVD 88 Datum.
i. City pathway along east side of property
General
1. A public utility easement of not less than 20 feet in width shall be provided for any sewer or
water lines not in the public right-of-way. A public utility easement of not less than 30 feet shall
be provided for combined sewer and water mains not in the public right-of-way.
Page 1 of 4
?ft- ‘
2. All street, sewer, water, fire protection, and street light facilities within the public right-of-way
shall be dedicated to the City. Some conveyance facilities for stormwater drainage may be
eligible for dedication to the City.
3. Appropriate easements for emergency access, transmission lines and/or other utilities shall be
clearly indicated on the construction drawings, with recorded instrument numbers provided to
the City for said easements.
4. All utilities on and within the development shall be located underground.
5. Construction of facilities to be dedicated and/or within public right-of-way shall be performed by
an appropriately licensed public works contractor and constructed to City of Caldwell
specifications.
6. All traffic control for the project shall meet the requirements of the 2009 Manual on Uniform
Traffic Control Devices (M.U.T.C.D.) and the City Engineer. The contractor shall provide a
traffic control plan to the City Engineer for review prior to any construction within the right-of-
way.
7. Prior to commencement of construction in any dedicated right-of-way, or construction of any
improvement intended for dedication to the City or connected to a City facility, the City
Engineering staff is to be notified. This preferably will take place in a pre-construction
conference scheduled by the engineer of record in which all appropriate personnel and utilities
are present. Appropriate City personnel are to be notified in advance of all testing (including
compaction, pressure and coliform, etc.) and given opportunity to be present during conduct of
the testing. The engineer of record or his designated representative is to witness all tests and a
log of inspection visits and testing results is to be kept by the engineer of record or his
representative.
8. The developer is to employ a responsible design professional, preferably the engineer of
record, to oversee and inspect construction, to perform and/or observe all requisite testing of
completed facilities, and to certify that improvements have been constructed according to
approved plans and in compliance with applicable City, State, and Federal standards.
9. The engineer of record shall be held responsible to ensure that the developments
improvements are in substantial compliance with said engineer's design. Following the
construction of the subdivision improvements, the developers engineer shall provide the City of
Caldwell Engineering Department with electronic dwg. format record drawings spatially
referenced to the Idaho State Plane Coordinate System-West Zone, North America Datum
(NAD) 83. Vertical control shall be referenced to the North America Datum (NAVD) 88 for future
reference and to establish that the engineer of record has caused construction to occur in
substantial compliance with the design of said engineer of record.
10. Any note, item or drawing element on the construction drawings, engineering drawings and/or
design drawings related to the property inconsistent with City Codes, Policies and/or
Ordinances shall not be construed as approved unless specifically addressed and granted by
City Council.
Page 2 of 4
Right-of-Way
1. East Ustick Road is classified as a Principal Arterial. The applicant shall dedicate to the City a
forty-eight (48)foot one a half width right-of-way(minus existing) along the subject parcels
entire East Ustick Road frontage.
2. The applicant shall dedicate a thirty(30)foot strip of right-of-way along the subject parcels
east boundary for future pathway connectivity from East Ustick Road to the parcels to the
south.
3. Any future or planned non-classified streets within the development shall be constructed within
a fifty-one (51)foot full width right-of-way dedicated to the City.
Street Improvements
1. The applicant shall improve East Ustick Road to a thirty-three (33)foot one-half width street
section, back of curb to road centerline. The street section shall be constructed to current City
standards for a Principal Arterial and shall include sidewalk, street lights and any necessary
storm drain facilities.
2. Any future or planned non-classified streets shall be constructed to a minimum thirty-seven
(37)foot back of curb to back of curb. The street section shall be constructed to current City
standards for a non-classified street and shall include sidewalk, street lights and any
necessary storm drain facilities.
Access
1. Access point to the proposed development shall be considered under guidance and/or
requirements stated in the City's "Caldwell Access Control Standards for State Administered
Highways and City Administered Surface Street Ordinance" (Ord. 2790, 6-15-2009).
Sewer
1. The applicant shall connect to sewer via a 30" main in East Ustick Road. Internal sewer
mainline sizing shall be determined at the time of construction drawing approval.
2. It shall be the responsibility of the applicant's engineer to verify that connection to existing
sewer mainlines will not exceed the functional capacity of said facilities. Provision for
connectivity by future developments shall be met in accordance with current City standards.
3. Any easements for sewer lines to be dedicated to the City not in the right-of-way should be at a
width sufficient to construct same and not less than 20 feet in width. Easements for adjacent
sewer and water lines not in the right-of-way shall be at a width sufficient to construct the same
and shall be no less than 30 feet in width.
Page 3 of 4
Water
1. The applicants shall connect to the City of Caldwell Municipal Water System and comply with
the City of Caldwell Water Master Study as updated. Water is available from a 12" line in East
Ustick Rd.
2. All on site water mains will need to be looped into existing mains for fire flow and water quality
purposes. Internal main sizing and construction plan approval, will be dependent upon the
availability of fire flow.
Irrigation
1. Existing easements and/or right-of-ways for any existing irrigation facility within the proposed
development shall be determined and clearly indicated on the construction plans. Construction
across or re-routing of these facilities is subject to approval by the governing irrigation districts
and at their discretion.
2. The developer shall maintain any existing upstream drainage rights and downstream irrigation
rights across the property. During the design phase of this project, the developer or his
engineer is to contact the appropriate irrigation district to help ascertain these rights.
Appropriate facilities shall be provided by the developer to convey irrigation and drainage water
across the property to take care of these offsite needs.
3. Irrigation facilities shall be located outside the public-right-of-way and shall be moved,
adjusted and/or improved as necessary to facilitate required street improvements.
Storm Drain
1. As noted previously, provision is to be made for the disposal of stormwater drainage in
accordance with the City Stormwater Management Manual and any updates adopted
subsequent to this application. It is to be noted that retention designs may be denied in most
instances. A copy of this policy is available upon request. The engineer of record is to provide
calculations, which indicate that the assumptions in his stormwater drainage plan comply with
the requirements of the stormwater manual
2. The applicant shall identify and retain all historical drainage discharge points from the property
for the purpose of draining on site storm water detention facilities.
Page 4 of 4