HomeMy WebLinkAboutBondAgreement_FaithLandingClubhouse (2)DEVELOPMENT SURETY AGREEMENT – Faith Landing Clubhouse – Page 1
City of Caldwell Planning & Zoning PERFORMANCE - SURETY AGREEMENT Faith Landing Clubhouse
THIS DEVELOPMENT SURETY AGREEMENT is made and entered into this December 16th, 2025 by and between the CITY OF CALDWELL, a Municipal Corporation, hereinafter referred to as CITY, and Scott Hedrick Construction, hereinafter referred to as DEVELOPER.
WITNESSETH: WHEREAS, DEVELOPER received approval from the CITY on December 11, 2024, of the
building permit (“Approved Plans”), for the development known as Faith Landing Clubhouse
(“Development”) located in the City of Caldwell; and WHEREAS, the approval granted by the CITY requires that certain non-life, non-safety and non-health improvements (“Required Development Improvements”) be made in connection with
construction of the development, and that such improvements be constructed in full compliance
with City standards, and the approved plans and specifications submitted with the project, as require by the CITY; and WHEREAS, the agreement or approval granted by the CITY requires that the Improvements are
to be made or constructed within a certain period of time; and
WHEREAS, the City Code of the City of Caldwell, Section 10-03-17 establishes procedures that guarantee the completion of Required Development Improvements by allowing the OWNER/ DEVELOPER to execute and file with the CITY an agreement providing for, among other things,
the period within which all Required Development Improvements shall be made and that if the
Required Development Improvements are not completed within the period specified, the CITY may complete the same and recover the full cost and expense thereof from the surety deposited from the DEVELOPER; and
DEVELOPMENT SURETY AGREEMENT – Faith Landing Clubhouse – Page 2
WHEREAS, OWNER/DEVELOPER has petitioned the CITY to allow for the acceptance of a performance surety bond in order to proceed with said development. The Required Development
Improvements to be covered by the performance surety bond would be as follows:
☒ Landscaping ☐ Sidewalks ☐ Pathways ☐ Fencing / Screening ☐ Parking Lots
☐ Public Amenities (See attachment A for list of public amenities) ☐ Common Areas
☐ Other; please describe: ___________________________________________________; and
WHEREAS, the CITY is agreeable to acceptance and filing of said Subdivision Plat upon the execution of this Agreement and compliance by the DEVELOPER with the provisions of the City Code, and any entitlement or development agreement conditions of the City of Caldwell; and
WHEREAS, it is understood and agreed that this obligation shall continue in effect until released in writing by the CITY, but only after the DEVELOPER has performed and satisfied the conditions listed herein.
NOW, THEREFORE, in consideration of foregoing mutual promises, covenants and agreements of the parties, it is hereby agreed as follows: 1. The DEVELOPER agrees to construct all of the Required Development Improvements to conform to the design, location, materials, and specifications for the indicated site
improvements, as required by the CITY in the above-mentioned CITY file and in accordance with the approved plans, land use entitlement conditions, and any associated development agreements. In addition, the DEVELOPER agrees to bind themselves to use such materials and to so construct all of the Improvements in compliance with all applicable City ordinances and State Codes and in a manner acceptable to the CITY
(hereinafter “City’s Requirements”). 2. The DEVELOPER agrees to restore at no cost to the CITY any monument erected or used as a survey marker or boundary of any tract, plat or parcel of land which monument is broken down, damaged, obliterated, removed or destroyed, whether willfully or not, by the
DEVELOPER, or the agents, employees or contractors of the DEVELOPER. 3. The DEVELOPER must have paid all sums owing to laborers, contractors, mechanics, subcontractors, material men and suppliers or others as a result of such work for which a lien against any property has arisen or may arise.
4. The DEVELOPER agrees that all said Improvements shall be completed on or before May 1, 2026. 5. The DEVELOPER agrees that if they default and abandon the improvements, fail to
complete the improvements in accordance with the approved plans, or fail to complete the Improvements within the time specified by the CITY, then the CITY, its employees and
DEVELOPMENT SURETY AGREEMENT – Faith Landing Clubhouse – Page 3
agents shall have the right at the City’s sole election to enter onto said property described above for the purpose of completing the Improvements. The DEVELOPER shall be jointly
and severably liable to the CITY for any and all loss and damage from such default,
abandonment or failure, either from the greater expense of so completing or repairing faulty or damaged Improvements, or from any other cause related to DEVELOPERS failure to complete the Improvements, which expense shall not be limited by any surety. This provision shall not be construed as creating an obligation on the part of the CITY or its
representatives to complete such improvements.
6. Upon execution of this Agreement, the DEVELOPER shall deliver to CITY a performance surety (Corporate Surety Bond, a Cashier’s Check, or a Cash Deposit) (“Performance Surety”) for the purpose of assuring DEVELOPER’S full and faithful completion of the
required Improvements as shown on the Construction and/or Development Plans, and as
specified herein. The amount of the Performance Surety shall be 150% of an itemized contractor’s bid, as shown on Exhibit “A” attached hereto and incorporated herein, for the completion of the Required Development Improvements in the sum of $77,947.50. CITY’S acceptance of such assurance shall not be construed as a limitation on the amount which
may be spent on completion of the Improvements.
