HomeMy WebLinkAboutNarrative_SyringaLotSplit_V1Application Narrative 0 Syringa Ln
Applicant: OC Building Co LLC Authorized Representative: Eric Giovannucci, Manager
Subject Property: 0 Syringa Ln (±1.76 acres)
Project Summary
OC Building Co LLC requests approval to subdivide the existing 1.76-acre parcel at 0 Syringa
Ln into four (4) buildable residential lots, together with a concurrent lot line adjustment along the
westernmost boundary to incorporate the adjoining parcel to the west. Refer to the attached
survey for the accurate metes-and-bounds depiction of the adjusted lot line and resulting lot
configurations.
Requested Actions (To Run Concurrently)
1. Subdivision Creation of four (4) buildable lots from the existing ±1.76-acre parcel.
2. Lot Line Adjustment Modification of the furthest west lot line to adjoin the parcel to the
west, as depicted on the survey of record submitted with this application.
The applicant requests that both actions be processed and approved concurrently as a single
coordinated application package.
Prior Approvals and Coordination
• Planning and Zoning: The proposed subdivision and lot configuration have been
reviewed and approved by Planning and Zoning.
• Engineering: Engineering has approved deferment of the Jay Ln frontage improvements.
This deferment was granted prior to and is incorporated into this application.
Improvement Commitments
• Jay Ln Improvements: Deferred per Engineering's prior approval. Timing and scope
will follow the deferment terms on record.
• Syringa Ln Improvements: The applicant commits to completing all required Syringa
Ln frontage improvements at the time of building permit issuance, consistent with the
standards and details specified in the approved engineering plans.
Conclusion
The proposed four-lot subdivision and concurrent west lot line adjustment are consistent with the
underlying zoning, the previously approved Planning and Zoning recommendation, and the
Engineering-approved improvement deferment. OC Building Co LLC respectfully requests
approval to proceed concurrently on both actions as outlined above.