HomeMy WebLinkAbout5-21-1992 P&Z MINUTES 1
CPTY OF C.ALDWELL
PLANNIlVG AND ZONING CONIlVIISSION
1��IIIVUTES MAY 21, 1992
COMMISSION PRESENT: ABSFNI': STAFF PRESENT:
Chairman Chuck Randolph, Jim Blizzard, Liz Yeary
Rick Wells, Rita Earl, Tom Ensley,
Mary Higdem, Phil Frye,
Wanda Anthony, Carlos Ferreira
ITEM ACITON/FOI.LOW-UP
1. PRE-AGENDA: City Council Conference
Room 7:00 p.m
R.ita Earl pointed �out on the March 19
Minutes that she had abstained from
voting on Hafen Hills Subdivision.
Rita Earl indicated that she would abstain
from voting on the Lasher PUD Special
Use Permit and the Rojmar Subdivision.
Tom Ensley indicated that he would
abstain from voting on the Marjorie
Bushnell Community Center Special Use
Pernut.
Jim Blizzard pointed out that the Staff
Report on the Lasher PUD showed the
zoning as R-3 when it is R-2.
Carlos Ferreira felt that Pioneer Irrigarion
concerns had not been addressed by the
Staff Report on the PUD but Chairman
indicated this could be addressed under
the conditions of the Special Use Permit.
The Director indicated an error on page 2
of the Lasher PUD Staff Report that
identified the area east of the proposed
4
f�l
development as unincorporated when it is
within City limits.
The Commission agreed to hear the
Lasher PUD application at one time but
would vote first on the Special Use Pemut
and then vote whether or not to
recommend the Plat subdivision be
forwarded to City Council with
recommendation for approval.
Commissioner Earl stated that Jerry Earl
would be speaking in reference to items
on the agenda and that his opinions were
his own.
2. ROLL CALL
3(a) MINUTES: Approval of Minutes from the Anproved, Planning and Zoning Commission
Meeting of 03-19-92. Meeting Minutes of March 19, 1992.
A morion was made by Rita Earl and seconded
by Wanda Anthony to adopt the minutes with
the exception of Page 13, showing abstention of
Commissioner Earl, and unanimously passed.
3(b) MINUTES: Approval of Minutes from the Approved, Planning and Zoning Commission
Meeting of 04-16-92. Meeting Minutes of April 16, 1992.
A motion was made by Rita Earl and seconded
by Mary Higdem to adopt the minutes as
submitted and unanimously passed.
4. PUBLIC HEARINGS
Chairman R.andolph indicated that since
Commissioner Earl will be abstaining from voting
on items 4A and 5A and Commissioner Ensley
will be abstaining from voting on item 4B,
alternate Commissioner Ferreira will vote on
those items.
4A. Case No. 92-SUP-10
Special Use Pemut application to allow a
Manufactured Home Planned Unit Development
3
on Florida Avenue between Cherry Street and
Beech Avenue. Applicant, Gary D. Lasher.
Jim Blizzard presented the background to the
request and location of the project. He explained
that the project will be developed in Phases and
that street improvements will be provided as
each phase develops.
Gary Lasher, applicant, further outlined the
proposal, stating that it will be an adult-only
facility, which will fulfill a need in Caldwell.
The internal infrastructure will be the property
of the owner and will be maintained by him, that
he would come to an agreement with Pioneer
Irrigation to address their concerns, and that he
will comply with all City identified concerns.
Street lights will be provided throughout the
development and on Beech, Florida and Cherry.
Gerry Earl testified as surveyor of the project,
and clarified for the Commission the
requirements regarding water rights identified by
Pioneer Irrigation.
A developer is required to provide each lot with
irrigation water. The water does not have to be
Pioneer Imgation water and this development
will use City water to landscape etc. Pioneer
Irrigation will be notified if any lots are sold so
that they may obtain the assessment fee
prescribed.
Gerry Earl, as homeowner, Dick Winder and
Gary Falen testified in favor of the project.
Brian Finley testified against the project citing a
projected devaluation in his properry values.
Dick Phillips testified concerning the difference
between mobile homes and manufactured homes,
and the legality of adult-only developments,
stating that Mr. Lashex's project appeared to be --
a quality project.
4
T'he applicant requested that the setbacks be MOTION to amend side setback requirement in
reduced from the required 4(8) =12 foot stated � Conditions of Approval from 12' to 8' carried.
in the Staff Report and on the clarification of the
Building Inspector it was agreed to modify this
requirement to four feet on both sides.
