HomeMy WebLinkAbout01-15-2013 PATHWAY & BIKE ROUTES— „a -A t
I
I
n
U
5 i)
3
.r'
y
�
I
I�
■
5
1
■
�ri
I
I
7
m
Q ■
.1 ■ I - r '
�l.c �
Ann M. suggested reflectors.
Chairman Molenaar stated that ACHD gives triangle reflectors, which are
battery operated and cheap.
Rob H. suggested reflective tape, something to give everyone.
Chairman Molenaar noted that the smaller youth size not the toddler helmets
ran out first and should change the amount and sizes of helmets ordered.
Chairman Molenaar also wondered if Caldwell bike path brochures are at
bike shops.
Brian B. responded that the Library and YMCA have bike path brochures.
B. Family Values Park and Pathway Update.
Ricardo C. reported the park is moving along but ran into a problem with the
existing sewer running too shallow from the YMCA to extend to the restroom
in the park. Engineering is working on a solution to hook up sewer to the new
restroom at the future Family Values Park. One option is hooking up to the
sewer on Larch, but to do that they will have to go through a farm field.
Ricardo C. stated he would contact Jerry Bauman, the property owner of the
field next to the YMCA and ask if he would sell to the city a 20 -foot easement
through his property. Ricardo C. explained this could take some time
because of meeting with the property owner and the city getting an appraisal.
He further explained the YMCA pathway would connect to the Family Values
Park pathway and suggested the committee speak with Scott Curtis from the
YMCA because he would like the park to be all- wheels down.
C. Montana Avenue Safe Routes to School Project.
Brian B. stated the sub - committee has met three times since the last PBR
meeting and they made good progress. The consultant is preparing a report
of improvements needed on Montana Ave, and frontage of Syringa Middle
School and Washington Elementary School. Brian B. reported that the
school officials seem pleased with the preliminary recommendations and he
will forward the report to the PBR committee once it is complete. Brian B.
stated he would like the committee's consent before he takes the report and
recommendations to the Mayor and City Council.
Rob H. stated that council seems excited about the yellow cones in the
middle of the road idea. Rob H. stated he would like to meet with Brent O.
and Brian B. to discuss lighted crosswalks and visual crosswalks instead of
traditional crosswalks.
Rob H. wondered if there are plans to keep expanding past Washington
Elementary and Syringa Middle schools.
Brian B. responded there will be a plan but it is not part of this plan. Brian B.
further stated he will put together a plan for all the schools but because the
21Pagc
school district is rezoning /redistricting all the elementary schools, he would
wait and see how those zones turn out before he does anymore planning of
crosswalks near schools.
Rob H. wanted to confirm the City of Caldwell would handle expanding the
crosswalks to other schools.
Brian B. confirmed.
D. Thank You Cards.
Brian B. thanked the PBR committee members that came to the P & Z office
to sign the thank you cards for the Streets Department and West Valley
Medical Center and the congratulations card for Kristin Armstrong.
Vli. New Business.
A. Update on Terms of Office.
Brian B. reported that Rod Garrett and Larry Evans chose not to be re-
appointed to another term.
Brian B. confirmed the reappointment to a 3 -year term ending 12 -31 -2015 of
all remaining PBR committee members.
Brian B. informed the committee they only need four members present to
establish a quorum.
B. Election of Officers 2013 - Chair and Vice - Chair.
Cindy G. nominated Bill Buckendorf as Chair.
Mark P. nominated Ann Manning as Vice- Chair.
MOTION: Cindy G. SECOND: Mark P., MOTION PASSED.
C. Fund Balance Update.
Brian B. reported the fund balance is $45,000 per the Public Works Director.
Brian B. stated the fund balance would pay for the 2013 PBR major project,
improvements and upgrades to the greenbelt.
D. Greenbelt Repairs and Improvements.
Brian B. reported that staff walked the entire greenbelt, took pictures and
noted the locations needing the most repair. Brian B. submitted the
photographs and information to Ricardo C. to review the information and give
recommendations. Brian B. asked Ricardo C. to schedule and start repairs in
2013. Brian B. stated the greenbelt work would be in stages over a couple of
years.
