Loading...
HomeMy WebLinkAbout07-12-2007 DESIGN MINUTES ' City of Caldwell �.?e���Z �e�i��?c� C���nissio� To Protect, Enhance, and Revitalize Caldwelf DepotJacingSevenfhAvemie (l906f Caldwell D�esign Review Commission agenda for Thursday, July 12, 2007 at 5:00 p.m. at the Caldwell Piablic Library, 1010 Dearborn, Caldwell, Idaho AGENDA . I. Call to Order II. Op��ning Statement III. Introduction of Stephanie Rohrdanz IV. Auciience Participation V. Old Business A. Approve Minutes of June 14, 2007. B. Adoption of By-Laws VI. Ne�v Business A. Case No. DR-02-07 (D.L. Evans Bank), NW Corner of 10 and Blaine. B. Member Discussion C. Next Meeting — August 9, 2007. VII. Adj��urn ,���pz � 1 . � ' � Cit of Caldwell - . Y pe���n, R�v���v ��rn.n���s�e�n� To Protect, Enhance, and Revitalize • Caldwell DepotJacing Seven�h Avenue (1906)) SUMMARY/MINUTES FOR MEETING OF: July 12, 2007 Call to Order — Design Review Chairman, Mr. Gene Shaffer, opened the public meeting at 5:00 p.m. in the Community Room of the Caldwell Public Library, 1010 Dearborn, � Caldwell Roll was called, Members present were: Gene Shaffer, Jim McGarvin, Chuck Randolph, Ben Weymouth, Stephanie Rohrdanz Staff Present: Brian Billingsley (Planning Director), David Richey, Associate Planner. . Review of Proceedings — Mr. Shaffer opened the meeting and introduced the new member, Stephanie Rohrdanz. He then delivered the open statement concerning the meeting format and restraints. Minutes for the June 14, 2007 Design Review Commission meeting were reviewed and approved. Oath - Mr. Shaffer asked all those wishing to speak during the hearing to stand and take the oath of truthfulness. Staff Report - Mr. Shaffer instructed staff to present the first item on the agenda. Mr. Richey introduced the application: Owner: D.L Evans, 2560 E. Fairview, Meridian, Idaho 83642 Architect: Erstad Architecture, 420 Main Street, Suite 202, Boise, Idaho 83702 Request: The owner/developer submitted an application on June 6, 2007 for approval of a design review permit for demolition of two non-historic structure and construction of a bank in the Indian Creek Corridor at the northwest corner of 10 Ave. and Blaine St. D.L. Evans Bank is proposing to construct a new 12,653 square foot two-story bank/office facility within the Indiana Creek corridor. The applicant requests relief from the following Indian Creek corridor provisions: > ; � -_�.. Caldwell Design Review Commission �� � w y; °;��������0 2 Agenda for Feb. 00, 2007 • � , 1. City code requires 42 parking spaces on this site. Only 23 can be provided. The applicant will need to lease 19 parking spaces off-site; 2. Construction of a surface lot within the Indian Creek Corridor when they are prohibited; 3. A 3 foot wide landscape strip is provided along the south (Blaine St) property line in stead of the required 5 foot strip; 4. A public entrance is not provided on the Indian Creek side of the building as required; and, 5. Off street parking is to be at the rear�of the building, the site plan calls for it to be in the front (10 Street) side of the building. Applicant Presentation: Architect Andrew Erstad represented the applicants. Mr. Erstad briefly discussed the reasons for each of the exceptions to the Development Design Requirements being requested. He added a sixth request: 6. Buildinq heiaht at two stories rather than three required for Indian Creek Corridor. Mr. Erstad discussed the design features of the proposed building, its site circulation pattern, and the impracticability of having a second public entrance into the foyer that came from the Creek side of the building. There was discussion between the Commission and the applicant representative and the public hearing portion of the meeting was closed. Commission Deliberation: The Commission discussed the six items that were presented as proposed exceptions. Most items requested for an exception were not considered major issues however, the total absence of any pedestrian connection befinreen the proposed building and the Creek immerged as a key factor. The Commission agreed that the applicant meet with the Planning and Zoning staff the first of the following week in an effort to resolve the Creek/building pedestrian requirement. The Commission then approved a continuance of this meeting for one week hence, July 19, 2007, to make a decision on the subject development proposal. There being no reservation of a room at the Library, it was determined the meeting would continue at the Development Services Department at 621 Cleveland, Caldwell. Meeting to be continued to 5:00 pm, Thursday, July 19, 2007 Caldwell Design Review Commission 2 of 2 Agenda for Feb. 00, 2007