Motion was made by Carlos Ferreira and
seconded by Phil Frye to amend the setback
requirement. Vote was unanimous.
In response to a question from Tom Ensley, the
applicant confirmed that there will be covenants '
on the properry which would identify the adult-
only requirement and that these covenants would
be passed by the City attorney for legal
compliance. Tom Ensley added that the age
requirement could be added as a 16th condition.
Regarding the street lighting plans, the applicant
and the City will have to reach an agreement on
placement and standard.
Motion made by Carlos Ferreira and seconded by MOTION to approve Special Use Permit carried
Tom Ensley to approve the Special Use Permit subject to the following ternis and conditions:
based on the finding that the proposal satisfies
the requirements of Section 6-3-4 of the Zoning
Ordinance, subject to the stated conditions,
amended as shown in the list. The vote was
unanimous apart from the abstention of Rita
EarL
5
ITEM ACTION/FOLLOW—UP
1. The following site development standards
will apply to the planned unit
development:
a. Setbacks for structures, all
residential lots Front 10', Rear 10',
Side 4'and 4';
b. Setback for Lot 1 Block 3
(Recreational Facility) Front 15',
Rear 10', Side 15'
c. Maximum coverage of any lot by
structures shall not exceed 50% of
the total lot area;
2. The divided entry into the
development from Florida Avenue
shall be constructed providing a
minim� width of twenty feet,
from curb to curb, for each lane;
3. The owner will designate "no
parking", by signs or marked curbs,
along one side of each of the local
streets within the development, as
approved by the City Fire
Department;
4. Prior to the sale or lease of any
lots, the owner will install fire
hydrants located and sized to the
specifications approved by the City
Fire Department and Water
Department;
5. Landscaping will be provided
around the recreation facility, the
median dividing the entry into the
development and along adjacent
public streets. A piped irrigation
system shall be provided for all
landscaped areas. Selection and
installation of trees or shrubs
along public streets shall be
6
ITEM ACTION/FOLLOW—UP
- subject to approval by the City
Forester;
6. The owner shall install street
lighting along public streets to
satisfy standards approved by the
Police Department and City
Engineer;
7. Paved off-street parking spaces,
designed to City standards will be
constructed at each space and the
recreation facility;
8. The developer will participate with
the construction street
improvements, including curb,
gutter, paving and sidewalks
where the development is adjacent
to Cheny Street and Florida
Avenue. Construction plans for
public improvements will be
approved by the City Engineer;
9. The developer will provide all
easements necessary, approved by
the City Engineer, for stormwater
drainage and utility service;
10. A drainage plan will be submitted
to the City Engineer and approved
prior to any grading or
construction;
11. The use of Lot 1, Block 1 shall be
as a common area used for the
storage of recreational vehicles and
equipment;
12. The use of Lot 1, Block 3 shall be
a common area used for
recreationalactivities; development
of this recreation area will be
completed prior to the sale or lease
of more than 30 lots;
7
ITEM ACTION/FOLLOW-UP
13. The developer shall install a 6'
high wood perimeter fence,
finished side facing public streets,
around the development prior to
the lease or sale of any lot.
14. The development may be
constructed in two phases. (Phase
I- Block 1 Lots 1-4, 13-29, Block
2, Lots 7-12; Block 3, Lots 1-11;
Phase II - Block 1, Lots 5-14; Block
2, Lots 1-6) . Proposed and
required improvements for each
phase will be completed prior to
the lease or sale of any lot.
15. All residences and the recreation
building shall be constructed in
conformance with the standards of
the Uniform Building Code or be a
Class A Manufactured Home as
defined by Section 6-6-1 CMC. All
manufactured homes shall conform
with the development standards
for manufactured homes on an
individual lot established by
Section 6-5-4 CMC.
16. Applicant will provide a copy of
covenants, to be approved by staff
and City attorney, which will
include requirement of adult-only
aspect of the development.
17. Applicant will come to an
agreement with the Planning and
Zoning Director and Pioneer
Irrigation District to address
irrigation concerns.
Chairman Randolph then asked the Conunission
to address the subdivision aspect of the Plat.
