Loading...
HomeMy WebLinkAbout2730-ID - Farmway and Ustick Emergency Vehicle Access Addendum GEOTECHNICAL | ENVIRONMENTAL | MATERIALS January 28, 2026 Project No. 2730-ID Todd Campbell Construction, Inc 2560 N Stokesberry Meridian, Idaho 83642 Attention: Dean Waite Subject: Emergency Access Road Farmway Crossing Subdivision – Located at 4202 Farmway Road, Caldwell, ID 83605 Reference: Geotechnical Evaluation for “Ustick and Farmway” a(n) ± 44.45 Acre Site- Located at 4202 Farmway Road, Caldwell, ID 83605, GeoTek Project No. 2730-ID, Dated June 26, 2024 This document presents an addendum to the above referenced Geotechnical Evaluation. As requested by Ardurra, additional recommendations are presented below pertaining to emergency access roads supporting 80,000 lb. Fire Apparatus. The recommendations contained in the referenced report that are not superseded by the recommendations presented herein, should be properly incorporated into continued development of the site. Emergency Vehicle Access Road Based on a R-Value of 8 and a Traffic Index of 6 taken from the above referenced geotechnical evaluation, it is recommended that 2.5 inches of HMA over 4 inches of ¾” minus aggregate base over 12 inches of uncrushed aggregate subbase be used as a paved road section in order to support the roadway use by an 80,000 lb. Fire Apparatus. Aggregate Base and Subbase gradation specifications requirement per the current edition of the Idaho Standards for Public Works Construction (ISPWC) Manual. Materials shall be placed in accordance with ISPWC Standard Specifications for Highway Construction. Maintenance may be required depending on traffic and weather conditions. City of Caldwell APPROVED FOR CONSTRUCTION These plans and/or specifications have been reviewed for compliance with the City of Caldwell specifications. This review does not relieve the owner, engineer, or contractor of the responsibility to design and/or construct these facilities in compliance with all current applicable federal, state, and local laws, rules, regulations, ordinances, orders of decisions, development agreements, or specifications. Inconsistencies not isolated by City staff shall not be construed as approved unless specifically addressed as a variance and granted by City Council as a variance. The City retains the right to enforce provisions of said document and policies even if inconsistencies are not noted by the City. Any revisions of these approved plans will require a resubmittal for a full review and approval. Name:Martin Gergen FARMWAY AND USTICK JANUARY 28, 2026 TODD CAMPBELL CONSTRUCTION, INC PAGE 2 PROJECT NO. 2730-ID GeoTek, Inc. LIMITATIONS The materials encountered on the project site and utilized in our laboratory study are believed representative of the area; however, soil materials vary in character between excavations and conditions exposed during mass grading. Site conditions may vary due to seasonal changes or other factors. GeoTek, Inc. assumes no responsibility or liability for work, testing, or recommendations performed or provided by others. Since our study is based upon the site materials observed, selective laboratory testing and engineering analysis, the conclusions and recommendations are professional opinions. These opinions have been derived in accordance with current standards of practice and no warranty is expressed or implied. Standards of practice are subject to change with time. The opportunity to be of service is greatly appreciated. If you have any questions concerning this report or if we may be of further assistance, please do not hesitate to contact the undersigned. Respectfully submitted, GeoTek, Inc. Eirik Berggren P.E. Kyle C. Miley, PE Project Engineer Project Engineer Enclosures: Appendix A, Gravel Equivalency Calculations FARMWAY AND USTICK JANUARY 28, 2026 TODD CAMPBELL CONSTRUCTION, INC PAGE 3 PROJECT NO. 2730-ID GeoTek, Inc. APPENDIX A FARMWAY AND USTICK JANUARY 28, 2026 TODD CAMPBELL CONSTRUCTION, INC PAGE 4 PROJECT NO. 2730-ID GeoTek, Inc. Design Type Two (Asphalt + Gravel + Pit Run) Asphalt Mat Thickness (GE=1.95) (Set) Asphalt Thickness Desired = 2.50 Inches 0.20833 Feet GE2 = Asphalt (Gravel Equivalent) GE2 = (GE of 1.95) x (Asphalt Thickness) 0.40625 Feet Gravel Leveling Course (GE = 1.10) (Set) Gravel Thickness Desired = 4.00 Inches 0.33333 Feet GE3 = Gravel (Gravel Equivalent) GE3 = (GE of 1.10) x (Gravel Thickness) 0.36667 Pit Run Base Course (GE = 1.00) GE4 = Pit Run (Gravel Equivalent) GE4 = GE1 - (GE2+GE3) 0.99348 GE4/1.00 0.99348 Feet = 11.92 Inches