HomeMy WebLinkAboutORD 24310 0
BILL NO. 27
ORDINANCE NO. 2431
AN ORDINANCE OF THE CITY OF CALDWELL IDAHO, CREATING LOCAL
IMPROVEMENT DISTRICT NO. 02-2 FOR CALDWELL, IDAHO, FOR CITY SEWER
AND WATER CONNECTIONS WITHIN SAID CITY; PROVIDING FOR THE LEVYING
OF ASSESSMENTS UPON THE PROPERTY TO BE BENEFITED BY SUCH
IMPROVEMENTS AND FOR THE BASIS OF MAKING SAID ASSESSMENTS; SETTING
FORTH THE PROPERTIES TO BE INCLUDED IN SAID DISTRICT; PROVIDING FOR
MAKING THE ASSESSMENT ROLL; AUTHORIZING THE PUBLICATION OF A CALL
FOR CONSTRUCTION.
NOW, THEREFORE, BE IT ORDAINED by the Mayor and Council of the City of Caldwell,
Idaho:
Section 1. There is hereby created a local improvement district in the City of Caldwell, Idaho, to be
called Local Improvement District 02 -2 for the purpose of extending City utility services and
facilitating connections to said services. The descriptions of the real property are in accordance
with Resolution of Intention No. 37 -02, which was heretofore and hereby adopted, ratified, and
approved, all within the corporate limits of the City of Caldwell. The boundaries of said district
are defined by the corporate limits of the City of Caldwell.
Section 2: Each lot and parcel of land shall be separately assessed for said debt or cost and expense of
said utility connections in proportion to the benefits derived to such property by said improvements.
Section 3: Each property shall be assessed the cost of extending City utility services in conformance
with connection fees calculated in accordance with current standard utility hookup fee policies adopted
by the City. The amount of said costs is estimated to be $75,000, provided, however, that said costs
shall not exceed the actual cost of connection fees together with expenses set forth in Section 4.
Section 4: The cost and expenses to be assessed as herein provided shall include the cost of connection
fees and reasonable administration costs, such as engineering, clerical services, advertising, inspection,
collecting of assessments, and legal services for preparing the proceedings in regard thereto.
Section 5: In the case of a sewer connection, the hookup fee allows the property to be hooked onto
the City sewer system. The property owner shall hire a licensed plumber to make the tap onto the City
main sewer line. In the case of a water connection, the City of Caldwell Water Department will install,
upon proof of all fees paid on L.I.D., a water meter for the property.
Section 6: The property owner may not include the costs of construction of necessary pipes and
appurtenances needed to connect the residence or business to the City facilities on the L.I.D.
Section 7: The City Engineer is hereby appointed as the official engineer for this project and shall
prepare the necessary plans and specifications for the construction of the improvements and an
assessment roll for the L.I.D.
m
.
f
.r
Y
I ¢
I
2 �
1
T -
2 