Loading...
HomeMy WebLinkAboutButte Fence Bid - Cirrus Pointe WestSUBCONTRACTOR INITIAL 1 00Land Base MTPA (Con-Subcon)(v.11-3-2021 Final) Work Agmt WORK AGREEMENT No. TO LAND BASE MASTER TRADE PARTNER AGREEMENT No. CONTRACTOR'S STATE LICENSE No: SUBCONTRACTOR’S STATE LICENSE No: REGIONAL OPERATIONS CENTER: DIVISION OFFICE: WORK DESCRIPTION: OWNER: CONSTRUCTION LENDER: PROJECT NAME: WORK AGREEMENT AMOUNT: This Work Agreement to the Land Base Master Trade Partner Agreement (the “Work Agreement”) is entered into by and between (“Contractor”), whose address is , and telephone number is , and (“Subcontractor”), whose address is , and telephone number is . RECITALS A.Contractor and Subcontractor entered into that certain Land Base Master Trade Partner Agreement on or about , Contract No. (the “Agreement”). As used herein, and except as hereby expressly provided, all capitalized words and phrases shall have the same meanings as defined in the Agreement. B.Contractor desires to have Subcontractor perform work within the Project referenced above (the “Project”) as set forth in Subcontractor’s bid package for the Project, which was submitted to Contractor via Contractor’s electronic bid system, and is hereby approved by Contractor and incorporated herein by reference (the “Work”). C.Contractor and Subcontractor desire to amend the Agreement as more particularly set forth herein. TERMS AND CONDITIONS NOW, THEREFORE, in consideration of the foregoing recitals, and the covenants and conditions contained herein, and for other good and valuable consideration, the receipt of which is hereby acknowledged, Contractor and Subcontractor hereby agree to amend the Agreement as follows: 1.The Scope of Work is set forth in Exhibit “A” hereto. 2.Pricing is established in the “Pricing Schedule (Basis of Contract and Progress Billing Sheet)” attached hereto as Exhibit “B”. 3.The Project Location shall be as set forth in Exhibit “C” hereto. 4.The List of Sub-subcontractors shall be as set forth in Exhibit “D” hereto. 5.The Plans and Specifications for the Work shall be as set forth in Exhibit “E” hereto. Lennar Homes of Idaho LLC 25039770 4614525 RCE-57241 RCE-58187 West Boise Fencing Lennar Homes of Idaho, LLC N/A Cirrus Pointe Ph 9 $301,245.89 10/09/2025 Lennar Homes of Idaho LLC 408 S Eagle Rd. Ste. 100 Eagle, ID 83616 (208) 803-3500 Butte Fence 5233 W. Franklin Rd. Meridian, ID 83642 208-695-8078 03/02/2022 4614525 Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA SUBCONTRACTOR INITIAL 2 00Land Base MTPA (Con-Subcon)(v.11-3-2021 Final) Work Agmt 6.The Construction Schedule shall be as set forth in Exhibit “F” hereto. 7.Work approved for construction is set forth in Subcontractor’s bid package for the Project described above. 8.Prior to commencing the Work, Subcontractor shall comply with all insurance requirements set forth in Schedule “4” to the Agreement which requirements are incorporated herein by this reference as though set forth herein, including, without limitation and if applicable, the “OCIP Addendum” if attached thereto. If the “Insurance Requirements” are added to or amended by this Work Agreement, they are set forth in the “Modified Insurance Requirements” attached hereto as Exhibit “G”. 9.The Pricing Schedule attached hereto shall be effective on the date set forth above. Any changes to the Work, or the Pricing Schedule, shall become effective only upon execution by all parties hereto of an amendment to the Work Agreement (the “Amendment”). Subcontractor Rates and Rental Rates are as set forth in Exhibit “H” hereto. 10.Contractor may, from time to time, issue written notices to proceed/purchase order requests identifying specific locations on which the Work is to be performed (“Scheduling Notice”, “Received Order”, or “Notice to Proceed”). Contractor shall have no obligation to issue any Scheduling Notice(s) during the term of this Work Agreement. THIS WORK AGREEMENT IS NOT AN AUTHORIZATION TO PROCEED WITH WORK, AND SHALL NOT BECOME EFFECTIVE WITH RESPECT TO THE WORK OF SUBCONTRACTOR UNLESS AND UNTIL CONTRACTOR ISSUES SCHEDULING NOTICE(S) TO SUBCONTRACTOR AUTHORIZING THE SPECIFIC WORK OF SUBCONTRACTOR TO BE PERFORMED, AND THIS WORK AGREEMENT SHALL BE BINDING ONLY AS TO THE WORK SO AUTHORIZED BY CONTRACTOR. SUBCONTRACTOR SHALL PERFORM NO WORK WITHOUT RECEIVING CONTRACTOR’S WRITTEN SCHEDULING NOTICE(S) FOR SUCH WORK. SUBCONTRACTOR AGREES TO COMMENCE SUCH WORK AS MAY BE AUTHORIZED BY CONTRACTOR BY MEANS OF EACH SCHEDULING NOTICE(S), AND SUCH