31Page
Ricardo C. wondered what part of the greenbelt that staff felt needed repair
and that he thought the east side of the greenbelt needed the most repairs
starting from the underpass all the way to the silver bridge. Ricardo C.
estimated that section to be almost 28,000 feet and if the city crews do the
work, he estimates the repair to cost roughly $25,000.00 for materials. If a
contractor is hired it would cost roughly an additional $15,000.00.
Brian B. suggested cleaning up the greenbelt as the the PBR community
cleanup project in April.
Brian B. suggested meeting with Ricardo C., Katie P., April C. and himself to
discuss a greenbelt repair plan of action.
Ann M. wondered about posting of signs advertizing and inviting the public
for the upcoming PBR community clean up day.
Chairman Molenaar wondered who would handle the advertizing of the
community clean up day.
Brian B. stated that staff would take care of posting and or publishing the
PBR community clean up day advertisement.
E. Joint Meeting with Nampa BikelPed Group.
Brian B. reported on behalf of Paul M. who has been talking with a private
Bike /Ped group in Nampa. Paul M. had stated he thought it would be
beneficial for the Caldwell PBR committee to meet with the Nampa BikelPed
groups once a year and wondered when and where to meet.
The commission agreed that the regularly scheduled PBR meeting on March
19, 2013 at the Caldwell Airport would be a good date for the joint meeting
with Nampa BikelPed group.
Brian B. will invite the Nampa BikelPed group to the PBR March meeting.
F. FLAP Program.
Brian B. explained that FLAP stands for "Federal Lands Access Program"
and the people who run the Deer Flat Refuge called to inform him they have
cash available in the State of Idaho for access to national lands. Brian B.
called the Department of Transportation who informed him that the state of
Idaho is due to get $17 million a year over the next five years for this
program. Department of Transportation also stated to keep in mind that one
third of the State is federal land.
Brian B. further stated he spoke with Brent O. the Public Works Director and
he supports either bike lanes or a pathway adjacent to 10 Avenue and
Orchard Avenue to help get people to Lake Lowell and the refuge. Brian B.
confirmed this access plan would be eligible for the grant and the local match
is 7.5 %.
41Page
The committee held a discussion regarding what agency to contact that has
t jurisdiction over 10 and Orchard. The committee decided that the agency to
contact is Canyon Highway District.
Ricardo C. stated that Canyon Oighway District called the City of Caldwell
Engineering Department two weeks ago stating that they are going to
improve Orchard Avenue and asked if the city would like a deceleration lane
in front of Mallard Park, which Ricardo C. confirmed.
Ricardo C. confirmed with Brian B. the proposed route of the pathway would
start at Homedale and 10 Avenue; follow along 10 Avenue, across
Karcher Road, down to Orchard Avenue over to Indiana Avenue and out to
Lake Lowell.
Brian B. stated the deadline to submit the application is February.
G. 2013 Meeting Calendar.
Brian B. presented the 2013 meeting calendar to the committee.
The committee approved the 2013 meeting calendar as written.
VIII. Committee and Staff Reports.
A. Chairman Molenaar stated the 1 -84 pedestrian overpass is snow covered;
kids are walking but cannot bike across the bridge, also the sidewalks going
across the 10 Street Bridge covered in snow.
B. Brian B. reported the city installed two streetlights at the new pathway
pedestrian crosswalk on Linden.
IX. Adjourn. Meeting adjourned at approximately 8:15 p.m.
Motion to adjourn meeting.
MOTION: Bill B., SECOND: Cindy G., MOTION PASSED.
Respectfully submitted by April Cabello,
MINUTES APPROVED AND SIGNED BELOW BYtHAIRPERSON
ON THE DATE NOTED BELOW.
Hill air
Ez - T�
ATTEST: Brian Billingsley, P &Z Director
Date
a / / q I I?
Date
51Page