HomeMy WebLinkAbout1972-07-24city council minutes343
approved by the Chief of Police and was accompanied by a receipt from the Clerk for the required fee.
It was moved by Councilman Carter, seconded by Councilman McCloskey, to approve the application
for Wine License and the license be issued. Upon vote, the motion carried.
_ Application for Bartender Permits approved
Applications for Bartender permits were then presented for the consideration of the Council from
Pamela Payne, Roy Burcham, Joyce E. Carr, M. Paulette Pilots, Bruce Cottrell, Mitchel W. Smith, Raymond
Scott Pasley, Adonis. L. Revert, Brent N. Kelly, IZ?Tm F. Clarke, Carold Elizabeth Alderson, Rick 0. Bowman,
Leslie Kay Lewis and Sharon J. Smith.
Councilman Gamboa moved, Councilman Carter seconded, that the applications for Bartender Permits
be approved and the permits issued. A vote was taken, and the motion carried.
Bills Mid July
It was moved by Councilman Davenport, seconded by Councilman Banks, that themarrants for claims
be approved as per list and filed in the City Clerk's office. Such warrants being in the totals as follows
WARRANT NUMBERS 550 thru 597, GENERAL FUND . . . . . . . . . . . . . . . 8,667.10
WARRANT 11[RMMS 296 thru 311, WATER G. SEWER FUND: Water . . . . . . . . 852.89
Treatment Plant . . . . . . . . 81.75
:dater General Office. . . . . . 3.83
Sewer . . . . . . . . . . . . . 212.45
WARRANT NUMBERS 627 thru 671, SPECIAL FUND: Fire . . . . . . . . . . . . . . 255.65
Cemetary. . . . . . . . . . . . 18.50
Street. . . . 7,930.55
Street Capital. . . . 4,615.17
Sanitation. . . . . . 3.00
_ Irrigation. . . . . . . . . . . 258.30
L.I.D. 69 . . . . . . . . 163.23
Cemetary Sinking. . . . . . . . 313.00
Armory . . . . . . . . . . . . . 79-55
TOTAL OF ALL FUNDS 23,458.37
There being no further business to come before the Council at this time, it was moved by Council -�
man Combos, seconded by Councilman Carter, that the meeting adjourn. meeting adjourns t :20 P.M.
Mayor
�Vuty City rk
CGUNCIL CRAMDIIiS
July 24, 1972
7:30 P.M.
The Council met pursuant to call and acknowledrement of notice in the following form:
We, the undersigned Mayor and Members of the City Council of the City of Caldwell, Idaho, do
hereby acknowledge notice of a Special Meeting of the said City Council to be held in the Council Chambers
of the City Hall of Caldwell, Idaho, at the hour of 7:3 P.M. on the 24th day of July, 1972, for the trans-
action of all business in connection with the following object: Adoption of the Sager System Plan of CB2M
and Mrs. Wood's request for variance.
Witness our signatures this 24th day of July, 1972:
Mayor
Counc an ouncilman
J ouncillm Counc' an
Councilman Counci
Mayor Charles W Carpenter presiding.
Upon Roll Call, the following Councilmen ansim ed present: C. A. "Chet" Davenport, Joe Gamboa,
James R. Dakan, Tester E. Carter, Charles C. Banks and Alfred H. McCloskey. Absent: None.
Request for variance denied - Mrs. Edna Wood
For the first order of business, Mayor Carpenter stated that Mrs. Wood was again present to get a
determination or. the property by the golf course. Us added that nothing had developed since the lest meet-
ing; that she still had the same sketches that she had at the previous meeting.
Councilman Davenport stated that he Salt the first action should be on the variance slid made a
nation, seconded by Councilman Banks, that the variance be denied.
Upon question from Councilman Dakan, who had not been present at the previous meeting, Mayer
Carpenter explained that this property was located on the corner of Grant and 9th Street; that the minimum
corner lot size for construction is 8,000 square feet with a frontage of 75 feet, and that the property
344
in question was 50 x 120 feet which is 6,000 square feet making it 2,000 feet short of the requirement. Mrs
?Mood's intention was to build a 2h x 96 duplex facing 9th Street rather than Grant which would give her 120
feet frontage. Mayor Carpenter further explained that through the conversation of Mrs. Wood and the real
estate man who sold the property to her, the builddr she had obtained to make the plans, and the City Build-
ing Department, she had assumed that she could build on this lot although it would require a variance from
the City Council to do so. Mayor Carpenter added that Mr. Defer had pointed out at the last meeting that
there was never a definite conclusion on his part that this duplex could be built; this was in all the con-
versation that went on. Mayor Carpenter stated further than at one time he was in the Building Department
when Mrs. ',flood was talking to Jim Vizzini; that he, Mayor Carpenter, mentioned to her that there was some i
problem about the s quare footage, although at the time he was unaware if she had purchased the property or
not.