SCHEDULING NOTICE(S) SHALL BE EFFECTIVE IMMEDIATELY UPON ISSUANCE BY CONTRACTOR WITHOUT NEED FOR FURTHER ACCEPTANCE THEREOF BY SUBCONTRACTOR. If the Work authorized by a Scheduling Notice is not commenced on the date specified in the Scheduling Notice, Contractor may, in its sole discretion, declare such Scheduling Notice null and void. Contractor may, but shall not be obligated to, furnish Subcontractor with a progress schedule for all or any portion of the Work which, if furnished, may be amended from time to time by Contractor and shall be considered a part of this Work Agreement. Subcontractor acknowledges that neither this Work Agreement nor the issuance by Contractor of a progress schedule constitute any representation by Contractor that a minimum or specified number of Scheduling Notices will be issued. As to that portion of the Work covered by a Scheduling Notice, such schedule shall control over any other provision of this Work Agreement or progress schedule regarding time for performance. Except to the extent the Agreement is supplemented by this Work Agreement or such other Work Agreements that may have been entered into by the parties hereto pursuant to the Agreement, the terms and conditions of the Agreement shall remain unmodified and in full force and effect. In the event of conflict between the terms and conditions of the Agreement and the terms and conditions of this Work Agreement, the terms and conditions of this Work Agreement shall prevail, but only with respect to the Work covered hereby. [Signatures on following page] Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA SUBCONTRACTOR INITIAL 3 00Land Base MTPA (Con-Subcon)(v.11-3-2021 Final) Work Agmt IN WITNESS WHEREOF, the parties hereto have executed this Work Agreement as of the day and year first above written. “Contractor” By: Name: Title: By: Name: Title: By: Name: Title: By: Name: Title: License No.: “Subcontractor” By: Name: Title: By: Name: Title: Fed. I.D. No.: License No.: Lennar Homes of Idaho LLC Darren lloyd Land Development Manager Michelle Ames Director of Land Development Jeff Clemens Division President RCE-57241 Butte Fence Tony Williams 86-2100323 RCE-58187 Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA 10/9/2025 Sales Rep 10/9/2025 10/13/2025 10/13/2025 SUBCONTRACTOR INITIAL 4 00Land Base MTPA (Con-Subcon)(v.11-3-2021 Final) Work Agmt Exhibits to Work Agreement Exhibit “A” Scope of Work Exhibit “B” Pricing Schedule (Basis of Contract and Progress Billing Sheet) Exhibit “C” Project Location Exhibit “D” List of Sub-subcontractors and Suppliers Exhibit “E” Plans and Specifications Exhibit “F” Construction Schedule Exhibit “G” Modified Insurance Requirements / OCIP Exhibit (if applicable) Exhibit “H” Subcontractor Rates and Rental Rates Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA SUBCONTRACTOR INITIAL 5 00Land Base MTPA (Con-Subcon)(v.11-3-2021 Final) Work Agmt EXHIBIT “A” TO WORK AGREEMENT SCOPE OF WORK See Attached Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA Exhibit A 1 of 5 SUBCONTRACTOR INITIALS 00Land Base MTPA (Con-Subcon)(v.11-3-2021 Final) Work Agmt EXHIBIT “A” TO WORK AGREEMENT SCOPE OF WORK Site Fencing Scope of Work shall include but is not limited to the following; Provide all material, labor, equipment, service, etc. necessary and incidentals for the complete Site Fencing scope of work as per Landscape Plans and specifications by Kimely-Horn and Associates, uniform building code, Soils Report by Geo Tek, dated March 6, 2024, federal, state and local governing agencies and Lennar Homes of Idaho, LLC (Lennar). Scope includes all applicable City of Nampa Idaho Standards and may require the Subcontractor to obtain AHJ (Authority Having Jurisdiction) approval of submittals prior to construction. Contract includes but is not limited to the following: GENERAL 1. Subcontractor has visited the site and observed existing conditions and incorporated all reasonable impacts into their proposal price. 2. All Drawings, Specifications, Changes and RFI’s are distributed via Lennar’s Land Development Manager. It is the responsibility of this Subcontractor to request all associated files and continue to request updates as the job progresses. 3. Comply with all notes on the Civil and applicable Landscape Drawings 4. Compliance with all state regulations in conjunction with city ordinances is always required. 