8
ITEM ACTION/FOLLOW—UP
The Director clarified the recommendations MOTION to forward plat to City Council with
outlined in the Staff Report asking that the recommendation for approval subject to the
Commission reword certain items. following conditions:
Motion made by Wanda Anthony and seconded 1. All streets, water and sewer systems,
by Carlos Ferreira that the plat be forwarded to fences and other improvements within the
City Council with a recommendation for approval development shall be privately owned and
subject to the conditions listed. Vote was maintained;
unanimous with Rita Earl abstaining.
2. A revised final plat will be prepared for
approval by the Council; plat will show
setbacks; plat will have wording
indicating that roads and utilities will be
privately owned and maintained.
3. Prior to certification of the plat by the
City Clerk, the developer shall execute an
agreement of performance approved by
the City Engineer and post a performance
bond or sinular financial instrument, the
amount of which will allow for
completion of all required public
improvements.
4. Applicant will come to an agreement with
the Planning and Zoning Director and
Pioneer Irrigation District to address
irrigation concerns.
4B. Case No. 92-SUP-11
Special Use Pernut application to allow the
operation of a gymnasium facility in the Marjorie
Bushnell Community Center facility on 12th
Avenue between Dearborn and Everett.
Applicant, City of Caldwell, agents, Teri Ottens
and Tom Wheeler.
Mr. Blizzard gave the background to the request,
emphasizing that the permit will open the 8900
sq.ft. gynuiasium only and any other portion of
the building will not be used without another
Special Use Permit.
- 9
IT� ACTION/FOLLOW
The Director referred to the narrative portion of
the application which describes some of the
proposed uses, parking plans and other aspects
of the development. Some of the potential
concerns raised by staff were parking space
availability, which staff identify as 84 developed
off-street spaces at the senior center, library and
the gymnasium facility itself.
Staff recommend approval of the Permit subject
to the conditions outlined in the Staff Report.
The Chairman requested that the record show
that the Engineering Report portion of the Staff
Report be entitled "Engineering".
Mr. Randolph indicated that the Director
recommends assessing the viability of the Special
Use Permit based on Page 4 of the Staff Report
taken from the Caldwell Zoning Ordinance.
Phil Frye asked if a detailed Plot Plan was
submitted and was advised that Attachment A
was the Plot Plan and there was nothing more
detailed, no elevation drawing or landscaping
plans. Mr. Frye expressed concern that such
details are required from regular businesses
when making application and similar information
should be required of city faciliries.
Rita Earl pointed out code deficiencies itemized
in the Staff Report and asked if these had yet
been addressed. Mr. Blizzard reported that they
had not yet been addressed, but that landscaping
plans aze submitted generally on a conceptual
level initially and then in greater detail as a
project is developed.
Wanda Anthony noted that recommendation #9
of the Report asks for a year in which to
complete landscaping plans, whereas normally
the time frame is a lot less.
10
ITEM ACTION/FOLZOW—UP
In response to a question from Rick Wells, Mr.
Blizzard explained that item # 7 of the evaluation
criteria should be construed as evaluating the
minimum standards required.
Teri Ottens presented the background to the
case, explaining that the 4C Committee has been
given responsibility by the City Council to design
and raise funds in order to complete the facility.
The use will not be a spectator use and the times
scheduled will be organized so as not to conflict
with the Senior Center. Some of the uses of the
gymnasium would be basketball, volleyball, open
gymnasium, senior walking track, potentially
some teen dances and such, and programs
connected with the Youth Advisory Board and
Gang Prevention program.
Landscaping plans cannot be provided as plans
for the rest of the facility have to be addressed
first. Initially plans are to put u1 minimal
landscaping as to invest money in extensive
landscaping at this time would be a waste of
money. As the Staff Report states, in a year
landscape and design plans will be ready and
available and the 4C Committee will be in a
position to submit plans for the remainder of the
building.
Handicapped access to the gymnasium will be
temporary until the rest of the building is
planned and ADA standards will be met. While
she did not feel that the Planning and Zoning
Commission should be concerned with structural
design, an architect, though not a structural
engineer, had looked at the building and
indicated that it appeared to be sound. Everyone
who has looked at the building has said that it is
structurally sound and we do have that in
writing.
Concerning parking, they do not anticipate more
than 40 cars at one time. They do plan to
approach the Traffic Commission to allow
diagonal parking on Everett which will add some
11
ITEM ACTION/FOLLOW-UP
spaces. They also plan to use Sebree Park spaces
to alleviate any problems.
Regarding the sign, it has served a very useful
purpose in promoting and encouraging funding
for the project and the Committee would like to
continue to display the sign.