7. At such time as all Required Development Improvements have been completed in accordance with the CITY’S requirements, the DEVELOPER shall notify the CITY of the readiness for final inspection. The DEVELOPER must obtain acceptance from the CITY
of the work completed, all on or before thirty (30) days after completion date set forth in
paragraph 4 above. 8. Upon certification by Planning and Zoning that all requirements of this agreement, and compliance with Chapter 10 and Chapter 11 of the CITY have been met, the following
shall occur:
A. The DEVELOPER shall submit a written request to the CITY to release the Performance Surety, including:
i. A statement from the DEVELOPER that the required Improvements are
complete and have been constructed in accordance with the City’s
Requirements, and
9. The CITY certification is not intended to relieve DEVELOPER or any contractor or material supplier of their responsibility for any defects in materials or workmanship of such Improvements.
10. Corrections: Any corrections required by the CITY shall be commenced within seven (7) days of notification by the CITY and completed within thirty (30) days of the date of notification. If the work is not performed in a timely manner, the CITY shall have the right, without recourse to legal action, to take such action under this agreement as described
in paragraph 5 above.
DEVELOPMENT SURETY AGREEMENT – Faith Landing Clubhouse – Page 4
11. Enforcement: It is specifically agreed by and between the parties that in the event any legal action must be taken to enforce the provisions of this bond, the prevailing party shall
be entitled to collect its costs and reasonable attorney fees as part of the reasonable costs
of securing the obligation hereunder. In the event of settlement or resolution of these issues prior to filing of any suit, the actual costs incurred by the CITY, including reasonable attorney fees, shall be considered a part of the obligation hereunder secured. Said costs and reasonable attorney fees shall be recovered by the prevailing party, not only from the
proceeds of this bond, but also over and above said bond as part of any recovery in any
judicial proceeding. The Surety hereby agrees that this Agreement shall be governed by the laws of the State of Idaho. 12. Bond Expiration: This bond shall remain in full force and effect until the obligations
secured hereby have been fully performed and a bond guaranteeing that the
DEVELOPER will correct, repair and maintain all such Required Development Improvements from any defects, omissions or irregularities in the construction, materials or work thereof for a period of two (2) years from the date of written acceptance of such Improvements.
13. In construing this Agreement, it is understood that either party may be more than one person and if the context so requires, the singular pronoun shall be taken to mean and include the plural, the masculine, and neuter, and that generally all grammatical changes shall be made, assumed and implied to make the provisions hereof apply equally to a single
or several individuals.
IN WITNESS WHEREOF, the parties shall cause this Surety Agreement to be executed by their duly authorized officers the day and year first written above.
Signatures on Next Page
DEVELOPMENT SURETY AGREEMENT – Faith Landing Clubhouse – Page 6
EXHIBIT A
ITEMIZED BID
Product/Service Description Qty.Unit Price Total
Fine Grade Does not include topsoil 1 $3,857.00 $3,857.00
Hunter Irrigation system Hunter Irrigation system value engineered to meet
requirements of landscape design due to no irrigation
plan at time of bid. Comes with one year warranty for
parts and labor.
1 $15,000.00 $15,000.00
Plant Material Installed as per drawing. Comes with one year warranty.1 $15,721.00 $15,721.00
Weed fabric and Decorative
Gravel
Installed in all planter areas.
3" Depth Permabark (Rock) Mulch
Commercial graded weed Fabric
1 $7,111.00 $7,111.00
Sod Installation Installed as per drawing.1 $10,276.00 $10,276.00
Not included
Top Soil Topsoil
Price is to be billed per yard and includes placement and
trucking.
12" Depth in lawn areas
18" Depth in planter areas
Up to but not to exceed 1105 yards
1105 $55.00 $60,775.00
This quote is valid for the next 30 days, after which values may be subject
to change.
By signing, I authorize all work to be performed. I agree to submit full
payment upon completion and understand full payment is required to
activate warranty and/or make any changes.
Signature: _____________________ Date: _____________
Total $51,965.00
URNESS INDUSTRIES, LLC.
19560 Lower Pleasant Ridge Road. Caldwell, ID. 83607
Scott Hedrick Construction
Faith Landing Clubhouse
6819 Noah Court
Caldwell, Idaho 83605
Estimate #5769
Sent on 12/16/2024
Phone 208.866.1955
Email ar@urnessindustries.com
Estimator:Justine
Project Name Faith Landing Clubhouse Landscape
Install
·
·
·
·
·
KEY NOTES (TYPICAL)
GENERAL LANDSCAPE NOTES
TREE PROTECTION NOTES
GENERAL IRRIGATION NOTES
SYMBOL CODE QTY BOTANICAL / COMMON NAME SIZE MATURE HXW CLASS
DECIDUOUS TREES
®
EVERGREEN TREES
EXISTING TREES
SYMBOL CODE QTY BOTANICAL / COMMON NAME SIZE MATURE HXW
SHRUBS
®
PERENNIALS
GRASSES
SYMBOL CODE QTY BOTANICAL / COMMON NAME CONT
SOD/SEED
OTHER
PLANT SCHEDULE
PROJECT:
DATE:
NO
.