Upon question from Councilman Gamboa, Mr. Dufur stated that it was the practice for Mr. Lewis to
review plans for proposed buildings. He added that in many cases, plans were also given to the Mayor for
his review. He added that in many cases, he had tried to stop variances from coming to the Council, but an;
one could appeal his decisions before the Council.
Councilman McCluskey asked if Mrs. Wood knew whey she bought the property that she would have to
get a variance from the Council. Mr. Dufur replied that he did not give her any indication that he would
grant the variance.
Councilman Banks asked if Mrs. Wood knew that this was 2,000 feet short and that her plans would
have to go to the Council. Mr. Dufur replied that he thought so.
Councilman Gamboa asked Mrs. [lwood what the purchase price for the property was and Mrs. Wood
answered $10,700.00
Councilman Dakan stated if this variance were turned down, the City would then have this old
which would only deteriorate. He added that the Council had been granting variances for the removal of old
structures to be replaced by new. Councilman Gamboa replied that this was true, but most variances were
granted where property lines could be altered, and in this instance, the lines were definitely set.
Councilman Banks stated that his main objective was that this building would be built right along
the property line of the golf course at the back and very close to the line on the West. He added that in
the future there might, be trouble with golfers trespassing.
Councilman Gamboa stated that he would like to see the City purchase this property from Mrs. Wood,
even though this would be taking monies from the downtown development which he thought was as important as
this purchase. He added that this had been in the minutes for the past eight years.
Mayor Carpenter acknowledged Mrs. Woad. She stated that she had paid earnest money with the agree
ment that she had five days to determine if she could build. Mrs. Wood said that after both she and Mrs.
Bishop had talked with Mr. Dufur, it was her assumption that she could build the proposed duplex. Mrs. GToo(
added that the first time she knew there was not enough footage was when Mr. Dufur referred her to Mr. Lewi:
in connection with the proposed driveway and offstreet parking; this being after she had purchased the pro-
perty.
Mr. Dufur asked Mrs. Wood if she was issued a building permit. Mrs. Wood responded in the nega-
tive, adding that it was just verbal. Mr. Dufur stated that he did not issue a building permit to either
Mr. Bishop or Mrs. Wood.
Mrs. Wood stated that she had her contract that Orville Collins had drawn up which she then gave
to the Council for their inspection.
Councilman Dalcan stated that he didnIt think that the Council should deny this variance just be-
cause the Council waanted to purchase the property. He added that if the Council wanted to negotiate for
this property this was fine, but he felt that it was unfair to deny the variance just so the City could be
in a position to purchase the property.
Councilman Davenport called far the question.
345
Councilman McCluskey upon reading the contract drawn up by Mr. Collins asked the Council if they
were aware of the same impression he was in that in the contract it was stated that the sale was on the pro-
vision subject to the approval of the City of Caldwell. He added that at the time the contract was dram
T there must have been some question. Be also commented that in the contract was stated that the building
was not to exceed four units. Mrs. Wood stated that by the time she paid the remainder of thepurchase
price, she was aware that she couldn't build but a duplex.
After some discussion by the Council, it appeared, though no legal counsel was available, that
Idrs. '.flood could recover her investment as the terms of the contract had not been met, and in fact, the sale
had not been consummated as the money paid to the Probate Court was being held in trust, and she had not
received a deed to the property.
Upon question, the Clerk was asked to call the roll. Those voting in the affirmative: Davenport
Gamboa, Banks and McCluskey. Those voting in the negative: Dakan and Carter. The voting being four to
tro, the motion passed.
The Council then discussed the possibility of purchasing this property from Mrs. Wood if it could
be worked into the budget for the coming year. Councilman McCluskey stated that he did not want to spend
$11,000.00 for a piece of grass, particularly when downtown parking was needed.