Ms. Ottens explained that the debris is part of
the construction phase and will be cleared away
as soon as feasible. BFI have donated a �
dumpster to assist in the process.
The 4C Comnuttee find nothing they would be
unable to comply with in the suggested
conditions in the Staff Report.
In response to a question from Chuck Randolph,
the applicant indicated that they are looking at
an August 1 opening for the gym only, and that
there would be restrooms for use in the
basement area.
Rita Earl raised the question of what would
happen if it was determined not to use the
remainder of the facility, and Ms. Ottens
confirmed that the gym could stand alone,
although the hope is that the rest of the facility
will be viable. In response to a question from
Mary Higdem, Ms. Ottens explained the timing
of the American Disabilities Act and the deadline
for preliminary plan design by July 1992 and all
buildings to be handicapped accessible, according
to ADA standards, by 1995.
Commissioner Earl questioned the Traffic
Commission's input on traffic and on-street
parking design and the applicant explained this
was in process. Commissioner Frye cited the
narrative's proposal of "teen dances" but the
applicant stated that this is only in the ideas
stage and under discussion with Parks and
Recreation. Commissioner Frye also questioned
obtaining a building pernut but Tom Wheeler,
Project Manager, confirmed that this is not
necessary at this time. In response to a question
12
IT � ACTION/FOLLOW
from Carlos Ferreira, the applicant stated that
they do not anricipate more than the numbers of
two basketball teams using the gym at one time
and schedules would be attempted to work with ;
adjacent facilities to ease traffic and parking
problems. Commissioner Ferreira questioned
costs involved in total upgrading, particularly of
sidewalks and landscaping.
Mary Higdem referred to the auditorium and t
questioned possible parking, and Ms. Ottens
mentioned some of the possibilities but that that
is in the design stage. Commissioner Higdem
responded that she felt an overall complete plan
should be designed and accepted rather than
completing parts a piece at a time. Ms. Ottens
replied that the Council recognized the need for
the gyrcuiasium facility and since funding is a
problem it was decided that the City should go
ahead with the gymnasium portion. Because the
Council made that decision more donations are
being granted.
Rita Earl concurred with Mary Higdem that an
overall plan was necessary before the piecemeal
portions could be addressed and that there are
other facilities available which could be used
until the whole project design is complete.
Phil Frye mentioned the parking availability and
the evaluation by staff. The applicant responded
that discussions are under way with the LDS
Church to share their parking facility at times of
high usage of the proposed gynulasium.
In response to a question from the Chairman,
Ms. Ottens stated that Council advised them not
to apply for a Special Use Pernut from Planning
and Zoning Commission until Council had
decided that it was a viable proposition.
Commissioner Higdem felt that it was impossible
to evaluate the gymnasium Special Use Permit
without evaluating the whole facility.
Tom Wheeler then came to the podium. He
stated that after conferring with the Fire
13
ITEM ACTION/FOLLOW
Marshall any kind of dances would be severely
limited by the occupant load. The main purpose
of opening the gym is as a gymnasium facility in
response to a stated need, and as the facility is
seen to be functioning, more interest and
donarions will be generated.
In response to a question from Wanda Anthony,
Mr. Wheeler confirmed that apart from one wall
which would have to be partially rebuilt, the
columns of the gynuiasium will support it on its
own.
Lane Thomas addressed the Commission
speaking in favor of the facility and as a member
of the 4C Committee. He described the concept
of the Community Arts and Recreation Center
and funding and need for such a facility.
In response to a question from Rick Wells, Mr.
Thomas confirmed that the gymnasium will not _
be used for theater unless it is brought back to
the Conunission as part of a master plan.
Commissioner Ferreira raised the possibility of
temporary parking availability and Tom Wheeler
indicated on the plan where such areas might be.
Geny Earl spoke to the Conunission in
opposition to the request reading from a report
which is attached to the record as Exhibit A.
There were various questions raised concerning
the report which Mr. Earl answered.
Kathleen Lamm testified in opposition to the
request. She is concerned that Sebree Park
remain a park as a service to the community and
recommended that the block between Cleveland
and Dearborn be demolished to provide
necessary parking. In response to a question
from R.ita Earl, she described the parking
situation at her daycare facility and at the
Library and Senior Center. She added that non-
spectator sports in fact do generate spectators
and that this whole facility needs to be addressed
14
IT� ACTION/FOLLOW-UP
in granting the Special Use for the gymnasium to
alleviate problems in the future.