IT
E
M
DA
T
E
RE
V
I
S
I
O
N
S
SHEET NO.
CHECKED BY:
DRAWN BY:
DESIGN BY:
5725 NORTH DISCOVERY WAY
BOISE, IDAHO 83713
PHONE (208) 639-6939
kmengllp.com
FA
I
T
H
L
A
N
D
I
N
G
C
L
U
B
H
O
U
S
E
68
1
9
N
O
A
H
C
O
U
R
T
,
C
A
L
D
W
E
L
L
,
I
D
8
3
6
0
5
LA
N
D
S
C
A
P
E
P
L
A
N
L1.0
22-093
11/25/24
AY
WHB
WHB
FO
R
A
G
E
N
C
Y
A
P
P
R
O
V
A
L
P:
\
2
2
-
0
9
3
\
C
A
D
\
L
A
N
D
S
C
A
P
E
\
C
O
N
S
T
R
U
C
T
I
O
N
P
L
A
N
S
\
2
2
-
0
9
3
C
D
L
A
N
D
S
C
A
P
E
P
L
A
N
.
D
W
G
,
AL
Y
S
S
A
Y
E
N
S
E
N
,
11
/
2
7
/
2
0
2
4
,
DW
G
T
O
P
D
F
.
P
C
3
,
--
-
-
1
RE
V
#
1
-
C
I
T
Y
C
O
M
M
E
N
T
S
10
/
1
4
/
2
4
A
AD
D
E
N
D
U
M
10
/
3
/
2
4
2
RE
V
#
2
-
C
I
T
Y
C
O
M
M
E
N
T
S
11
/
2
5
/
2
4
LANDSCAPE PLAN
0 30 60 90
Plan Scale: 1" = 30'
STATE OF IDAHO
LICENSED LANDSCAPE ARCHITECT
ALYSSA YENSEN
LA-1657711/27/24
EXISTING TREE REMOVAL CALCULATIONS
TOTAL MITIGATION REQUIRED
MITIGATION REQUIREMENTS
TOTAL MITIGATION PROVIDED
CONTACT INFORMATION
LANDSCAPE CONSULTANTARCHITECT
NOAH COURT
ORE
G
O
N
S
H
O
R
T
L
I
N
E
R
A
I
L
R
O
A
D
MIDW
A
Y
D
R
A
I
N
2
2
2
BC24-000142 12/11/2024
DECIDUOUS TREE PLANTING AND STAKING DETAIL
NTS
SHOVEL CUT EDGE
NTS
BIKE RACK DETAIL
NTS
6' METAL FENCE AND GATE
NTS
030201
08
BONDED RUBBER MULCH AND CONTAINMENT CURB
NTS06
BACKLESS BENCH DETAIL
NTS04
NTS07TOT LOT STRUCTUREBASKETBALL COURT
NTS
PLAN VIEW COLOR LAYOUTREFERENCE PHOTO
05
COURT PLAN VIEW LAYOUT
TOP VIEW
FENCE PANEL POST FOOTING
TOP VIEW
GATE POST FOOTING
REFERENCE PHOTOSPLAYGROUND EQUIPMENT LAYOUT
PROJECT:
DATE:
NO
.
IT
E
M
DA
T
E
RE
V
I
S
I
O
N
S
SHEET NO.
CHECKED BY:
DRAWN BY:
DESIGN BY:
5725 NORTH DISCOVERY WAY
BOISE, IDAHO 83713
PHONE (208) 639-6939
kmengllp.com
FA
I
T
H
L
A
N
D
I
N
G
C
L
U
B
H
O
U
S
E
68
1
9
N
O
A
H
C
O
U
R
T
,
C
A
L
D
W
E
L
L
,
I
D
8
3
6
0
5
LA
N
D
S
C
A
P
E
D
E
T
A
I
L
S
L2.0
22-093
11/25/24
AY
WHB
WHB
FO
R
A
G
E
N
C
Y
A
P
P
R
O
V
A
L
P:
\
2
2
-
0
9
3
\
C
A
D
\
L
A
N
D
S
C
A
P
E
\
C
O
N
S
T
R
U
C
T
I
O
N
P
L
A
N
S
\
2
2
-
0
9
3
C
D
L
A
N
D
S
C
A
P
E
P
L
A
N
.
D
W
G
,
AL
Y
S
S
A
Y
E
N
S
E
N
,
11
/
2
7
/
2
0
2
4
,
DW
G
T
O
P
D
F
.
P
C
3
,
24
X
3
6
L
[
P
D
F
]
1
RE
V
#
1
-
C
I
T
Y
C
O
M
M
E
N
T
S
10
/
1
4
/
2
4
A
AD
D
E
N
D
U
M
10
/
3
/
2
4
2
RE
V
#
2
-
C
I
T
Y
C
O
M
M
E
N
T
S
11
/
2
5
/
2
4
STATE OF IDAHO
LICENSED LANDSCAPE ARCHITECT
ALYSSA YENSEN
LA-1657711/27/24
BC24-000142 12/11/2024