Councilman Davenport proposed that the present building could be remodeled and would make an
excellent recreation headquarters building as the location for this use was ideal.
Councilman Davenport asked Mr. Al Burrato, head of the Golf Board, to express his feelings on the
matter. Mr. Burrato stated that he felt the liability was great in that if the house were rented, someone
could be hit by a golf ball, etc. Tie added that he felt the building could be used in many ways by the
City.
Mrs. Wood asked if there was a possibility of making a trade of som=_ City owned property by the
Armory. After some discussion, it was the Council's thinking at this time that,, if possible, they would
rather purchase the property than make a trade, though the Council would give this further consideration.
Councilman Gamboa asked Mrs. Wood to offer a fair market price for the purchase of the property
on Grant. It was also pointed out that nothing could be done until the budget was set up for the next year,
and then could not be assured that this expenditure would be allowed.
Report of CH2M Sewer System Flaming
Mayor Carpenter presented Mr. Reynolds of CH274 for his presentation of the sewer system plan. He
commented that the Council had beforethem a Sewer )engineering booklet prepared by CH2M. T4ayor Carpenter
added that CH2M had now fulfilled their agreement, and Mrs Reynolds was appearing before the Council on his
own time to answer any questions which might arise and to relate any information which he had received from
the State Planning Commission and the HUD people since the last meeting when Mr. Eggleston had gone into the
sewer system planning in great detail.
Councilman McCluslosy brought it to the attention of the Mayor that Mr. Al Burrato was in the
audience and felt that he should be heard before Mr. Reynolds gave his report. Mayor Carpenter then aclmow-
ledgad Mr. Burrato.
Mr. Burrato, of the Idaho plat Packers, stated that his company was vitally interested in the
posed sewer system as it was projected that they would be paying a great share of the cost of thenew sewer.
He informed the Council through improvements, in just the last 30 days the affluent had changed, adding tha
they were only 75% of the way. He wanted the Council to know that by the time the new sewer system Has in
affect, the City should not count on the projected income from Idaho Meat Packers.
Mr. Reynolds stated that in their report they outlined the cost that would be required if the lev-
of the load was as projected: they recognized and hoped that something would be done to improve this load.
He added that in the plan it was stated that there would be a period of time for industry to evaluate their
pretreatment steps that have been completed or are in the process, additional pretreatment,, evaluation of
projected increases of production and projected alternative individual treatment approaches for each indust:
He stated that at this time they were only presenting a plan; that any decreases would only alter the size
of the facility and the cost.
1
346
I
Mr. Barrato stated that the volume from the Idaho Meat Packers would be brought down to an absolute
minimum using the present and projected improvements in the future.
Mr. Reynolds said that industries would be given time to work out their problems, and then 092M
would take a three month period to evaluate the result of their accomplishments.
Mr. Reynolds pointed out that on the last page of the booklet was the plan that CH2M. was asking th
Council to consider. He stated that the first step was to adopt a recommended regular sewer service area an
notify Canyon County of the action. He added that the second step would be to set up an infiltration reduc-
tion program, stressing the high most of the infiltration into the sewer system. He stated that before the
City could consider the size of plant and the cost, it would have to see what could be done to reduce this
I six million gallon a dap that enters into the system in the summer.
Mr. Reynolds stated that the plan they were presenting to the Council was a plan of action; then <
many decision: points along the mute and the final committment on the size of the facility and the cost on
this table would not appear until May, 1973. He added that by this time industry would be given time to make
such modifications as they could; a new testing program would then be made to evaluate how successful industr
had been to reduce their load, and it would then be possible to come up with a modified size of facility whit
would actually meet the needs that would be existing. Mr. Reynolds said that when you have one industry that
contributes such a heavy load, you cannot approach this without giving them a chance to evaluate. Mr. Reynol
informed the Council that in adopting this report, they were not bound to any specific cost at this time.
He added that the best waste treatment was not to put it in the sewer to belting With, and this was Ming en-
couraged by this approach.
Mr. Reynolds added that these industries had several alternatives. one would be to do nothing, ant
then they would have to pay for it, but when they become aware of the cost, they w ill look at other alterna-
tives. one alternative would he to take care of their own treatment 100 %, or they could use a wide range of
plans which are available; but that the City was not in the position to tell them what to do.