The Chairman noted the testimony concerning
Sebree Park is in reference to the applicant's
narrative statement submitted as part of the
application.
Enoch Ogstad testified in opposition to the
request based on parking problems in the area.
He itemized the LDS Church, First Christian `
Church, Senior Center and Library as being in
the area and having functions at the same time.
He suggested that the grass strip on the sidewallc
be eliminated and the area used for diagonal
parking.
Sue Smith testified about the request, citing
parking and traffic as a major problem now and
with the gymnasium it will be worse.
Steve Maggio testified about the request, citing
parking and trash problems associated with such
a facility. He is looking to the Conunission for
leadership in directing the planning of the
facility.
Carol Skinner testified about the request, citing
a lack of overall planning and cost estimating.
She also cited concerns about the parking
situation and the alleged non-spectator sports
and that Sebree Park should not be made
available as a parking lot. Ms. Ottens handed a
copy of a proposed community center budget
which is attached to the record as Exhibit B.
Dick Winder testified about the request, stating
that the City should abide by a higher standard
than that required of the private sector, that if
private citizens are required to provide adequate
parking, then the City should also. He stated
that the Cominission has the authority to limit
the use of the complex and should use its
authority in this case limiting the use to two or
three specific cases.
15
YTEM ACTIAN/FOLLOW-UP
Mr. Winder also refened to asbestos in the
building and the results of the study done during
his tenure on Council 1987-89.
Ms. Ottens responded regarding the asbestos
saying that there are plans to deal with the
asbestos, but that the only asbestos in the gym is
in the roof tile which is treatable by covering it.
The Report on Asbestos is attached to the record
as Exhibit C.
A letter was submitted to the Commission,
attached to the record as Exhibit D, from LeAnn
Simmons, e�ressing concern over the
preservation of Sebree Park as a park and that
the City should explore other alternatives to
alleviate the parking problem.
The public hearing phase , of the meeting was
closed.
Commissioner Earl asked for the Fire Marshall to
answer questions. Mr. Dilley pointed out on the
plan the area where fire lanes would best be
situated, and stated that the City had met with
him and discussed all his concerns and come to
an agreement. He further stated that there
would have to be area separation between the
gym and the rest of the building to meet fire
code. He has not yet figured out the total
occupancy of the building.
Rick Wells asked if the Fire Department had been
involved in the initial planning for this. Mr.
Dilley replied that it had not and that he has not
seen a set of plans.
Rita Earl asked for a representative of the
Engineering Department to address the
Commission. Mr. Enebo stated that any changes
in parking or traffic flow will go through the
Traffic Commission and this is addressed in the
Staff Report recommendations. After a cursory
inspection of the parking situation on Everett
Street, it would appear that there is room for
16
ITEM ACTION/FOLLOW-UP
diagonal parking on one side and parallel
parking on the other side apart from areas
designated as fire lanes.
Rick Wells asked if the Engineering staff had
been involved in the planning stage of this
facility to which Mr. Enebo said not at this time.
Phil Frye asked that Ms. Ottens retuxn to the
podium and asked how she felt so far about the
application. She stated that the Planning and �
Zoning Commission have to give direcrion on the
parking issue as there is no standard. Regarding
landscaping, the 4-C Committee does not want to
expend funds on this, if in the future that
landscaping has to be torn out to accommodate
future use and changes. She said there has been
a feasibility study which includes cost estimates.
She asked that before the Commission deny the
request they might let the Committee know what
more information they need to make a decision
so that the opening date may go ahead as
planned.
Commissioner Frye asked the applicant if she
would like the application to be considered as
submitted. She stated that she would.
Carlos Ferreira stated that it is difficult to make
a decision within a couple of hours about
something which has taken months to consider
by other entities. He felt that the project seems
very worthwhile but there are many questions
which need more time to answer.
Rita Earl stated that she had heard from people
about how the project should proceed, that the
City needs to do more in a public relations forum
to inform the City of plans. Commissioner Frye
suggested that with the testimony presented, the
applicant should submit a more detailed plan
addressing the concerns outlined.
Rita Earl made a motion to table the request and
form a subcommittee to meet with
representatives of the 4C Committee,
17
ITEM ACTION/FOLLOW-UP
Engineering, Fire and members of the public to
assist in the overall planning of the facility.
Motion was seconded by Wanda Anthony.