5. Subcontractor is to provide a rough schedule and durations for their scope of work as well as the earliest available start date and shall work closely with Lennar to schedule and coordinate its scope of work. 6. Provide coordination with other trades and advise Lennar in writing if any work is required to be completed prior to commencement to avoid moving of form work or delaying operations. 7. Provide protection of subcontractor’s own work from other trades operations. 8. Subcontractor is aware that the work of the project is around or near existing homes, neighborhoods, facilities, and utilities, and will use extreme care not to disturb or damage them. If disruption or damage does occur, Subcontractor will take immediate action to repair or replace such damage. 9. Provide Lennar with As-builts or coordination with Stack Rock Group for As-Built documentation. 10. All plant material and workmanship shall be guaranteed for a period of one year beginning at the date of Acceptance by Lennar. Replace all dead or unhealthy plant material immediately with same type and size at no cost to Lennar. SAFETY 11. Have a qualified foreman onsite at all times during execution of this scope of work able to communicate in verbal and written form to the satisfaction of the Lennar. 12. Provide temporary bracing/shoring as may be required to complete this scope of work. 13. Subcontractor shall always enforce strict discipline and good order and shall not employ any unfit person or anyone not skilled in the task as assigned by this subcontract. Conformance to OSHA safety orders is always required. Loud music will not be allowed on site. No loud or foul language will be permitted. All workers will be properly attired and conform with correct PPE, including but not limited to: Hi-Vis, long pants, shirts with sleeves, hard-sole work shoes in good condition and all safety equipment required. Subcontractor shall provide Lennar with copies of all OSHA required Safety Manuals and SDS sheets as soon as work Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA Exhibit A 2 of 5 SUBCONTRACTOR INITIALS 00Land Base MTPA (Con-Subcon)(v.11-3-2021 Final) Work Agmt commences. Subcontractor’s Safety Manual shall be onsite and adhered to while working on any Lennar site. SWPPP COMPLIANCE 14. Subcontractor will comply with SWPPP plan requirements. SWPPP plan and BMP installation/removal maintenance and inspections provided by others. 15. Subcontractor is responsible for removal of dirt, mud and/or debris generated by Subcontractor from sidewalks and roads in the immediate vicinity of the work. Provide all measures required such as cleaning truck tires to prevent the tracking of mud onto adjacent roads. If Subcontractor causes mud and/or debris to be tracked onto the roadways, the Subcontractor agrees to clean and maintain such areas on a regular basis. Subcontractor is solely responsible for any fines levied from outside agencies for failure to maintain roads and/or sidewalks in a clean condition, from the debris generated from Subcontractors vehicles. 16. Daily clean up and removal of all debris related to this scope of work. 17. Provide protection of soils from being contaminated by oil, grease, etc. 18. Provide dust control while onsite until sidewalk operations are completed and cleanup of all finished paved areas. PROJECT SPECIFIC 1. Assist with and coordinate all necessary inspections required for the scope of work for the subcontract. Including reporting all results to Lennar LDM. 2. Protect existing items as shown on the civil site plan. All utilities shall be located prior to construction and protected. Any damage to structures, utilities or concrete will be replaced at subcontractor's expense. a The site has many existing improvements such as underground utilities, curb and gutter, light poles and sidewalks. b See Civil Plans for information about existing features. Refer to Civil Plans for grading information and all existing and/or proposed drainage pipes & locations, utilities. Subcontractor is to protect all drainage and utilities at all times. 