Councilman Gamboa asked about the time element. Mr. Reynolds replied that the schedule was based
upon the requirements of this project. He added that there were several key points, some of which a date
was named to take action. He added that the adoption of the plan was one of the key things which is critics.
at this time. It needs to be done before the State Department of planning can go ahead with their applica-
tion and certification from BUD for grants from that agency.
Mr. Reynolds stated that the second critical point was the infiltration reduction. He added it wa
critical because of the necessity of making measurements of the ground water infiltration flow into the inte
captor sewers at key points in the summer; then next winter when the water table is low, the corrective
measures could be taken. The effectiveness of these measures could then be tested next summer. Mr. Reynold
stressed that if this schedule was not followed, a year could easily be lost. He added that they were not
sure if these corrective measures would be successful, Wit it was his suggestion that a pilot program be
undertaken at certain key lines, setting up trial corrective measures in the winter, and then measuring
,again in the spring to evaluate its success. Mr. Reynolds said that if the evaluation showed a chance of
success, then it could be ascertained what could be done as far as infiltration reduction was concerned and
plan accordingly.
Councilman Banks asked how much effect the flow of the Boise River had to do with this. Mr. Reynd
said it was hard to say, but some of the older sewers in the Boise River area are affected when the river is
high. He added, however, that the major source was irrigation.
Councilman Davenport asked Mr. Lewis if there was any appreciable change in the influx at the plan
after a heavy rain storm, and if there were any open sewers that the water could go into. Mr. Lewis replied
that there were two parking lots; that, anything that went into the railroad allays went into the sewer, but
these were the only two catch basins that he knew of as he had tried to eliminate any other sources as weL
as he could. He added that this was the reason he had proposed the storm sewers under the L.T.D.
Mr. Reynolds reiterated that if the Council was interested in becoming eligible for the HUD funds,
347
and although he couldn't guarantee their availability, the first step that had to be ea�was a ce�gi=
cation by HUD that the planning requirements had been completed, and that the City was eligible for these
funds. He added that the second move would be a study of the infiltration. Mr. Reynolds stressed that an-
other months delay in this step could be serious. He referred the Council to a chart showing the crater
level for different years, and though they fluctuated, he felt that this study would provide information so
they could evaluate their success.
Councilman aamboa asked Mr. Reynolds what they were going to do about this seepage. Mr. Reynolds
replied that there were many alternatives, one of which would be grouting of the individual ,joints internall
j Councilman Gamboa asked if these tests were included in the cost. Mr. Reynolds explained that the
were, adding that it was evaluated that it was worthwhile when a smaller cost plant with a high cost of in-
filtration correction was compared to a plant with no infiltration correction and a high cost plant using th
excess total to give indications.
Councilman Gamboa asked if this could be speeded up. Mr. Reynolds replied that if the preparation
were ready and the go ahead were right now, two years would be a fair figure, including design, review, con -
struction bids, etc. He added, however, that there would be a question until undustry could be evaluated.
— If the project were started right now, a guess would have to be made as to the load of industry, whereas,
what is Nally needed is a firm comnittment; that, sometimes industry would indicate how their load would be
lessened, and then be unable to meet this. Mr. Reynolds added that if this were done, the City could be
building a sewer to take care of just the present reeds, whereas this had been projected for a twenty -five
year period, so it should begin at half the load capacity rather than starting at full capacity.
Councilman Gamboa asked how long it would take to get the loan. Mr. Reynolds replied that there
were two loans involved in this instance. He talked of one loan which was not a problem that the Council
I
had handed to him, but that he knew it was one that the Council was concerned with, and he had been doing
some work on that. He added that as far as the grants from the State of Idaho and the Environmental Pro-
tection Agency to assist in the construction of the interceptor sewer system and treatment facilities, ob-
taining this money under the present circumstances, appropriatiops were adequate at both levels; that this
money would be available as soon as needed. Mr. Reynolds further explained that the HUD money was a differ-
! ent matter, but it didn't haw- anything to do with the treatment right now - -it would be $2,$$0.00, and that
there were a few bills in Congress, one in each House, one planning for 90% and one planning for BON finan-
cing. He stated that he felt that the Council could be assured of 75% as a grant. He added that he did
not see any problems if the legislation went as indicated now as it would allow the state funds to go a bit
further than they did previously.
Councilman Gamboa asked if Mr. Reynolds would guarantee the funds or would he obtain the funds
when the plan had been adopted. Mr. Reynolds replied that as far as he was concerned, yes, CH2M would
guarantee that the City would receive funds. He added that this was regarded as part of their proper servic .
