Loading...
HomeMy WebLinkAboutItemizedBid_FaithLandingClubHouse_V1Product/Service Description Qty.Unit Price Total Fine Grade Does not include topsoil 1 $3,857.00 $3,857.00 Hunter Irrigation system Hunter Irrigation system value engineered to meet requirements of landscape design due to no irrigation plan at time of bid. Comes with one year warranty for parts and labor. 1 $15,000.00 $15,000.00 Plant Material Installed as per drawing. Comes with one year warranty.1 $15,721.00 $15,721.00 Weed fabric and Decorative Gravel Installed in all planter areas. 3" Depth Permabark (Rock) Mulch Commercial graded weed Fabric 1 $7,111.00 $7,111.00 Sod Installation Installed as per drawing.1 $10,276.00 $10,276.00 Not included Top Soil Topsoil Price is to be billed per yard and includes placement and trucking. 12" Depth in lawn areas 18" Depth in planter areas Up to but not to exceed 1105 yards 1105 $55.00 $60,775.00 This quote is valid for the next 30 days, after which values may be subject to change. By signing, I authorize all work to be performed. I agree to submit full payment upon completion and understand full payment is required to activate warranty and/or make any changes. Signature: _____________________ Date: _____________ Total $51,965.00 URNESS INDUSTRIES, LLC. 19560 Lower Pleasant Ridge Road. Caldwell, ID. 83607 Scott Hedrick Construction Faith Landing Clubhouse 6819 Noah Court Caldwell, Idaho 83605 Estimate #5769 Sent on 12/16/2024 Phone 208.866.1955 Email ar@urnessindustries.com Estimator:Justine Project Name Faith Landing Clubhouse Landscape Install