3. All labor and materials to complete: a In the event of a discrepancy, notify the Lennar Land Development Manager immediately. b The Vinyl Fence shall be located and constructed per the Plans, Specifications, Codes, Ordinances, and/or the Engineer. Work shall include the furnishing of all labor, equipment, tools, and materials required for the completion of the Vinyl Fence. c Subcontractor shall verify compatibility of the fencing design with existing grades and site conditions. Panels to be built on correct slope and angles. d All fencing shall be constructed true and plumb. The work shall not be considered completed until all work has been verified and signed off by Lennar and the work area has been cleaned up. e Vinyl fence material to be installed shall be new and free from defects. Any defective material shall be rejected and not accepted for installation by the Contractor. If defective material is installed subcontractor will replace at their expense. f Vinyl Fence shall be 6’ vinyl privacy Fence – white Style per Lennar Community Standards below. g Subcontractor shall “cone” concrete around posts at grade level for proper drainage away from footings. h Subcontractor shall take extra care to protect all existing improvements. Any damage to Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA Exhibit A 3 of 5 SUBCONTRACTOR INITIALS 00Land Base MTPA (Con-Subcon)(v.11-3-2021 Final) Work Agmt existing improvements directly resulting from the Subcontractor’s negligence will be repaired at the Subcontractor’s sole expense. i Subcontractor shall clean up all debris and trash resulting from their work and shall re-grade and spread excess soil from footings. j Subcontractor shall excavate for footings. k Concrete Footings shall be of the size and type as indicated on drawings or as per Lennar’s specifications. Earth forms may be used for footings only where soil is firm and stable and concrete will not be exposed. Lennar Community Fencing Standard Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA Exhibit A 4 of 5 SUBCONTRACTOR INITIALS 00Land Base MTPA (Con-Subcon)(v.11-3-2021 Final) Work Agmt EXTRA WORK/CHANGE ORDERS No extra work or changes to the work shall be performed by subcontractor or paid by Lennar unless such extra work or change to the work has been authorized in writing by Lennar and agreed to by subcontractor prior to performance thereof. Additive change orders shall not be effective until executed by the subcontractor and Lennar; deductive change orders shall be effective upon signature of Lennar only and delivery of notice to subcontractor. The cost changes shall include all labor and equipment to complete the work and shall adhere to the rates listed below or attached to this Exhibit; no further mark-ups are to be added. All extra work or change order must be billed to Lennar within 90 days of completion of work. Any extra work/change order invoice for such work received after 90 days from the date of completion is subject to rejection and non-payment. LABOR/EQUIPMENT RATES Below/attached are current remobilization fees and T&M rates for all labor and equipment expected to be used on the job. Labor and Equipment Rates shall be used to evaluate the cost of all additional work. All equipment shall include fuel, lubrication, operation and all maintenance. No overtime premium will be paid on equipment, and no further mark-ups are to be added. INSERT LIST OF RATES REQUESTED AT BID TIME Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA Exhibit A 5 of 5 SUBCONTRACTOR INITIALS 00Land Base MTPA (Con-Subcon)(v.11-3-2021 Final) Work Agmt CONTRACT TOTAL BREAKOUT The contract value for this scope of work is below and includes all work included in the construction documents and specifications. Description Cost Contract Total Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA SUBCONTRACTOR INITIAL 6 00Land Base MTPA (Con-Subcon)(v.11-3-2021 Final) Work Agmt EXHIBIT “B” TO WORK AGREEMENT PRICING SCHEDULE (BASIS OF CONTRACT AND PROGRESS BILLING SHEET) See Attached Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA Lennar Homes of Idaho, LLC Community:Cirrus Pointe West 408 S Eagle Road, Suite 100 Phase: 9 Eagle, ID 83616 Contractor:Butte Fence Contact Person:Tony Williams Phone Number: SCHEDULE OF VALUES QTY UNIT UNIT PRICE TOTAL COST 6' Tan Vinyl T&G 3,438.00 LF $29.29 $100,699.02 6' Tan Vinyl T&G w/ Lattice 1,963.00 LF $35.02 $68,744.26 3' Tan T&G 162.00 LF $23.16 $3,751.92 6' White Vinyl T&G 3,368.00 LF $27.85 $93,798.80 6' White Vinyl T&G w/Lattice 869.00 LF $33.85 $29,415.65 3' White T&G 216.00 LF $22.39 $4,836.24 0.00 CY $0.00 $0.00 0.00 CY $0.00 $0.00 0.00 LS $0.00 $0.00 Total Cost $301,245.89 EXHIBIT B Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA 10/9/2025 10/9/202510/13/2025 10/13/2025 SUBCONTRACTOR INITIAL 7 00Land Base MTPA (Con-Subcon)(v.11-3-2021 Final) Work Agmt EXHIBIT “C” TO WORK AGREEMENT PROJECT LOCATION Real Property located in , County of , State of , and described as follows (Insert legal description and modify description as it changes from