HomeMy WebLinkAbout1977-05-09city council minutesBook 18 Page 133
SPECIAL ,MEETING
May 9, 1977
4:00 P.M.
The Meeting was called to order by Mayor P4sley.
The Roll of the City Council was called,.with the following
members present: McCluskey, Olesen, Williams, Banks, and
Bauman. Absent: Raymond.
(POLICY ON COST OF WATER MAIN E=NSION TO SUBDIVISIONS)
The Mayor.explained that this Special Meeting was called as a
result of a Committee Meeting chaired by Councilwoman Williams
in an attempt to develop a policy on water main extensions.
Besides the work the Committee did on,this policy,,the City
Engineer spent considerable time with the Water Superintendent.
The Mayor requested the City Engineer to present the policy
and, his suggestions as well;. Much discussion followed in regards
to this proposed policy. The policy was then presented to the
City Council for approval as follows:
An application will be required for all extensions to the City
water system on forms available in the City Engineer's office.
The application is to,be submitted to the Water Superintendent,
who will provide the design for the water main extension or the
water main system. The Water Superintendent will prepare an
estimate cost of the constructi!D-n of the system to be installed.
He will also prepare ,an estimate of, cost based on the installation
of 6" pipe where the water main extension exceeds 6 inches or
based on 6" pipe for those parts of any water systems that exceed
6 inches.
The Water Superintendent submits the application, the design
and the estimates to the City Engineer.
The.City Engineer's office will then prepare the assessment costs
using the assessment basis established hereafter in this policy.
The Engineer's report shall include the following:
1., An-estimateof those assessment ,costs immediately availa-
ble upon completion of the extension as requested in the
application..
2. The assessment.costs.of other properties which the water
main extension or the water system would serve but are
not included in the application.
3. The actual cost of the system as,prepared by the Water
Superintendent.
4. The difference between (1) and (3) above which is the
additional funding required to install the system
requested with the recovery of the,costs,,in item (2)
in the future at some time after the completion of the
system.
5. The difference between .the sum of (1) and (2) and of
(3) which is the unrecoverable cost funded by the City.
The..City Engineer will.submit his report to the Council, Mayor,
Finance Director and Water Superintendent.
Applications for extensions..to.the.,Ci-ty..Water system shall be
considered as follows:
nooK J-0
Page 134
1. If the total funding 're , by the City is less than
$ 3,000, and the City funds are available, the Water
Superintendent may 'proceed` with the installanon.
2. If the total City fundilig exc eeds $ 3,-000, the application
shall be considered by the City Council,before the Water
Supe authorized to proceed with the iast
3. if any part of the total of the City fundiLng'or the entire
amount of.- the City funding is not available by the time the
applicant desires- the 'extension "to be 'instal'led,-consideration
will be given to entering into an agreement with the City
by whi6h the applicant , may - install any part of or the
entire -extension or -system - at his - expense subjedt to the
extension , Or " system meeting' all 'of the reqiuirements of the
City of Caldwell with regard to materials, work and
installation'. The agreement shall' inclade:
a. The requirement that all installations shall be made
in accordance with `the specificaH6ns of the City of
Caldwell .
b. -Approval by the City of the contractor who wil]_
perform the work , 1
c� Certificate of insurance which 'will 'telieve 'the City
of liability.
d:. A performance bond in the name of the City which assures
City
'the 'pe:rformanc�e' 'of the" contrac 'or 3.n meeting the cL
requirements.
e. There will be no reimbursement to the applicAnt by
the City or by the adjacent property owners for any
o the costs of installing the - extension or System.
f. Reimbursement of all construe tion inspection costs
to tho'City Engineering Department or its authorized
representative-:
4, Where water main exte are required to reach the property
to be �served, the 'exter-slon may` : be 2*"nstalled:
a. As in No. 1 of this section.'
b. If City funding is not available the applicant may install
the extension in"ac'cord'ance With No. 3 of this section.
C. By paying the total cost of the extension to the City
for installation by the City without any future
reimbursement to tne applicant by the City or by
adjacent property owners.
5'. Paymen't of the asses sment" - determined "ID' the Engineer will be
y
made'as follows:
a. Residential areas
1) 20% within '15 Jays of'the'date of application and
this pa n4irt is -ion-±ef
-
2) 30% upon nctification materials have been
received by t1h-e , at . Y.
.3) The remaining 50% upon notification of the completion
of the system.
Book 18
Page 135
b. For Commercial and Industrial Areas
1) 100% within 15 days of the date of application.
If the initial payment is not made within the 15 day period,
as stated above, the application will be reconsidered on
the date the payment is paid and the priority re- established
as of.this same date.:.
b. Water main extensions will be installed in accordance with
the work schedule established by the -Water Superintendent
coos- intent with_the work load requirements.
7. The funding of any extension must be within the budgetary
requirements of the City.
The assessment basis shall be -as follows
1. The unit cost shall be established on a per front
foot basis and shall be X5':00 per front' foot
2. For residential areas:
a. The unit cost per front foot shall be assessed
on inside lots. The determination of the front
feet for inside lots around a cul -de -sac shall
be based on an average of the widths of the front
feet for the remaining inside lots within the
block.
b. The unit cost per front foot shall be. assessed on
the longest side of a corner lot. The frontage
for a corner,lot shall include the tangent of the
corner radius.
C. If the property frontage is not platted, the
assessable frontages for purpose of assessment
shall be those actual dimensions of the building
site as defined in the legal description of the
site submitted with the application but shall be
within the following limits;
1) Inside building site frontage - minimum
of 70 feet, maximum of 100 feet.
2) Corner building site frontage for longest
dimension of the site - minimum 100 feet,
maximum 150 feet.
3. Commercial and industrial areas:
a. The assessable frontages for platted areas shall
follow the same procedure as for platted residential
sites.
b. Assessable frontages for unplatted land shall be
as follows:
1) The actual frontage of the building site
on a public right -of -way if the site is not
a corner.
2) If the building site is bordered by more
than one street right -of -way, the assess-
able frontage will be the frontage on the
street with the greatest distance.
-- - -
boor, 16 Page •136
4, Planned unit developments small include co=?on
areas in assessable frontages.
This policy shall become effective immediately on adoption
and shall be applied to all subsequent buildiiag permm.ts and
extensions.
It was then MOVED by McCluskey,. SECONDED by Olesen'to approve the
Policy as presented by - the City Engineer.
Roll call vote. Those voting yes: McCloskey, Olesen, Williams,
Banks, and Bauman. Thorne voting no: none. Absent and -not
voting: Raymond.
MOTION CARRIED
It was then suggested by the City Council that copies of this
new policy be sent to all of the contractors, to the real ors, and
to Canyon A- stract.
There "being "no f business, the meeting was adjourned at
4:55 P.N.
APPROVED AS written THIS 1 7 th DAI, OF Ma y 1977.