Loading...
HomeMy WebLinkAboutLandscapePlan_VerticalVenues_V1CH 1 LL C HA N G A R DATE: PROJECT NUMBER: DRAWN BY: CHECKED BY: FILE: REVISIONS: SHEET NAME & NUMBER: 49 1 6 E Li n d e n St Ca l d w e l l , Id a h o 83 6 0 5 PR O J E C T TI T L E : PR O J E C T AD D R E S S : c Ph i l l i p Ch r i s t e n s e n Ar c h i t e c t PLL C Th i s do c u m e n t is th e pr o p e r t y of Ph i l l i p Ch r i s t e n s e n Ar c h i t e c t PLL C an d is no t to be du p l i c a t e d wit h o u t wr i t t e n au t h o r i z a t i o n . SITE LANDSCAPING PLAN A1.2 Tuesday, September 16, 2025 2024-010 PCC PCC 2024-010 base V21.pln JURISDICTION STAMP NUMBER DESCRIPTIONDATE Tuesday, September 16, 2025 BL D G PE R M I T AP P L I C A T I O N SE T | 20 2 5 -Se p t e m b e r -16 Phillip Christensen Architect PLLC 549 IL Route 34 N Herod, Illinois 62947 (208) 918-2183 philc.pca@gmail.com 01 2025-05-21 | PLAN REVIEW 02 2025-06-17 | PLAN REVIEW, NEW PARKING LOT 03 2025-09-04 | PLAN REVIEW 04 2025-09-16 | PLAN REVIEW 24'-0"4'-4"18'-0"18'-0"2'-1" 5' - 0 " 4'- 1 0 " 5' - 0 " 18 ' - 0 " 26 ' - 2 " 25 ' - 1 " 26'-1"55'-4"26'-8" 21'-6"18'-0"2'-0" 20 ' - 0 " 10 ' - 0 " 3'- 8 " 3'- 8 " 26 ' - 0 " 18'-0"2'-1"26'-9" 9'-9"12'-7"24'-10"14'-0"66'-6" 7' - 8 " 8'-0"10'-0"12'-0" 24 ' - 0 " AL L WE A T H E R SU R F A C E TO EDGE OF PAVEMENT OF LINDEN STREET,REFER TO CIVIL DRAWINGS R 3'-4" R 1'-0" R 1'-0"R 1'-0" 9'-0"TYP9'-0"TYP2'-10" 14'-0"2'-4" 9'- 0 " TY P 9'- 0 " TY P 9' - 0 " TY P 9' - 0 " TY P 9' - 0 " TY P 8'-0"5'-0"8'-0"8'-0"8'-0"9'-0"TYP9'-0"TYP 9'-0"TYP 24'-2"21'-6" 283.93 sq ft 24'-2"24'-9"24'-3"26'-0" 26 ' - 4 " 23 ' - 7 " R 26'-0" R 26'-0" R 26'-0" R 24'-0" 9-SPACE BICYCLE PARKING APPROXIMATE FUTURE AIRPORT ACCESS- RESTRICTING FENCE, NOT IN THIS SCOPE, TYP ADJACENT PARCEL BOUNDARY LINES (CALDWELL AIRPORT PROPERTIES) NEW WATER METER, REFER TO CIVIL DRAWINGS SUBJECT LEASE LOT LINE BOUNDARY (100'x120') NEW POWER TRANSFORMER AND UNDERGROUND POWER CONDUIT, REFER TO ELECTRICAL DRAWINGS NEW STREET LIGHT PER SL-1135, REFER TO CIVIL DRAWINGS PROVIDE NEW PRESSURE IRRIGATION SYSTEM, CONNECT TO EXISTING AIRPORT TERMINAL BUILDING PRESSURE IRRIGATION SYSTEM PER AIRPORT MANAGER, COORDINATE LOCATION WITH CITY ENGINEER AND AIRPORT MANAGER UTILITY EASEMENT, REFER TO CIVIL DRAWINGS M VAN ACCESSIBLE NO PARKING NO PARKING 5' - 0 " 1' - 6 " 5'-4"5'-0"6'-0"13'-8" 10 1 ' - 9 " 22 ' - 5 " 18 ' - 0 " 5'- 0 " 10 ' - 0 " UP 6" UP 6" NEW AIRCRAFT HANGAR SPACE 12,000 GSF EXISTING AIRPORT TERMINAL BUILDING EXISTING ELEC. BLDG NEW CONCRETE SURFACE, SEE CIVIL 5,215 GSF, 11.7% OF NEW DEVELOPMENT NEW GRASS SURFACE, SEEDED 7,822 GSF, 17.6% OF NEW DEVELOPMENT NEW GRAVEL SURFACE 12,223 GSF, 0% OF NEW DEVELOPMENT (gravel surface is fully off-site, temporary in nature, and has already been placed, per City of Caldwell requirements, under direction of Hallie Hart, Caldwell City Engineer) NEW SHRUB, 2-GALLON MIN, PERENNIAL, WITH MULCH AS NECESSARY NEW ASPHALT SURFACE, SEE CIVIL 19,516 GSF, 43.8% OF NEW DEVELOPMENT EXISTING ADJACENT BUILDINGS NEW BUILDING 12,000 GSF, 26.9% OF NEW DEVELOPMENT N 02 SCALE: 1" = 20'1 SITE LANDSCAPING PLAN 2 LANDSCAPING LEGEND 03 04 TRUE NORTH BC25-000130 9/17/2025