Mayor Carpenter said this was much the same as the swimming pool and the present treatment plant.
Part of the agreement was that they were to make the application. He added that as he understood it, this
was not included in the preliminary, and if a request was made for CH2M to Gbrain funds, it would be an addi
tional charge.
Mr. Reynolds said that CH2M proposed that the Council authorize final application in July, 1972,
adding that it was not critical. He explained that the City has an application in the State office right
now with the Simplot Company. He added that this would not be used as Simplot Company has indicated that
they are going to go to total irrigation; so this application needs to be reactivated and brought up to con -
form with the plans in the present report.
Councilman Carter asked, if when the Council adopted this preliminary plan, did this then get the
City on the way as far as the financing was concerned. Mr. Reynolds answered that he wasn't completely in-
volved in this, but he understood that the City had some interest in obtaining HUD or EPA grants for the
L,I.D. sewer designed by others. He added that whether it was HUD or EPA it was necessary to have plans and
unfortunately the State hadntt gotten very far with it.
348
Councilman Gamboa asked haw much this could be cut down in time. Mr. Reynolds replied that he fel
the time of two years was a realistic figure; it would take that much time after the bond election had been
held.
Mr. Reynolds emphasized that there were still some key decisions to be made down the route, depend.
ing on the size of the facility and if the City was going to adopt the irrigation disposal system *. which caul
I
be put together somewhat more rapidly than the conventional treatment plant.
Councilman Dakan sponsored the following Resolution and moved its passage:
RESOLUTION NO. 23
M COUNCILMAN DAKAN
BE IT RESOLVED By the Mayor and City Council of the City of Caldwell, Idaho, as follows:
That the City of Caldwell, State of Idaho, hereby adopts Sewer System and !Taste Treatment Planning
(Project Fo. B6176.8) for Caldwell., Idaho, dated 25 May 1972, and presented by the engineering form of Corne.l,
Howland, Hayes & Merryfield, a copy of said Sewer System and ':Taste Treatment Planning for Caldwell, Idaho,
dated 25 Mav 1972, being attached hereto as Exhibit "A" and by reference made a part hereof.
BE IT FURTHER RESCLVED That this resolution shall take effect and be in full force immediately upo
its passage and approval.
The motion for passage was seconded by Councilman McCloskey. A roll. call vote was called for when �.
the following Councilmen answered in the affirmative: Dakan, Carter, Banks, McCloskey, Davenport and Gamboa
f7egative votes: None. Absent and not voting: None. The Mayor declared that Resolution No. 23 had passed.
Councilman Banks asked if the infiltration study would begin in August. Mr. Reynolds replied that
he would get together with Mr. Lewis and work this out so that, with the Council's approval, it could be don(.
The Council agreed that this action should be taken. Mr. Reynolds also stated that the other critical thing
I
that should be done was the authorizing and filing of the preliminary grant application. He added that it
would not hurt to get this in the mill and he could take, a look at that at the same time.
Mr. Reynolds stated that one of the reasons for calling this special meeting of the Council beside
getting the program started was that if there was an interest in contacting HUD for funds, the City would net d
to adopt the plan which also needed to be adopted by the Canyon Development Council as well. Inasmuch as their
meeting was to be Wednesday, Mr. Reynolds felt that the City should have an opportunity to adopt their own
sewer system plan before it was adopted by the County.
Mr. Reynolds said that the State was to prepare the application for certification: that he had
talked to Mr. Bob Wine of the State Department of Planning Community Affairs, about the urgency of this appl -
cn *,ion; that Mr. Glise said he would make every effort to have it completed no the Canyon Development Council
could act on this as well. Mayor Carpenter stated that he had hand delivered a copy of the resolution adopt
ing the general comprehensive plan.