Phil Frye questioned the legality of such a
subcommittee with membership of Commission
members being a part of the plannuig process
which would eventually be approved by the
Commission.
Chuck Randolph suggested amending the Motion.
Mary Higdem felt there was insufficient
information for the Commission to make a
decision and that the application should be
tabled, because of the importance of the project
to the community and the need for good
planning.
Carlos Ferreira felt the applicant should be given
an opportunity to bring back an appropriate plan
for the Commission to consider.
The motion was withdrawn.
Chuck Randolph offered the applicant the choice
of withdrawing at this point, or continue to try
to act. Applicant indicated they would welcome
a decision of the Conunission.
Carlos Ferreira made a motion to table the MOTION: To table the request until such time as
request until such time as staff is satisfied that a as staff is satisfied that a proposal is retumed to
proposal is returned to the Commission that the Commission which meets the concerns
meets the concerns voiced. Rick Wells seconded voiced. Approved.
the motion. Rita Earl, Phil Frye, and Wanda
Anthony voted in favor of the motion and Maxy
Higdem voted against the motion based on the
finding that there is no master plan for the
facility. Tom Ensley abstained.
Chairman stated that in his opinion the
Commission were not against the project but
that concerns were voiced which need to be
addressed.
18
ITEM ACTION/FOLLOW-UP
5. NEW BUSINESS
Chairman, citing the late hour, suggested that
the Comnussion consider items SA and 5C and
other items be tabled to the next meeting.
5A. Case No. 92-5-06
Preliminary plat approval of Rojmar Subdivision
involving the subdivision of approximately 0.84
acres into 5(five) residential lots on property
located on South Illinois.
Jim Blizzard gave the background to the request,
referring to the review and correspondence
received from Pioneer Imgation. Staff
recommend approval subject to conditions listed.
Mary Higdem commented on the report of the
potential landlocking of the parcel to the east. �
The Director stated that while it is a concern to
staff it is not illegal for the landowner to do this.
Gerry Earl, the surveyor for the project, agreed
and confirmed that the landowner has been
apprised of the potential problem.
19
ITEM ACTION/FOLLOW-UP
Tom Ensley made a motion, seconded by Carlos MOTION: To approve the preliminary plat and
Ferreira, to approve the preliminary plat and forward the final plat to City Council, subject to
forward the final plat to City Council for the following conditions:
approval with the recommendations as listed by
staff. The vote was unanimous with Rita Earl 1. The applicant shall provide utility service
abstaining, and noting Commission's concern and utility easements to the individual
regarding the potential landlocking of the eastem lots subject to approval of affected
parcel. utilities and the City of Caldwell.
Phil Frye asked that a fifth condition be added 2. Prior to certification of the plat by the
addressing the concerns of Pioneer Irrigation and City Clerk, the subdivider shall execute an
the maker and seconder of the Motion agreed. agreement of performance to assure the
completion of required street and
sidewalk improvements and a
performance bond, cash, letter of credit or
other form of City-approved financial
instrument, or a deferral agreement to
enter into a Local Improvement District,
which will allow for completion of all
required improvements as approved by
the City Engineer.
3. The applicant shall install a fire hydrant
at the intersection of Helena and Missoula
in conformance with fire department
standards.
4. The plat will be revised to clearly indicate
the United States Exclusive Dixie Drain
Right of Way laying 50 feet from the
drain centerline.
5. The concerns of Pioneer Irrigation District
be addressed prior to final plat approval.
5C. Review of Amendment to Subdivision
Regulation re ag rding Street Li�g
The Director e�lained the background to this
item, adding that Council has already passed the
first reading of the bill to mandate installation of
private and public street lighting in all
subdivisions.
20
ITEM ACTIO�/FOLLOW-UP
Rita Earl raised the question of the wording
allowing a year in which to install lighting. Mr.
Blizzard explained that this is a time frame
rather than a requirement and that the
developer, Engineering and Public Works work
together on a schedule to coordinate such
improvements.
In response to a quesrion from Rick Wells, Mr.
Blizzard commented that design standards are
not included in this.
Tom Ensley made a motion and Wanda Anthony MOTION: To forward draft subdivision
seconded to forward the draft subdivision regulation amendment to City Council for
regulation amendment to City Council for approval.
approval. Vote was unanimous.
8. Chairman and Director will meet and
discuss tabled items to place on upcoming
agenda.
Meeting adjourned at 12:15 a.m.