phase to phase): of in the county of in the state of Idaho Caldwell Canyon Idaho This master planned project - Bentley Meadows - is located within the city Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA SUBCONTRACTOR INITIAL 8 00Land Base MTPA (Con-Subcon)(v.11-3-2021 Final) Work Agmt EXHIBIT “D” TO WORK AGREEMENT LIST OF SUB-SUBCONTRACTORS/SUPPLIERS (Labor, Materials, Equipment, Supplies and/or Supervision) List below the name and business address of each Sub-subcontractor approved by Contractor who will perform any portion of the Work under the Agreement. Also list the portion of the Work which will be done by such Sub- subcontractor. The listing of more than one Sub-subcontractor for each item of Work to be performed with the words "and/or" is not permitted. List below the name and business address for material suppliers. % OF TOTAL CONTRACT SUB-SUBCONTRACTOR / SUPPLIER WORK PERFORMED MATERIAL SUPPLIED *See note above *Email this information to your Lennar Land Development Manager before work commences. Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA SUBCONTRACTOR INITIAL 9 00Land Base MTPA (Con-Subcon)(v.11-3-2021 Final) Work Agmt EXHIBIT “E” TO WORK AGREEMENT PLANS AND SPECIFICATIONS Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA SUBCONTRACTOR INITIAL 9 00Land Base MTPA (Con-Subcon)(v.11-3-2021 Final) Work Agmt EXHIBIT “E” TO WORK AGREEMENT PLANS AND SPECIFICATIONS Naismith Commons Subdivision Phase 1 Construction Plans - Approved for Construction 05/14/24 Naismith Commons Subdivision Can Ada Road Construction Plans - Approved for Construction 05/14/24 Naismith Commons Subdivision Star Road - Approved for Construction 04/26/24 City of Star Standard Construction Specifications Star Sewer Water District Standard Specifications Ada County Highway District Specifications Idaho Standards for Public Works Construction Idaho State Plumbing Code, Idaho State Electrical Code, and Federal and State Laws 1. Bentley Meadows Subdivision - Civil Construction Set - EDM Partners Dated June 11, 2024 - Approved for Construction by Nampa Engineering Division - Dated 6/20//24 2. Bentley Meadows Subdivision - Landscape Plan Set - Stack Rock Group Dated 06.07.2023 3. Geotechnical Investigation Report - Atlas Technical Consultants, LLC Dated December 9, 2022 4. City of Nampa 2023 Engineering Development & Policy Manual 5. City of Nampa 2023 Standard Construction Specifications 6. City of Nampa 2023 Traffic Impact Study Policy 7. 2020 Idaho Standard for Public Works Construction (ISPWC) 8. Nampa Highway District 1(NHD) 2022 Highway Standards and Development Procedures and Supplemental Specifications 9. Idaho State Plumbing Code, Idaho State Electrical Code, and Federal and State Laws. Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA SUBCONTRACTOR INITIAL 10 00Land Base MTPA (Con-Subcon)(v.11-3-2021 Final) Work Agmt EXHIBIT “F” TO WORK AGREEMENT CONSTRUCTION SCHEDULE N/A See Attached Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA SUBCONTRACTOR INITIAL 11 00Land Base MTPA (Con-Subcon)(v.11-3-2021 Final) Work Agmt EXHIBIT “G” TO WORK AGREEMENT MODIFIED INSURANCE REQUIREMENTS / OCIP EXHIBIT (if applicable) N/A Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA SUBCONTRACTOR INITIAL 12 00Land Base MTPA (Con-Subcon)(v.11-3-2021 Final) Work Agmt EXHIBIT “H” TO WORK AGREEMENT SUBCONTRACTOR RATES AND RENTAL RATES In the event that additional work is undertaken which is not covered by the Agreement and Subcontractor elects to proceed on a "time and material" or cost plus basis, the rates provided below shall prevail. Rates shall include all labor and equipment to complete the Work. The rates shall be billing rates, with no further markups to be added, and all equipment shall include fuel, lubrication, operation and all maintenance. No overtime premium will be paid on equipment. Subcontractor’s performance of any such work on a "time and material" or cost plus basis shall be subject to the provisions of Section 11 of the Agreement. N/ATBD Rock Excavation (if encountered): If rock excavation is determined to require third party for blasting or sawing or hammering (unless self-performing in which case all Change Order policies apply), then a minimum of two competitive proposals for such shall be provided for Lennar review and the lowest complete and reasonable proposal accepted. In addition, the spoils shall be disposed of by Subcontractor at Subcontractors rates included below. Docusign Envelope ID: CF526119-FB9D-432A-A82A-7B35E7BDB5FA