Mr. Reynolds stated that in the last issue of the A.I.C. Bulletin there was an item which said HUD
fund applications needed to be filed no later than August l., 1972. He added that he had brought it to the a tention
of Mr. Wise who was unaware of this also. As a result, they called a Mr. Maneely in Portland, and he said
that,, if the City wasn't certified now, it would have to hustle. Mr. Maneely was not encouraged about ob-
taining any funds as there were only 2.1 million dollars available for Oregon and Southern 1daho, and this
was for 23 cities. Mr. Fred Lang who had been assigned to this area and with whom the city had had dealings
with in the past had left HUD and left a list of communities from which his successor might expect applicati nsl
Caldwell was not one of them. Mr. Reynolds said he asked Mr. Maneely to verify this as he knew that the Cit
of Caldwell should be among them. Mr. Reynolds said he talked to Chuck Steel., a development leador involved
and he said that if the application gets there by September 15, it could be considered, but he didn't hold —
out a lot of encouragement, even if it arrived by this time. Mr. Reynolds added that at least September 15
was a possible date whereas the August 1 date was not.
Mr. Reynolds interjected that Mr. Steel had told him that this year there± was money available for
parks. They could finance 50% on almost anything that was wanted. He felt this might be helpful in the
previous problem having arisen before the Council..
349
1 II Mr. Reynolds said that the Canyon Development Council has to develop other things. They have to II 1
adopt a Nampa prcgram as uell as one for Caldwell_, and they have to adopt a plan which is not done yet, but
he felt it could be accomplished: this was the planning that is sponsored by the Idaho 57ater Resource Baord
through the FHA funds for rural portions of Cans, =on County. He added that this all had to be in the certifi-
cation package before certification could be granted.
Mayor Carpenter informed the Council that the certification should be completed by Friday as the
narrative was the only remaining thing to be done.
Mr. Reynolds stated that the City had to follow through on the certification of tle application
which :could take longer than the application itself, He added that this would clear the way for the appli-
cation, and if no funds were received this year, the priority for next year would be higher.
Mr. Reynolds said that there was a policy question that would have to be examined, this being to
what extent, if at all, should the general customer pay to assist in the extension of the very heavy expen-
ditures that would be required to get interceptor sewers out for additional sewer service. He added that
a 50¢ average cost figure had been given which was pretty high; that the City could go from there to nothin.
Mr. Reynolds said that the less the general water user pays, the more the property assessment or capacity
charges would have to be. He added that this was something to consider very seriously.
Councilman Carter asked what other communities had done. Yr. Reynolds replied that some did quit
a little and some did nothing, and it was his opinion that those who did quite a little were in the best
position row. Re cited Idaho Falls which had been financed by the e:dsting rate pavers, and they were now
in a position that any section of town could be serviced; they could require a developer to put in his late
als as they had the interceptors provided for him. He added that Boise had recently adopted a capacity
charge, and this had become increasingly popular. Mr. Reynolds stated that this was one avenue that had no
been done into, but he would be happy to discuss this alternative. He added that when raw land came in the
capacity charge figures at $500.00 an acre which allows raw land to carry its load.
Councilman Dakan asked if there had been any complaints when the sewer rates had been raised.
Mayor Carpenter and a few of the Councilmen had had a few calls, but when it had been explained the increas
was accepted. Councilman Banks stated that he felt a lot of the rate payers were not aware that they would
have to pay more, and he felt it was legitimate to adopt the capacity charge.
Variance granted - Regular Baptist Church
Mayor Carpenter stated that he had a letter from Pastor Deboar of the Regular Baptist Church sayi:
that a petition to grant permission to put a trailer at the rear of the Legion's lot for the purpose of a
Sunday School had been circulated. He stated that of the four residents in that area, three had signed.
Ad the Council voted at the previous meeting to give permission with the provision that approval of the exi
ins residents in the area ,ra$ received, the vari oce was granted.
Discussion on Marble Front Road
For the information of the Council of the problems which arise in the Building and Engineering
Departments, YAr. Lewis presented a map showing the area around Marble Front Road. He pointed out the probl
of where to allow people to build, some of the decisions or alternatives in building streets, and the prob-
lems of right- of-way.
There being no further business to come befire the Council at this time, it was moved that the
meeting recessuntil August 7th. A vote was taken, and the motion c &h, meeting i e e t 9:140 P.M
0
Mayer
Depu City Clerk
COUNCIL CW1BEE3SS
August ?, 1 972
8:00 P.M.
The regular monthly meeting of the City Council met in the Council Chambers of the City Hall. with
Mayor Charles W. Carpenter presiding.
Upon Roll Call, the following Councilmen answered present: C. A. "Chet" Davenport, Joe Gamboa,
James R. Dakan, Lester E. Carter and Alfred H. McCluskey. Absent: Charles C. Banks.